Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"
The total number of children and staff members onsite may not exceed the amount
Last Modified: 02/15/2024
Summer Daze does not distribute a cumulative total of day camp fees or reprint
Last Modified: 02/16/2024
The person or property owner shall pay the total cost to the City of removal prior
Last Modified: 02/02/2023
• “Lowest height of roof and new build is wanted for privacy with neighbors = 5 total
Last Modified: 02/17/2023
In fact, total cut-through traffic in the neighborhood declined from January 2022
Last Modified: 11/22/2023
CASKET SPACES SINGLES 624 COMPANIONS 348 696 TOTAL
Last Modified: 08/20/2026
Last Modified: 05/05/2026
b.Total length of all walls to be demolished divided by total length of all existing
Last Modified: 04/13/2021
Final Date:Permit Status: Convert 363 SF garage into an ADU and add 196 SF (559 SF total
Last Modified: 10/01/2026
Last Modified: 02/25/2026
LANDSCAPING 853 s.f. 1233 TOTAL FRONT YARD 2669 s.f....LANDSCAPING 853 s.f. 1233 TOTAL FRONT YARD 2669 s.f.
Last Modified: 08/07/2023
areas of non-native grassland/disturbed ground covering approximately 1.4 acre in total...areas of non-native grassland/disturbed ground covering approximately 1.4 acre in...
Last Modified: 10/20/2026
2025Permit Final Final Date:Permit Status: ADD NEW BEDROOM, BATHROOM, AND DINING ROOM (TOTAL
Last Modified: 04/04/2025
When the total debt financing would not impose an unreasonable burden on the City
Last Modified: 02/13/2026
Last Modified: 09/17/2025
Last Modified: 07/16/2026
TEEN Summer Daze does not distribute a cumulative total of day camp fees or reprint
Last Modified: 12/21/2022
Showing 2,241 to 2,260 of 2,433 entries.