Search Results

Showing results for "dWA 0859 3970 0884 Biaya Renovasi Kitchen Set Kayu Sungkai Terpercaya Wates Kulon Progo"

No results were found that matched the keywords: dWA 0859 3970 0884 Biaya Renovasi Kitchen Set Kayu Sungkai Terpercaya Wates Kulon Progo.
Search Results

20210101_2814_W_Empire_Ave_NOI_Final.pdf

Power fees for providing electric service are Aid-in-Construction (AIC) charges set...LIVINGBEDROOM BATH KITCHEN 2 4 '- 3 " 19'-6" LIVING...

Last Modified: 08/30/2021

2814 Empire Plans.pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/20/2022

Attachment 4..pdf

SET IN THE NORTH END OF A 1.5'X18' CATCH BASIN 1.0 FT BACK OF THE CURB FACE AND 41...EXISTING PULL-BOX (WATER) TO BE REMOVED EXISTING PULL-BOX (ELECTRICAL) TO...

Last Modified: 10/27/2022

2025 MAY FINALED

C/O KITCHEN & BATHROOM SINKS AND 1 TOILET....EIGHT LIGHT FIXTURES, 12 OUTLETS, KITCHEN HOOD....remodel ((1) kitchen hood;...

Last Modified: 06/05/2025

2025 JAN FINALED

and Alteration 01/31/2025Permit Final Final Date:Permit Status: NON STRUCTURAL KITCHEN...INCLUDES 26 ELECTRICAL OUTLETS AND 27 FIXTURES, 1...

Last Modified: 02/04/2025

20230622_BHC-PlanningDevelopmentResubmittal_compressed.pdf

SPACE PER UNIT: (NOT REQ'D IN MDC-2 & MDM-1 ZONE) LANDSCAPING (R4-ZONE) (INCLUDES SET...6 " 1 0 ' - 8 " 3 3 ' - 5 " 12' - 6 3/4" 7' - 7" 20' - 1 3/4" 112 SF ...

Last Modified: 07/25/2023

2025 DEC FINALED

Status: Replace panel & add 20 light fixtures: 4 @ ea/bedroom, 9 living rm & 3 at kitchen...Final Date:Permit Status: SFD: 642 SF ADDITION, NEW MASTER BEDROOM, RE-LOCATED...

Last Modified: 01/02/2026

2025 JUN FINALED

12/2025Permit Final Final Date:Permit Status: UNIT B- NON-STRUCTURAL REMODEL OF KITCHEN...Remodel includes (2) closets, (N) kitchen pantry,...

Last Modified: 07/01/2025

420 S Sunset Canyon Dr_HDP-Decision Letter

officers, employees agencies, boards, commissions, or City Council to attack, set...| Woolueae S2 COUNTER SPACE IN KITCHEN SHALL HAVE A MAXIMUM...

Last Modified: 08/03/2026

November 3, 2026 Election Notices and Press Releases

Last Modified: 10/21/2026

2021_Planning_231 N. Niagara Plans 7.1.2021.pdf

BMC 10-1-603(E)(2)(A) AT LEAST 40 PERCENT OF THE LENGTH OF THE SECOND STORY IS SET...A301 FAR 1ST FLOOR: 1279.00 SF ± 20' - 3" 2' - 0" 241 SF LIVING 7 514 SF ...

Last Modified: 07/07/2021

1048 Sherlock Dr - (4-16-25)

THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET FORTH BY THE EXECUTIVE...THE HEATER THAT ALLOWS SHUTTING OFF THE HEATER WITHOUT ADJUSTING THE THERMOSTAT...

Last Modified: 06/23/2025

2025 AUG FINALED

11/2025Permit Final Final Date:Permit Status: UNIT H- NON-STRUCTURAL REMODEL OF KITCHEN...:Permit Status: 970 sf 2nd floor addition, 77 sf 1st floor addition and 200 sf...

Last Modified: 09/02/2025

3209 Castleman Ln Approved Plans.pdf

THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET FORTH BY THE EXECUTIVE...CONTROLS CAPABLE OF ADJUSTMENT FROM THE LOWEST TO THE HIGHEST ACCEPTABLE TEMPERATURE...

Last Modified: 12/14/2022

20210914_Homeless_Resource_Guide_2019.pdf

Los Angeles, CA 90010 (323) 939-0506 √ Lord's Kitchen Location rotates every week...Each program has its own eligibility requirements set by...

Last Modified: 09/14/2021

2021_Planning_802 E. Angeleno - Architectural - 08.05.21.pdf

SHALL WALL HEATER WITH SET BACK THERMOSTAT W/ 35,000 BTU HEATER SHALL BE CAPABLE...(R306.1 AND R306.2) ND A KITCHEN (R306.1 AND R306.2) D A...

Last Modified: 08/26/2021

2026 MAR FINALED

2026Permit Final Final Date:Permit Status: 800 SF INTERIOR REMODEL TO INCLUDE: KITCHEN..., LIVING AND 2 BATHROOMS; NEW WINDOW IN KITCHEN, REPLACE...

Last Modified: 04/03/2026

20251126-24-25_DIF_Annual_Report-001.pdf

The kitchen's rotting particle board emits a foul odor on a consistent basis....The kitchen requires commercial- level quality and equipment to...

Last Modified: 11/26/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet