Search Results

Showing results for "dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar"

No results were found that matched the keywords: dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar.
Search Results

Aquatics

Burbank Aquatics includes lap swim, recreational swim, swim teams, learn-to-swim classes, aquatic fitness classes and pool rentals.

Last Modified: 11/20/2026

2025 FEB FINALED

Water heated under separate permit: No additional structural work....INFILL; REPLACE/INSTALL UP TO (10)OUTLETS/SWITCHES & (5)LIGHT FIXTURES; REPLACE...

Last Modified: 03/10/2025

UpperLARiver_Draft_Appendix4a.pdf

water....can be installed to simultaneously monitor relative humidity, air temperature, solar...Depending on the power requirements, a...

Last Modified: 03/25/2021

How to Find SIC.pdf

Determine if the business’s primary SIC Code(s) is regulated by the State Water...Resources Control Board by referring to the State Water Resources...

Last Modified: 03/30/2021

20201210.FY20_21FeeScheduleADOPTED.pdf

, recessed wall heater, floor-mounted $138.80 Each unit heater (4) Heating appliance...Heater $46.95 Each (4)...

Last Modified: 06/20/2022

20201210.FY19_20FeeScheduleADOPTED.pdf

, recessed wall heater, floor-mounted $138.80 Each unit heater (4) Heating appliance...Heater $46.95 Each (4)...

Last Modified: 06/20/2022

3425 Brace Canyon - Decision Letter.pdf

If the proposed pool/spa contains salt water, please note that salt water pool/...BURBANK WATER AND POWER ...

Last Modified: 04/22/2022

2021_Burbank2035 Final Environmental Impact Report (Comments Responses on the Draft EIR, Corrections and Revisions to the Draft EIR, Mitigation Monitoring and Reporting Program).pdf

► Require all land uses to maximize the use of solar energy, including solar panels..., by installing the maximum possible number of...

Last Modified: 07/29/2021

Hearing: Adoption of a Resolution Approving Increases to City Fees and Charges for Water

Hearing: Adoption of a Resolution Approving Increases to City Fees and Charges for Water

Last Modified: 06/02/2025

420 S Sunset Canyon Rd - Approved Plans

AND CONNECTED TO AN APPROVED WATER SUPPLY (R306.4)....WATER HEATER MUST BE STRAPPED TO WALL. (SEC.507.3, LAPC)...

Last Modified: 08/03/2026

Hearing - Adoption of a Resolution Approving Increases to City Fees and Charges for Water

Hearing - Adoption of a Resolution Approving Increases to City Fees and Charges for Water

Last Modified: 05/25/2023

Attachment 8.CIP - Budget Public Hearing 6.3.25

BWP 200,000 200,000 400,000 24410 EcoCampus Solar & Storage BWP 5,000,000...Mains BWP 650000 600000 1050000 1700000 150000 5600000 9750000 24446 Recycled...

Last Modified: 05/22/2025

Attachment 8 - Budget Public Hearing 6.4.24.pdf

City Hall Ftn Restr & Mdrn FAC PW 103,500 852,000 955,500 24734 City Hall Turf Watering...292,900 23727 Capon Cap Bank Control Upgrade BWP 100,000 100,000 23803 Citywide...

Last Modified: 05/24/2024

Att10 - Planning Commission Resolution, Staff’s Report, and Minutes from the October 12, 2026, Planning Commission Meeting

heaters) shall be electric-powered EnergyStar-certified or of equivalent energy...heaters) shall be electric-powered EnergyStar-certified or of...

Last Modified: 11/05/2026

20211209-AFR-Year-Ending-June-30-21.pdf

Project Desert Harvest II Solar Project The Desert Harvest II Solar Project is...a 70 MW solar project located in...

Last Modified: 12/09/2021

20211209-AFR-Year-Ending-June-30-2021.pdf

Project Desert Harvest II Solar Project The Desert Harvest II Solar Project is...a 70 MW solar project located in...

Last Modified: 12/10/2021

Planning_ 2021_ 3700 Riverside Appendix 11.1_ISNOP.pdf

Specifically, this measure requires the installation of solar hot water heaters...Based on Table B-6 of the GGRP, the...

Last Modified: 11/29/2021

20210401_3700RD_Initial_Study_Review_Draft.pdf

Specifically, this measure requires the installation of solar hot water heaters...Based on Table B-6 of the GGRP, the...

Last Modified: 04/12/2021

Draft Environmental Impact Report (DEIR) (LaTerra).pdf

The Project site is the former location of the General Water Heater Company (GWHC...The City will require installation of...

Last Modified: 05/04/2021

20220227-AFR-Year-Ending-June-30-22.pdf

Project Desert Harvest II Solar Project The Desert Harvest II Solar Project is...a 70 MW solar project located in...

Last Modified: 02/27/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet