Search Results

Showing results for "dWA 0859 3970 0884 Kontraktor Interior Rumah Mewah Klasik Modern WIlayah Jatisrono Wonogiri"

No results were found that matched the keywords: dWA 0859 3970 0884 Kontraktor Interior Rumah Mewah Klasik Modern WIlayah Jatisrono Wonogiri.
Search Results

Modernization of Two Escalators Design-Build Services: RFP E25-04

Modernization of Two Escalators Design-Build Services RFP E25-04 The...qualified firms to provide proposals in response to the Requests for Proposals for...

Last Modified: 12/06/2024

City of Burbank Awarded $9.95 Million Grant to Build a Modern Central Library

been awarded a grant of $9.95 million from the CA State Library to fund a new, modern...awarded a grant of $9.95 million from the California State Library to fund a new,...

Last Modified: 10/16/2023

Crime Victim Information

Find resources and support for crime victims, including information on victim rights, domestic violence, elder abuse, and California laws like Megan’s and Marsy’s Law.

Last Modified: 10/14/2025

Downtown Burbank Metrolink Station Elevator Waterproofing and Modernization Project

Station and the Olive Avenue bridge will be closed as the structure and elevator are modernized...Station and the Olive Avenue bridge will be closed as the structure and...

Last Modified: 07/23/2024

CIP Updates Continued Projects

, appliances, and lighting, replace existing interior finishes, and selective furnishings...the elevator's systems, equipment, fixtures, and cab...

Last Modified: 03/03/2025

CIP Updates New Projects

new building components, all aspects of facility related infrastructure such as; Interior...2023. 13 Verdugo Water Slides 24560 Diego Cevallos Application of gel coating...

Last Modified: 03/03/2025

CIP Updates Completed Projects

sanitary sewer, & fire suppression systems, energy efficient windows and lighting, interior...2023. 13 Verdugo Water Slides 24560 Diego Cevallos Application of gel...

Last Modified: 03/03/2025

20251126-24-25_DIF_Annual_Report-001.pdf

appliances, and lighting, replacing ceiling tiles, new flooring, replace existing interior...The modernization will include the complete...

Last Modified: 11/26/2025

20260422-2025 DIF Report for Website-001.pdf

appliances, and lighting, replacing ceiling tiles, new flooring, replace existing interior...The modernization will include the complete...

Last Modified: 04/22/2026

20260422-2025 DIF Report for Website-001 (1).pdf

appliances, and lighting, replacing ceiling tiles, new flooring, replace existing interior...The modernization will include the complete...

Last Modified: 04/22/2026

Attachment 8 - Budget Public Hearing 6.13.23.pdf

PW 34,500 322,000 356,500 23018 Fuel Systems Modernization PW 370,000 370,000...Replacement PS 80,000 85,500 85,500 87,479 89,484 91,537 490,290 1,009,791 24709...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (1).pdf

PW 34,500 322,000 356,500 23018 Fuel Systems Modernization PW 370,000 370,000...Replacement PS 80,000 85,500 85,500 87,479 89,484 91,537 490,290 1,009,791 24709...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (2).pdf

PW 34,500 322,000 356,500 23018 Fuel Systems Modernization PW 370,000 370,000...Replacement PS 80,000 85,500 85,500 87,479 89,484 91,537 490,290 1,009,791 24709...

Last Modified: 06/02/2023

202107_2311_N_Hollywood_Way_ApxC1_HistoricResourcesAssessment_reduced.pdf

He designed in the Mid Century Modern and Post Modern styles during his career....to the interior of the building....His...

Last Modified: 07/09/2021

2931 Olney Place - Decision Letter with Attachments.pdf

• The deck structure is set back 10’-0” from the interior side property lines...The planting area shall have a minimum interior dimension of five...

Last Modified: 02/25/2022

Attachment 8.CIP - Budget Public Hearing 6.3.25

22365 Orange Grove Park Struct FAC PW 1,378,286 1,378,286 23018 Fuel Systems Modern...Service (New Policy) BWP 10000 10000 10000 10000 10000 10000 60000 120000 23371...

Last Modified: 05/22/2025

20241202-DIF Report for Website-001

000000 - No Project - - CD33B Fire 70019 - B0000 - None 24824 - FS 11 Kitchen Modern..., software, hardware, casework, and fixtures required to replace and...

Last Modified: 12/02/2024

Attachment 8 - Budget Public Hearing 6.4.24.pdf

FAC FD 46,000 300,000 346,000 24824 FS 11 Kitchen Modern FAC PW 200,000 200,000...Hydrant Replacement BWP 165,500 85,500 87,479 89,484 91,537 490,290 1,009,790 24709...

Last Modified: 05/24/2024

20260422-2024 DIF Report for Website-001.pdf

000000 - No Project - - CD33B Fire 70019 - B 0000 - None 24824 - FS 11 Kitchen Modern...The modernization will include the complete integration...

Last Modified: 04/22/2026

20210101_3209_N_Castleman_Lane_Decision.pdf

The planting area shall have a minimum interior dimension of five square feet....more than two stories in height; • Non-structural or non-seismic storefronts,...

Last Modified: 04/13/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet