Search Results

Showing results for "dWA 0859 3970 0884 Biaya Bikin Kitchen Set Hotel Custom Magelang Selatan Magelang"

No results were found that matched the keywords: dWA 0859 3970 0884 Biaya Bikin Kitchen Set Hotel Custom Magelang Selatan Magelang.
Search Results

Appendix B - Phase I ESA.pdf

Permit for six water closets, six lavatories, six bathtubs, six kitchen sinks, and...Photo 8: View of typical kitchen located within 2335 North...

Last Modified: 01/07/2025

Attachment 8. FY 2022-23 Budget Public Hearing 5.24.22.pdf

Adopted Budget SUMMARY OF PROJECTS BY CATEGORY FY2022-23 City of Burbank 23742 Customer...23006 Media District 12kV Capacity PS 9,191,904 17,396,696 26,588,600 21938...

Last Modified: 05/12/2022

Att2 - Heritage Commission Report dated June 5, 2025

, wood-framed, arched, fixed window with divided lites and pronounced molding set...porte cocheres • Hollywood style (center grass) or a fully paved driveway •...

Last Modified: 08/28/2025

Attachment 2 - Redline Ordinance_markup.pdf

related to the operational characteristics of the road as measured by standards set...on the first day of July each year beginning July 1, 2007, by an adjustment as...

Last Modified: 05/26/2022

20260422-DIFA2-001.pdf

related to the operational characteristics of the road as measured by standards set...on the first day of July each year beginning July 1, 2007, by an adjustment as...

Last Modified: 04/23/2026

11/16/21 - PH - Attachment 7

(I)  The rent for at least 20 percent of the units in the development shall be set...(II)  The rent for the remaining units in the development shall be...

Last Modified: 11/04/2021

2025 Grading Shoring Correction List

• Sets must be deemed complete....• See the marked-up set of plans for additional corrections....Comply with approval conditions and attach a copy...

Last Modified: 05/28/2026

IMPORTANT CONSTRUCTION NOTICE FRONT ST / MAGNOLIA BL / VARNEY ST Lane Closures Scheduled May 26, 2026 through June 6, 2026

required over the following month, extending into summer, but schedules are not set...Parking restrictions should be set up to limit the impact on...

Last Modified: 05/07/2026

STREAMLINED MINISTERIAL REVIEW PROCESS APPLICATION (DEC 2024)

Project Plans - Electronic Set (see Standard Plan Details & General Requirements...officers, employees, agencies, boards, commissions, or City Council to attack,...

Last Modified: 12/30/2024

Streamlined Ministerial Review Process Application_11082024

of Burbank with all Attachments (SB35 Projects Only) Project Plans - Electronic Set...officers, employees, agencies, boards, commissions, or City Council to attack,...

Last Modified: 11/12/2024

2019 W Magnolia_Public Notice

at: www.burbankca.gov/pendingprojects  Please contact the project planner to set...at: www.burbankca.gov/pendingprojects  Please contact the project planner to...

Last Modified: 03/25/2026

221 N San Fernando Rd_Public Notice.pdf

www.burbankca.gov/pendingprojects  Please contact the project planner to set...www.burbankca.gov/pendingprojects  Please contact the project planner to...

Last Modified: 01/09/2024

2957 N Brighton Ave - Public Notice

: www.burbankca.gov/pendingprojects  Please contact the project planner to set...: www.burbankca.gov/pendingprojects  Please contact the project planner to...

Last Modified: 01/13/2025

Friends of the Burbank Public Library Celebrate 45 Years of Service with Major Investment in Library Bookmobile

decision earlier this year, the Friends committed up to $250,000 for the purchase and customization

Last Modified: 07/22/2025

Lilia Sahagun Employee of the Year Nomination

Workers’ Compensation Program, establishing a culture centered on exceptional customer

Last Modified: 10/21/2026

11/16/21 - PH - Attachment 1

incorporate all feasible mitigation measures, performance standards, or criteria set...all applicable feasible mitigation measures, performance standards, or criteria...

Last Modified: 11/04/2021

Plans.pdf

AutoCAD SHX Text SPECIAL INSPECTOR AutoCAD SHX Text ITEMS AutoCAD SHX Text SIMPSON SET-XP...FIXTURES INCLUDE WATER CLOSETS, URINALS, SHOWERHEADS, LAVATORY FAUCETS, AND...

Last Modified: 04/06/2022

2021_Planning_ADU HANDOUT (6.28.2021).pdf

➢ A cooking facility with appliances that meet the definition of Kitchen as defined

Last Modified: 06/28/2021

20210401_ADU_Handout.pdf

➢ A cooking facility with appliances that meet the definition of Kitchen as defined

Last Modified: 04/15/2021

1100 W ANGELENO AVE - combined 10.3.23.pdf

EXISTING DINING NEW ENTRY EXISTING BATH NEW KITCHEN NEW BATH 19'-9" 9'-2...NEW GREAT ROOM 4'-6" 5'-0" SLIDER EXISTING DUAL PER TITLE 24 102 EXISTING NEW...

Last Modified: 10/26/2023

20210204-Bicycle-Master-Plan-Initial-Study-NegDec-001.pdf

Surrounding Land Uses and Setting: The proposed city-wide Plan outlines proposed...be required on a project level basis at the time when and in the environmental...

Last Modified: 02/05/2021

Important Construction Notice: Lane Closures for Front St, Magnolia Blvd, and Varney St Jan 26-Feb 13

following months extending to late spring or early summer, but schedules are not set...Parking restrictions should be set up to limit the impact on...

Last Modified: 02/05/2026

20210610-Permit_Parking_Application_Petition_to_amend_an_existing_zone.pdf

Municipal Code criteria for the installation of a Permit-Only zone, the matter is set...may appeal such decision to the Permit Appeals Panel pursuant to the procedure...

Last Modified: 07/26/2021

20210610-Permit_Parking_Application_Petition-001.pdf

Municipal Code criteria for the installation of a Permit-Only zone, the matter is set...may appeal such decision to the Permit Appeals Panel pursuant to the procedure...

Last Modified: 07/26/2021

Attachment 3 - Maps.pdf

K EN N ETH R D C L Y B O U R N A V C A M B R ID G E D R S SU N SET...B O U R N A V C A M B R ID G E D R E V E R D U G O A V S SU N ...

Last Modified: 07/14/2022

800 S Main Street - Public Notice (Final)

: www.burbankca.gov/pendingprojects  Please contact the project planner to set...: www.burbankca.gov/pendingprojects  Please contact the project planner to...

Last Modified: 04/12/2024

SB1 Proposed Streets RMRA 24-25

fiscal year 2024/25 with Road Maintenance and Rehabilitation Account revenues, as set...The Financial Services Director is directed to include the list...

Last Modified: 04/25/2024

Public Notice Mailer - 636 N Mariposa St - FINAL send by May 27

, at 818-238-5250  E-mail the project planner at: [email protected]Set..., at 818-238-5250  E-mail the project planner at: [email protected] ...

Last Modified: 05/30/2024

800 S Main Street - Public Notice 5.14.24.pdf

at: www.burbankca.gov/pendingprojects  Please contact the project planner to set...at: www.burbankca.gov/pendingprojects  Please contact the project planner to...

Last Modified: 06/05/2024

City Council Expectations of Board, Commission and Committee Members 5.6.25

COMMISSION, AND COMMITTEE MEMBERS EXPECTATIONS:  Personal agendas must be set...Council’s goals and priorities as established during the annual City Council Goal...

Last Modified: 07/25/2025

2025 Community Arts Grant Program Recipients

program featuring company performances and audience discussion in a studio-like setting...video game music, played live to video of game play by a talented and diverse...

Last Modified: 08/12/2025

Attachment 8 Concession Letter.pdf

states that all structures within the Commercial Recreation (CR) zone shall be set...50052.5 of the Health and Safety Code, or for rents for the targeted units to be...

Last Modified: 10/20/2022

Public Notice- 1100 W Angeleno Ave_send by Oct 25.pdf

, at 818-238-5250  E-mail the project planner at: [email protected]Set..., at 818-238-5250  E-mail the project planner at: [email protected] ...

Last Modified: 10/26/2023

Public Notice - 840 E Verdugo Ave - Final.pdf

at 818-238-5250  E-mail the project planner at: [email protected]Set..., at 818-238-5250  E-mail the project planner at: [email protected] ...

Last Modified: 08/18/2022

ApxK_Transportation Study.pdf

Hollywood Way 1,014,890 sf industrial park, 166 room hotel, 142,250 sf office,...Aloft Hotels & Residence Inn 2500 N....Hollywood Way 420 room...

Last Modified: 07/09/2021

City Announces Sponsorship Opportunities for the 2025 Burbank Adaptive Sports Expo

Additional customized sponsorship packages are also available to suit the needs of

Last Modified: 12/06/2024

920 E Grinnell Dr - Project Plans - 12-16-22.pdf

KITCHEN SINKS, LAVATORIES, BATHTUBS, SHOWERS, KITCHEN SINKS, LAVATORIES, BATHTUBS...KITCHEN FAUCET 1.8 GPM @ 60 PSI ...

Last Modified: 02/09/2023

2022 Grading Shoring Correction List

. • Sets must be complete..... • See the marked-up set of plans for additional corrections....Applicant will be required to print out 1...

Last Modified: 02/09/2026

719 Wilson Ct - Approval Letter - FINAL

where, each of the conditions have been addressed in the building permit plan set...Exterior materials and designs shown on the approved set of...

Last Modified: 02/15/2024

Concession Request Letter_Pickwick_2022-02.pdf

states that all structures within the Commercial Recreation (CR) zone shall be set...50052.5 of the Health and Safety Code, or for rents for the targeted units to be...

Last Modified: 03/04/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet