Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"
BIKEWAY – Typically called a bike path, this provides for bicycle travel on a paved...Primarily the pathway from this point would be paved in...
Last Modified: 02/05/2021
Additional impacts to street triggered by this project could extend the paving...All off-street parking areas and accessways shall be graded,...
Last Modified: 10/27/2022
Last Modified: 03/23/2026
2023 8 122 0 122 0 Building Construction 2024 1/1/2024 12/31/2024 8 366 0 273 93 Paving...05 0 Building Construction 2024 0 0.11167949 0.0059963 0 0.00012285 6.59589E-06...
Last Modified: 07/09/2021
LANDSCAPE DETAILS AND SPECIFICATIONS PROPOSED COVERED PATIO PERMEABLE STONE PAVING...BELLOW THE STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM 4" ABOVE EARTH OR 2" ABOVE...
Last Modified: 05/18/2021
All off-street parking areas and accessways shall be graded, paved, and marked as...All paved areas used for parking, loading, or vehicle...
Last Modified: 06/26/2023
Enhanced stamped paving at main project entry....Small open space area with seating area with raised planters & enhanced paving on...22 1618 15 4...
Last Modified: 05/14/2024
(CRC R401.3 exception, CBC 1804.4) Grading and Paving: Plans shall indicate how...(CRC R106.2, CBC 107.2.6) All existing and new driveways, driveway curb cuts,...
Last Modified: 09/08/2026
Last Modified: 05/02/2023
Last Modified: 06/29/2023
Experiencing a problem? Use one of our City Services to help solve it!
Last Modified: 10/01/2026
The entire project site is paved with ornamental landscaping along the perimeter...The entirety of the project site is paved except for...
Last Modified: 04/12/2021
32,794 23008 Downtown Ped Improvements CD 117,206 117,206 24184 FY 21-22 Annual Res Paving
Last Modified: 05/13/2021
ALL LANDSCAPED AND PAVED AREAS SHALL BE MAINTAINED IN A NEAT AND ORDERLY CONDITION
Last Modified: 05/19/2021
Blvd Reconfig (Phase 1) CD 187,000 358,000 545,000 24184 FY 21-22 Annual Res Paving
Last Modified: 05/12/2022
GRADED BASIN OR PAVING (BY OTHERS). 7.
Last Modified: 07/11/2023
applicant will have to restore the street fronting the property per City of Burbank paving
Last Modified: 07/20/2021
Blocks towards the Media District typically have fully paved 15 foot wide sidewalks...These include paved areas, buildings, bridges, and other...
Last Modified: 06/26/2026
As depicted on Exhibit 2-5a through 2-5c, all setback and non-paved areas would...The project site is paved with minimal ornamental landscaping...
Last Modified: 11/29/2021
flange at stucco siding placed a minimum of 4 inches above earth or 2 inches above paved...implemented to manage storm water drainage during construction. 4.106.3...
Last Modified: 11/15/2024
Enhanced stamped paving at main project entry....19. 12 4 10 1 6 62 19 3 20. 7 2020206 21. 21 21 21 21 21 5 Stamped Paving
Last Modified: 07/06/2023
Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...
Last Modified: 05/24/2023
Enhanced stamped paving at main project entry....174124221618 15 4 4 7 12 4 6 126 13 7 19. 12 6 6 19 76 8 1 5 Stamped Paving
Last Modified: 01/11/2024
LEVELED AREAS, INCLUDING ASPHALT PAVING, SHALL HAVE MINIMUM GRADES FOR DRAINAGE...DRIVEWAY GRADES EXCEEDING 10% SHALL BE PAVED. 21.
Last Modified: 04/13/2021
PAVING AT PLAZA (N) CONC. PAVING AT ALLEY. SLOPE TO DRAIN....PERMEABLE PAVING AT DOG RUN 8'-0" TALL SITE WALL AT ...
Last Modified: 10/13/2022
Last Modified: 06/22/2021
TOP OF PAVING T.S. TOP OF SLAB T.W. TOP OF WALL TYP. TYPICAL U.N.O.
Last Modified: 02/07/2025
Last Modified: 03/03/2025
Blvd Reconfig (Phase 1) CD 1,187,000 358,000 1,545,000 24184 FY 21-22 Annual Res Paving
Last Modified: 05/24/2024
applicant will have to restore the street fronting property per City of Burbank paving
Last Modified: 07/22/2024
Last Modified: 09/22/2026
275,000 275,000 K-58 Pass, Clark to Magnolia BWP 300,000 300,000 K-59 Paving...Building Ontario Substation would pave the way to retiring...
Last Modified: 12/10/2020
existing on-site single-family and multi- family residential buildings and associated paving...The Project Site is currently covered by paved...
Last Modified: 01/07/2025
Approximately 3.5 total acres would be paved....Fifty percent of material used for asphalt paving would be recycled asphalt....Construction would...
Last Modified: 12/13/2024
Last Modified: 12/28/2021
Last Modified: 10/18/2024
BACKER ROD DECORATIVE NICKLE-BRONZE NOZZLE: ZURN Z199 SPLASHBLOCK AT ALL A/C PAVING...CONCRETE FOOTING, SEE STRUCTURAL DRAWINGS TOP OF CONCRETE OR ASPHALT CONCRETE ...
Last Modified: 04/18/2024
Showing 241 to 280 of 500 entries.