Showing results for "dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar"
Last Modified: 09/17/2025
Description
Last Modified: 07/30/2026
Last Modified: 08/26/2026
economic development project funds totaling $742,103 will assist in funding a solar...Management System Upgrade and Update 306,250 1,750,000 2,056,250 Municipal Rooftop...
Last Modified: 10/26/2021
352,801.89$ DAVIS, RONALD GEN MGR-BWP BWP:BURBANK WATER...Other Pay and Cash Benefits Gross Pay ANDREWS, JOHN SR LINE MECH-G BWP:BURBANK...
Last Modified: 01/20/2021
indicating the urgency of Southern California’s need to save water....The action calls for water agencies to reduce their...
Last Modified: 09/02/2021
322,720.54$ DAVIS, RONALD GEN MGR-BWP BWP:BURBANK WATER...Pay and Cash Benefits Gross Pay COMAN, KERRY INSTRUMENT CTRLS SUPV BWP:BURBANK...
Last Modified: 12/22/2020
, water heaters, and boilers....Accelerate drying process with dehumidifiers, fans, and/or heaters....Accelerate...
Last Modified: 12/13/2024
Pay Other Pay and Cash Benefits Gross Pay DAVIS, RONALD GEN MGR-BWP BWP:BURBANK WATER...and Cash Benefits Gross Pay CASSIDY, JOHN MGR TELECOMMS&FACILITIES BWP:BURBANK...
276,171.08$ DAVIS, RONALD GEN MGR-BWP BWP:BURBANK WATER...Other Pay and Cash Benefits Gross Pay SIMAY, GREGORY AST GEN MGR-BWP BWP:BURBANK...
324,142.56$ DAVIS, RONALD GEN MGR-BWP BWP:BURBANK WATER...225,206.04$ BEITER, JOHN SR CTRL OP BWP:BURBANK WATER...Overtime Pay Other...
more than 3,000 acre feet of water annually, prepare and adopt an Urban Water Management...Further, urban water suppliers...
Last Modified: 06/04/2026
at Time of Separation Total Gross Pay SOMOANO, JORGE GEN MGR-BWP BWP:BURBANK WATER...275,851.10$ PATRICIO, BLAZE PWR SYSTEM OP II BWP:BURBANK...
Last Modified: 03/04/2021
Pay Overtime Pay Other Pay and Cash Benefits Gross Pay DAVIS, RONALD BWP:BURBANK WATER...224,218.65$ STODDARD, GENE BWP:BURBANK...
Time of Separation Total Gross Pay KRAMER, KENNETH PWR SYSTEM OP II BWP:BURBANK WATER...201,516.13$ WENZINGER, MICHAEL ENERGY TRADER-SCHEDULER BWP:BURBANK...
Last Modified: 03/15/2021
Showing 601 to 620 of 2,183 entries.