Search Results

Showing results for "dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo"

No results were found that matched the keywords: dWA 0812 2782 5310 Total Biaya Renovasi Plafon Wc Murah Polokarto Sukoharjo.
Search Results

GGRP Update Draft_3.9.2022.pdf

In total, BWP was responsible for approximately 509,439 MT CO2e in 2019....Solid waste generated 2,712 MT CO2e, which represents nine percent of the...

Last Modified: 03/09/2022

20210301_AvionPlansPart1_Avion.pdf

In acres BUILDING AREA First Level Second Level Total COVERAGE AUTO PARKING...BLDG.O2 BLDG.O3 BLDG.O4 BLDG.O5 BLDG.O6 BLDG.O7 BLDG.O8 BLDG.O9...

Last Modified: 03/31/2021

2023-2024 Afterschool Daze and Kinder Club Parent Handbook .pdf

City of Burbank Parks and Recreation Department does not distribute a cumulative total...2024 $170 $344 4/1, 4/8, 4/15, 4/22 4/25/2024 $170 $344 4/29, 5/6, 5/13, 5/20 ...

Last Modified: 08/16/2023

Economic Development Annual Report 2021.2022.pdf

period in 2020, with visitor expenditures reaching $641 million, visitor volume totaling...August YTD report Source: Hotelplanner, 2021-2022 UP 54% COMPARED TO 2021 ...

Last Modified: 10/21/2022

Economic Development Annual Report 2021.2022.pdf

period in 2020, with visitor expenditures reaching $641 million, visitor volume totaling...August YTD report Source: Hotelplanner, 2021-2022 UP 54% COMPARED TO 2021 ...

Last Modified: 10/27/2022

2202 N Glenoaks Blvd - Plans.pdf

DINING AREA ( 506 SQFT) 15 NET 34 KITCHEN/ BACK OF HOUSE (889 SQ FT) 200 NET 5 TOTAL...TO SALES OR CONSUMPTION OF ALCOHOL 34 SQ FT + 42 SQ FT + 114 SQ FT = 190 SQ FT ...

Last Modified: 10/28/2022

Economic Development Annual Report 2021.2022.pdf

period in 2020, with visitor expenditures reaching $641 million, visitor volume totaling...August YTD report Source: Hotelplanner, 2021-2022 UP 54% COMPARED TO 2021 ...

Last Modified: 11/07/2022

20220216_50075_HCV_2022.pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 02/16/2022

50075-HCV -2022.pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 02/16/2022

20220216_50075_HCV_2022 (1).pdf

manages less than 250 public housing units and any number of vouchers where the total...or manages 250 or more public housing units and any number of vouchers where the...

Last Modified: 02/16/2022

2023-2024 Afterschool Daze and Kinder Club Parent Handbook .pdf

City of Burbank Parks and Recreation Department does not distribute a cumulative total...2024 $170 $344 4/1, 4/8, 4/15, 4/22 4/25/2024 $170 $344 4/29, 5/6, 5/13, 5/20 ...

Last Modified: 04/10/2023

ATTACHMENT 11.pdf

As shown in Table 2-2, these sources total 7,569, which falls short of the RHNA...Table 2-3 Projected Specific Plan Units Specific Plan Total Net...

Last Modified: 09/16/2022

2025 JUN ISSUED

TOTAL SF:4200....TOTAL SF:4200....TOTAL SF:3700.

Last Modified: 07/01/2025

2024-06 Treasurer's Report

average yield of the portfolio at cost at the end of the month is 3.58% and the total...2.38 887 US Treasury | No Limit 24,000,000 22,917,510 23,491,423 3.54 3.27 555 ...

Last Modified: 05/19/2026

2024-01 Treasurer's Report

average yield of the portfolio at cost at the end of the month is 3.44% and the total...Moody's expects Intel's total debt-to-EBITDA (Moody's...

Last Modified: 05/20/2026

Burbank Adds Re-roofing Permits to Online Services and Introduces Pre-Approved ADU Program

In total, there are 12 pre-approved ADU project plans that have been selected for

Last Modified: 01/31/2023

20240311-Utility-Users-Tax-Remittance-Fillable.pdf

Penalties (15%, if applicable) Interest (0.75 % monthly, if applicable) Total

Last Modified: 03/11/2024

Bond Health Clubs.pdf

Surety are held and firmly bound to all eligible members of the Principal, in the total

Last Modified: 03/12/2021

HEALTH CLUB - Bond.pdf

Surety are held and firmly bound to all eligible members of the Principal, in the total

Last Modified: 03/12/2021

City Council Meeting Attendance Reminders for October 15, 2024

Effective September 24, 2024: Speaker times will be determined based on the total

Last Modified: 10/14/2024

Table test

Note: Total permit fee includes either one or a combination of the following fees

Last Modified: 06/17/2025

FINAL Sign Application Submittal Checklist (Planning)_revised 08-12-25

Property Address: APN: Zone: Project Description: Sign Type/Material: Total

Last Modified: 10/23/2025

FINAL Temporary Banner Application Submittal Checklist (Planning)_revised 08-12-25

Property Address: APN: Zone: Project Description: Sign Type/Material: Total

Last Modified: 10/23/2025

Motor Training Summary July 2025.pdf

Motor Officer Training INSTRUCTORS: Motor FTO Rhoads & FTO Chapman LESSON TOTAL

Last Modified: 11/05/2025

20200324-complete-streets-plan.pdf

Of the total collisions studied in the five-year period, approximately 4.7% of...In the majority of the total pedestrian-vehicle collisions, the...

Last Modified: 03/24/2021

20210208-Complete-Streets-Plan-English-001.pdf

Of the total collisions studied in the five-year period, approximately 4.7% of...In the majority of the total pedestrian-vehicle collisions, the...

Last Modified: 02/08/2021

20260505-complete-streets-plan.pdf

Of the total collisions studied in the five-year period, approximately 4.7% of...In the majority of the total pedestrian-vehicle collisions, the...

Last Modified: 05/06/2026

Arch_Set-CUP_MSG-Dome-7-13-23.pdf

OCCUPANTS MINIMUM NUMBER OF EXITS (CBC TABLE 1006.2.1): 1 REQUIRED/ 2 PROVIDED TOTAL...ON-SITE PARKING PROVIDED: AutoCAD SHX Text 54 AutoCAD SHX Text...

Last Modified: 07/14/2023

910 S Mariposa St - Consistency Attachments.pdf

Government Code) The Project will dedicate a minimum of 10 percent of the total...The Project provides total of 47 spaces at 2.23 spaces/du,...

Last Modified: 11/21/2022

910 South Mariposa St - Consistency Attachments.pdf

Government Code) The Project will dedicate a minimum of 10 percent of the total...The Project provides total of 47 spaces at 2.23 spaces/du,...

Last Modified: 06/23/2023

State Bill 13.pdf

located within the same lot, and that it does not exceed a specified amount of total...(iv)  The total floor area of an attached accessory...

Last Modified: 11/18/2024

BFFCOU.pdf

The cumulative total hours will be reset at the beginning of each six month period...Accumulation The total vacation accumulation shall be...

Last Modified: 01/20/2021

Attachment 10 - Public Notices

The proposed WTF is comprised of a total of six antennas with accessory equipment...The proposed WTF is comprised of a total of six antennas with...

Last Modified: 10/18/2024

Exhibit F - Public Notices

The proposed WTF is comprised of a total of six antennas with accessory equipment...The proposed WTF is comprised of a total of six antennas with...

Last Modified: 07/22/2024

2020-AT&T-relief-customers-001.pdf

We are extending our original 80 hours of paid, excused time off to up to a total...We are extending our original 80 hours of paid, excused time off to up to a...

Last Modified: 03/29/2021

Youth Volleyball Fall 2021 WITH SCORES (6).pdf

25% Strikers 0-4 0% Minor Overall Record Win % Avg Pts Earned (total...points earned / total # of sets played) VolleyStars...

Last Modified: 11/21/2022

Full Plan Set 10.30.23.pdf

TOTAL SHRUBS PROPOSED: 820 QTY SHRUBS REQUIRED TO BE A MINIMUM OF 5 GAL: 82 QTY...(TYP) 2,440 SF TOTAL PARKING LOT AREA 755 SF 487 SF 1,242 SF...

Last Modified: 11/28/2023

Attachment 2 - Enforceable Agreements.pdf

The Project consists of six three-story residential structures containing a total...The Project consists of six three-story residential structures containing a...

Last Modified: 12/26/2023

Payee Registration Form rev 9.18.18

Resident (not Qualified with SOS) Government Partnership Performs services totally...Performs services totally outside California - an...

Last Modified: 06/25/2025

The Village at Fairview Project_HUD EA_PublicDraft_010725 - SIGNED.pdf

Level 1 3 5 3 1 12 Level 2 8 6 3 1 18 Level 3 8 6 3 1 18 Level 4 4 5 3 - 12 Total...HUD Funded Amount: $2,500,000 Estimated Total Project...

Last Modified: 01/07/2025

Residential Demo App (4.26.24)

Are you proposing a reduction in the total number of units which currently exist...Non-housing Development Project Total Residential Units...

Last Modified: 04/26/2024

DEMOLITION APPLICATION (July 2024) Clean.pdf

Are you proposing a reduction in the total number of units which currently exist...Non-housing Development Project Total Residential Units...

Last Modified: 07/01/2024

DEMOLITION APPLICATION (July 2024)

Are you proposing a reduction in the total number of units which currently exist...Non-housing Development Project Total Residential Units...

Last Modified: 12/13/2024

COVID-19 Relief Programs - Federal State and Local Final.xlsx

2021 • may request up to 2 additional 3-month extensions, max. 18 months total...forbearance • may request up to 2 additional 3-month extensions, max. 18...

Last Modified: 07/08/2021

3407 Viewcrest Dr. - HDP Project Plans.pdf

TOTAL AREA 5,646 SF/15329 = 37% 35'-8" E A1.1 F A1.1 G A1.1...206 SF OVER 12'-0" INTERIOR: 311 SF 29'-6" LOT COVERAGE Lot coverage...

Last Modified: 05/10/2023

Burbank Community Arts Grant_Guidelines (2).pdf

AWARDS AND USE OF FUNDS With $50,000 in total available funding in 2026, the Commission...You must provide a project budget where Total Project...

Last Modified: 09/09/2025

BMC-4-2-111.pdf

The report shall include information on the total number of customers served by...regular solid waste collection; total tonnage of solid waste...

Last Modified: 04/14/2026

Attachment 4 Project Plans and Subdivision Map...pdf

TOTAL PROVIDED OPEN SPACE TOTAL FRONT/SIDE SETBACK O.S. TOTAL O.S. (INCL....TOTAL LIVING 1816...

Last Modified: 10/20/2022

BFF-COU - 2024-2027 Final, fully signed.pdf

The cumulative total hours will be reset at the beginning of each six-month period...Accumulation The total vacation accumulation shall be...

Last Modified: 09/23/2024

3411 Viewcrest Dr - Final Plans.pdf

AREA OF (E) ROOF = 3,999.39 SF TOTAL AREA OF (E) ROOF TO BE DEMOLISHED = 239.07...= 208' LF / 635' LF = 32% TOTAL DEMOLISHED PERCENTAGE 5.9% + 32%...

Last Modified: 06/15/2023

SR - Firearm Retailers Second Step_Last Updated 7.13.22.pdf

27,898 0.06% 2019 31 28,648 0.11% 2020 36 27,392 0.13% 2021 28 27,357 0.10% TOTAL...Proximity Crime Totals by Category (2017-2021) 8 a...

Last Modified: 09/06/2023

SR - Firearm Retailers Second Step_Last Updated 7.13.22.pdf

27,898 0.06% 2019 31 28,648 0.11% 2020 36 27,392 0.13% 2021 28 27,357 0.10% TOTAL...Proximity Crime Totals by Category (2017-2021) 8 a...

Last Modified: 07/14/2022

Attachment 2 - July 26, 2022, Staff Report on Urgency Ordinance and Regulatory Framework (1).pdf

27,898 0.06% 2019 31 28,648 0.11% 2020 36 27,392 0.13% 2021 28 27,357 0.10% TOTAL...Proximity Crime Totals by Category (2017-2021) ...

Last Modified: 07/06/2023

Attachment 3 (1).pdf

27,898 0.06% 2019 31 28,648 0.11% 2020 36 27,392 0.13% 2021 28 27,357 0.10% TOTAL...Proximity Crime Totals by Category (2017-2021) ...

Last Modified: 08/11/2022

20210101_608_N_Bel_Aire_Decision.pdf

• The proposed FAR is 0.379 at 3,392 square feet total – this is within the maximum...Total length of all walls to be demolished divided by...

Last Modified: 04/13/2021

Attachment 2 - July 26, 2022, Staff Report on Urgency Ordinance and Regulatory Framework (2).pdf

27,898 0.06% 2019 31 28,648 0.11% 2020 36 27,392 0.13% 2021 28 27,357 0.10% TOTAL...Proximity Crime Totals by Category (2017-2021) ...

Last Modified: 05/09/2024

Attachment 2 - July 26, 2022, Staff Report on Urgency Ordinance and Regulatory Framework.pdf

27,898 0.06% 2019 31 28,648 0.11% 2020 36 27,392 0.13% 2021 28 27,357 0.10% TOTAL...Proximity Crime Totals by Category (2017-2021) ...

Last Modified: 05/25/2023

20230710-FY-23-24-Fee-Schedule-Final.pdf

Compare the total to the cost per permit....Compare the total to the cost per permit....Compare the total to the cost...

Last Modified: 07/10/2023

20230731-FY-23-24-Fee-Schedule-Final

Compare the total to the cost per permit....Compare the total to the cost per permit....Compare the total to the cost...

Last Modified: 07/31/2023

20230630-FY-23-24-Fee-Schedule-Final.pdf

Compare the total to the cost per permit....Compare the total to the cost per permit....Compare the total to the cost...

Last Modified: 07/10/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet