Search Results

Showing results for "dWA 0859 3970 0884 Kontraktor Pemborong Interior Apartemen 1 Bedroom Daerah Gatak Sukoharjo"

No results were found that matched the keywords: dWA 0859 3970 0884 Kontraktor Pemborong Interior Apartemen 1 Bedroom Daerah Gatak Sukoharjo.
Search Results

Burbank Issues Curfew Monday, June 1, 5:00 PM to 6:00 AM Until Lifted

Burbank Issues Curfew Monday, June 1, 5:00 PM to 6:00 AM Until Lifted...Burbank, CA (June 1, 2020) – In an effort to be prepared and not...

Last Modified: 04/22/2021

Burbank Issues Curfew Monday, June 1, 5:00 PM to 6:00 AM Until Lifted

Burbank Issues Curfew Monday, June 1, 5:00 PM to 6:00 AM Until Lifted...Burbank, CA (June 1, 2020) – In an effort to be prepared and not...

Last Modified: 04/22/2021

3425 Brace Canyon - Approved Plans.pdf

-6" 3' 7'-8" 3' 1'-6" 15'-4" 1' 8'-8" 1'-6" 1 0 ' - 9 " 9 ' - 8 " ...

Last Modified: 04/22/2022

Attachment 8 - Budget Public Hearing 6.13.23.pdf

Rly Upd (4/12kV) PS 500,000 500,000 1,350,000 2,350,000 23143 Fiber Opt Svc FO-1...Replacement PS 80,000 85,500 85,500 87,479 89,484 91,537 490,290 1,009,791 24709...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (2).pdf

Rly Upd (4/12kV) PS 500,000 500,000 1,350,000 2,350,000 23143 Fiber Opt Svc FO-1...Replacement PS 80,000 85,500 85,500 87,479 89,484 91,537 490,290 1,009,791 24709...

Last Modified: 06/02/2023

Pending Projects

Last Modified: 07/28/2025

Att2 – Heritage Commission Report with Attachments Dated September 4, 2025

However, these alterations were done consistent with the Secretary of the Interior...Only the exterior of the house is proposed for designation; the ...

Last Modified: 01/29/2026

3313 Wedgewood Ln - Decision Letter - Signed.pdf

Area (Attachment A) ZONING: R-1 GENERAL PLAN: Low Density Residential...more than two stories in height; • Non-structural or non-seismic storefronts,...

Last Modified: 08/24/2023

24-4,010 SB 9

First Floor Minimum Setbacks (Street-facing side, Interior side and Rear Property...10-1-603(I)(9), and 10-...

Last Modified: 03/07/2024

Ordinance - 24-4,010 (SB 9)

First Floor Minimum Setbacks (Street-facing side, Interior side and Rear Property...10-1-603(I)(9), and 10-...

Last Modified: 04/11/2024

SR - 1521 E. Alameda Ave.pdf

603(C)(1) (Attachment 1)....603(C)(1)....of measuring height, the proposed home would be required to have a split-level...

Last Modified: 02/17/2023

FREE Adoptions for Adopt-a-Pet Day June 1, 2024

All adoption fees will be waived for Adopt-a-Pet day on Saturday, June 1st at the Burbank Animal Shelter. All adoption fees will be waived for Adopt-a-Pet day on Saturday, June 1st at...

Last Modified: 05/29/2024

DIG Burbank at McCambridge Park (Updated Location on 1/16)

DIG Burbank is a volunteer program that helps keep our parks beautiful. Volunteers pull weeds, mulch, plant, and pick up trash in Burbank parks! The work put in at a DIG Burbank event is a...

Last Modified: 01/16/2025

Townhall #1, Burbank Water and Power Proposed Rate Increases

The cost of providing our community with reliable and sustainable services continues to rise. This includes maintaining the equipment and parts that keep our lights on and the water flowing,...

Last Modified: 04/04/2025

Front Street Full Road Closure August 1-2

Please be advised of a full road closure of Front Street from Burbank Blvd to approximately 500' south of the Magnolia Bridge Overpass from 9PM on Friday, August 1st through 5PM on...

Last Modified: 07/29/2025

Downtown Burbank Sidewalk Enhancement Project Walking Tour #1

The City of Burbank is launching the planning process for the Downtown Burbank Sidewalk Enhancement Project and will host two community walking tours on Thursday, April 2, 2026, and Saturday, April...

Last Modified: 03/18/2026

11/16/21 - PH - Attachment 5

Interior finishes will favor formaldehyde- free finishes, low-allergen materials,...access from side  Individual access from front  Individual access from side or...

Last Modified: 11/04/2021

FY 2025-26 Effective 01.01.26 Adopted Fee Schedule

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 12/12/2025

FY 2025-26 ADOPTED FEE SCHEDULE FINAL

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 09/05/2025

Revised FY 2025-26 Adopted Fee Schedule FINAL

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 09/17/2025

20211229-FY-21-22-Fee-Schedule-Final.pdf

Park Facility Development Fee $152.00 Bedroom as Defined by BMC After 11/1/86...to 30 LF (ii) Additional partition, up to 30 LF $15.85 Each ...

Last Modified: 06/20/2022

20220331-FY-21-22-Fee-Schedule-Final-Rev-5.pdf

Contractual Services Cost** Application (B) Park Facility Development Fee $152.00 Bedroom...$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a)...

Last Modified: 06/20/2022

20211229-FY-21-22-Fee-Schedule-Final-Rev-3.pdf

Park Facility Development Fee $152.00 Bedroom as Defined by BMC After 11/1/86...$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close...

Last Modified: 06/20/2022

20210823-FY-21-22-Fee-Schedule-Finl-Rev. 2.pdf

Contractual Services Cost** Application (B) Park Facility Development Fee $152.00 Bedroom...$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close Existing Openings (a)...

Last Modified: 06/20/2022

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

Park Facility Development Fee $152.00 Bedroom as Defined by BMC After 11/1/86...$157.00 Each (b) Major (> 200 SF) $313.45 Each (4) Close...

Last Modified: 06/20/2022

Earthquakes

Earthquakes in Southern California can strike anytime. Learn how to prepare your home, build an emergency kit, create a family plan, and stay safe during and after a quake.

Last Modified: 01/27/2026

FY 2024-24 Adopted Fee Schedule revised

Description Amount Unit/Time (B) Park Facility Development Fee $157.00 Bedroom as...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 12/12/2024

2023092023-FY-23-24-Fee-Schedule-Final.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 09/20/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 07/10/2023

20230731-FY-23-24-Fee-Schedule-Final

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 07/31/2023

20230901-FY-23-24-Fee-Schedule_Final

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 09/01/2023

20230630-FY-23-24-Fee-Schedule-Final.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 07/10/2023

20231005-FY-23-24-Fee-Schedule_Final.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 10/05/2023

FY 2024-25 Adopted Fee Schedule

32 Description Amount Unit/Time (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 06/27/2024

FINAL for print FY 24-25 Fee Schedule Adopted_compressed.pdf

32 Description Amount Unit/Time (B) Park Facility Development Fee $157.00 Bedroom...$196.00 Each (b) Major (> 200 SF) $392.00 Each (4) Close Existing Openings (a)...

Last Modified: 09/04/2025

PROPOSED FY 2025-26 FEE SCHEDULE

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 05/01/2025

Adopted FY 2025-26 FEE SCHEDULE - Final

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 08/07/2025

20250625 (3).fy25_26feescheduleadopted.pdf

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 12/18/2025

20260317.FY26_27UPDATEDFEESCHEDULEEFF1.1.26

Hour (3) Cost ** Application/Deposit (B) Park Facility Development Fee $162.34 Bedroom...$202.66 Each (b) Major (> 200 SF) $405.33 Each (4) Close Existing Openings (a)...

Last Modified: 03/18/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet