Search Results

Showing results for "dWA 0812 2782 5310 Tukang Buat Kitchen Set Minimalis PVC Minimalis Argomulyo Salatiga"

No results were found that matched the keywords: dWA 0812 2782 5310 Tukang Buat Kitchen Set Minimalis PVC Minimalis Argomulyo Salatiga.
Search Results

2025-08-08_Full Set (Arch+Civil+Land) - Copy

RAIN SENSORRSD C IRRIGATION PIPING 1 14" IRRIGATION PRESSURE MAINLINE SCH. 40 PVC...- BURY MIN. 18" BELOW GRADE WITH SCH. 80 FITTINGS NON-PRESSURE LATERAL SCH. 40...

Last Modified: 12/02/2025

3000 Haven Way, Burbank, CA 91504 - ARCH SET - UPDATED SET 1.9.25

(light fixtures, etc.) below 7'-0" high at the ceilings of hallways, closets, kitchens...RECOMPACT (R&R) PROPOSED RETAINING WALL EXISTING RETAINING WALL GRAVITY 4"Ø...

Last Modified: 01/28/2026

Civic Rec Account Set Up Example.pdf

household members (spouse, children, etc.) may be added at any time in your Account Settings...IMPORTANT SET UP INSTRUCTIONS FOR YOUR ACCOUNT

Last Modified: 05/04/2021

DEIR Appendix G-4A (LaTerra).pdf

VOLUME FLUID USED 10/10/2017 81' bgs 3/4" PVC 0.020" Horizontal 2" N/A N/A...VOLUME FLUID USED 10/10/2017 53' bgs 3/4" PVC 0.020"...

Last Modified: 05/04/2021

Valhalla-Phase 3- Planning Set

Valhalla-Phase 3- Preliminary Set-A0.1 Valhalla-Phase 3- Preliminary Set-A1.1...Valhalla-Phase 3- Preliminary Set-A1.2 ...

Last Modified: 08/20/2026

Request a Vehicles on Set Permit

Last Modified: 10/22/2025

Full Plan Set 10.30.23.pdf

S. VARNEY STREET W . P RO VI DE N CI A AV E. I-5 FREEWAY 4 4 VARNEY ST ASH AVE FLOWER ST FLOWER ST PROVID EN CIA AVE S VARNEY ST S LAKE ST EL M W OOD AVE CED AR AVE INTERSTATE ...

Last Modified: 11/28/2023

City Council’s Special Goal Setting Meeting

Join us for the City Council’s Special Goal Setting Meeting on Thursday...The goal- setting process helps the Council shape a vision for the future by exploring...community challenges and...

Last Modified: 01/13/2025

Burbank City Council Goal Setting Meeting

On January 23, 2025, the Burbank City Council held a Goal Setting Special...(January 24, 2025) – On January 23, 2025, the Burbank City Council held a Goal...

Last Modified: 01/24/2025

Source Area Removal SVE Design Drawings 1

SAN FERNANDO BOULEVARD AND ABOUT 37 FEET EAST OF THE CENTERLINE OF AMHERST DRIVE, SET...48711.96' EASTING 22082.26' 22041.87' ELEVATION 602.73' 602.89' DESCRIPTION ...

Last Modified: 03/18/2025

2710 Winona Ave - PROJECT PLANS -1.21.26

(TYP TC-ER) REGULATORY COMPLIANCE/CERTIFICATIONS ISO 9001:2015 CROSS-SECTION PVC...THWN-2 COPPER CONDUCTOR (QTY=3) 8 AWG 19 STRAND TINNED COPPER CONDUCTOR BLACK...

Last Modified: 02/17/2026

BPAP G001 SHEET

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC...2: Bar: Bathroom lavatory: Laundry: Service or Mop Basin: Washup each...

Last Modified: 11/15/2024

G01 SHEET

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC...2: Bar: Bathroom lavatory: Laundry: Service or Mop Basin: Washup each...

Last Modified: 05/30/2024

Emergency Supplies Guide & Checklist.pdf

close type bags) Plastic Garbage Bags (heavy duty, 30 gal. or larger and small kitchen...minimum size rating of 2A-10BC) Tent (or other temporary shelter option) ...

Last Modified: 09/26/2025

City Council’s Special Goal Setting Meeting January 23, 2025

Join us for the City Council’s Special Goal Setting Meeting on Thursday...Join us for the City Council’s Special Goal Setting Meeting on...

Last Modified: 01/13/2025

2021_Planning_ 816 N Avon_Plan Set (Submitted 4.14.2021).pdf

Becket Kula Arch Plan 816 N. Avon 816 N. AVON STREET L 1 816 N AVON ST LANDSCAPE 804(1) 2 816 N AVON ST LANDSCAPE 804(1) 3

Last Modified: 07/01/2021

2801 Empire - Plans

canopy 8'-0" 4' -9 " 15 '-3 " N C AT AL IN A ST A/V ROOM LOBBY KITCHEN...Protected by conduit, electrical metallic tubing, schedule 80...

Last Modified: 08/11/2026

4100 Riverside Dr - Project Plans.pdf

SINGLE PLY PVC MEMBRANE ROOF, TYP. SINGLE PLY PVC MEMBRANE ROOF, TYP....SCREEN 98' - 0" B C LIVING ROOM KITCHEN...

Last Modified: 10/13/2022

3700 RD_Proposed Architectural Plans.pdf

P o n d i n g D e p t h 4" PVC OR 6"PVC SCH40,O.A.E....BLACK OR DARK GREEN COLOR 1 2 " 4"PVC OR...

Last Modified: 03/04/2022

328 N San Fernando Blvd_CUP_Plan Set

LEGEND Address: 328 N. San Fernando Blvd Burbank, CA 91502 Assessor Parcel Number (APN): 2453-002-005 Zoning Information: BCC-1: Burbank Center Commercial Retail-Professional Zone ...

Last Modified: 10/14/2025

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

PVC. P.L. P.S.I. PAIR PLGL. PLAS. LAM. PLAS. PLWD. PLMB. PL. PT. P....AT 80 PSI PER CGBC 4.303 -KITCHEN FAUCETS: THE MAX....TO PROPOSED...

Last Modified: 05/30/2024

Stormdrain-Connection-Policy.pdf

• Two sets of signed and stamped hydrology calculations....• Two sets of signed and stamped hydraulic calculations....For polyvinyl chloride pipe...

Last Modified: 04/13/2021

2025 BPAP Plan Check Correction List

. • Sets must be deemed complete....metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC...All receptacles on...

Last Modified: 03/26/2026

840 E Verdugo - Plans

CONNECTED TO GUTTER AND 3"Ø PVC PIPE INSTALLED INSIDE THE WALLS. (OPTION) 3....@ SLOPE IN 18" OF COARSE PROVIDE BELOW GRADE WATER BARRIER ALONG WITH MINI. 4"...

Last Modified: 08/18/2022

2025 Residential Correction List (1)

• Sets must be deemed complete....metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC...All receptacles on 15A...

Last Modified: 09/08/2026

Reminder: East Olive Reconfiguration Restriping Project Set for March 24–27, 2025

The City of Burbank is set to begin the East Olive Reconfiguration Restriping Project

Last Modified: 03/20/2025

511 E Elmwood Ave. 9.26.26

COVER APPROVED MAIN LINE Model No: 1 1/2" OR SMALLER (SCH 40 PVC PIPE). 2" AND...LARGER (CL. 315 PVC PIPE) SIZE AS NOTED ON PLAN - 18"...

Last Modified: 10/01/2026

1719 RUDELL RD_HDP_10.7.25 PROJECT PLANS

., child-worn devices that sound when submerged or moved beyond a set distance)...All work shall conform to conditions set by the Permit. ...

Last Modified: 12/08/2025

2022 BPAP Plan Check Correction List

• Sets must be complete....• See the marked-up set of plans for additional corrections....conduit, intermediate metal conduit, electrical...

Last Modified: 11/15/2024

Re-Scheduled Due to Weather: East Olive Reconfiguration Restriping Project Set for

false Re-Scheduled Due to Weather: East Olive Reconfiguration Restriping Project Set...The City of Burbank is set to begin the East Olive...

Last Modified: 03/14/2025

Sizing Water Meter and Service Line Form

1 1 Laundry 1.5 1.5 Service or Mop Basin 1.5 3 Wash-up, each set...Laundry: Laundry1: Service or Mop Basin: Service or Mop Basin2: Washup each...

Last Modified: 11/15/2024

BWP Water ADU Plan Check Requirements (1).pdf

1 1 Laundry 1.5 1.5 Service or Mop Basin 1.5 3 Wash-up, each set...Laundry: Laundry1: Service or Mop Basin: Service or Mop Basin2: Washup each...

Last Modified: 12/22/2023

3006 Mesa Verde - 2nd submittal- Combined Plan Set.pdf

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC...E.Except for kitchen ducts under slabs-on-ground,...

Last Modified: 01/10/2023

Business License

Last Modified: 06/25/2026

Decision Letter - Combined

., child-worn devices that sound when submerged or moved beyond a set distance)...All work shall conform to conditions set by the Permit. ...

Last Modified: 12/30/2025

250220_City of Burbank - Home Again Los Angeles

USE PVC FOR BELOW GRADE....USE PVC FOR BELOW GRADE..../S DR 11 C PVC COPPER D WV ABS O R PVC...

Last Modified: 02/25/2025

3036 Scott Rd_Decision Letter_Final_Signed

officers, employees agencies, boards, commissions, or City Council to attack, set...where, each of the conditions have been addressed in the building permit plan...

Last Modified: 03/04/2025

1821 N Bel Aire Dr_Planning Approved Plans

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC...IN KITCHENS, BREAKFAST ROOMS, PANTRIES AND DINING ROOMS A...

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC...IN KITCHENS, BREAKFAST ROOMS, PANTRIES AND DINING ROOMS A...

Last Modified: 05/06/2026

Covered Material Category (CMC) List_SB 54_2025

24_P10P Plastic HDPE (#2) Flexible and Film Items blank blank 24_P11P Plastic PVC...(#3) Rigid Items blank blank 24_P12P Plastic PVC (#3)...

Last Modified: 04/14/2026

2026 JUN ISSUED

ROOFING AT FLAT PART ONLY & INSTALL NEW 1/4 INCH THICK DENS DECK & NEW 72 MIL THICK PVC...1566 SF): AT LOW SLOPE ROOF AREAS INSTALL NEW 1/4" DENS DECK & NEW 72 MILL WHITE...

Last Modified: 07/01/2026

420 S Sunset Canyon Rd - Approved Plans

IN KITCHENS SHALL HAVE A MAXIMUM SPACING OF 48" 3....ALL WORK SHALL CONFORM TO CONDITIONS SET BY THE PERMIT. 28....PVC...

Last Modified: 08/03/2026

City Council Goal Setting Special Meeting

Pursuant to Section 2-1-203 of the Burbank Municipal Code, the Burbank City Council shall hold regular meetings on at least two Tuesdays of each month, which meetings shall be determined annually...

Last Modified: 03/11/2021

City Council Goal Setting Special Meeting

Pursuant to Section 2-1-203 of the Burbank Municipal Code, the Burbank City Council shall hold regular meetings on at least two Tuesdays of each month, which meetings shall be determined annually...

Last Modified: 01/10/2022

City Council Goal Setting Special Meeting

Pursuant to Section 2-1-203 of the Burbank Municipal Code, the Burbank City Council shall hold regular meetings on at least two Tuesdays of each month, which meetings shall be determined annually...

Last Modified: 01/23/2023

3028 Scott Road - Plans.pdf

CONDITIONS SET CONDITIONS SET SET SET FORTH IN THESE PLANS....KITCHENS...

Last Modified: 08/03/2022

3028 Scott Road - Plans.pdf

CONDITIONS SET CONDITIONS SET SET SET FORTH IN THESE PLANS....KITCHENS...

Last Modified: 08/03/2022

Sample Project 2016.pdf

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC...In kitchens, breakfast rooms, pantries and dining rooms a...

Last Modified: 03/25/2021

3252 N Frederic St 1-29-22.pdf

SCOPE OF WORK - (N) 6' TALL FRONT GATE SET BACK 28'. - (N) RETAINING WALL FOR POOL...METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80...

Last Modified: 02/08/2022

3209 Castleman Ln Approved Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC...THE INSTRUCTIONS SHALL BE CONSISTENT WITH SPECIFICATIONS SET...

Last Modified: 12/14/2022

Where it Goes (English)

storage containers, laundry baskets, buckets, trash cans NO plastic bags, toys, PVC...storage containers, laundry baskets, buckets, trash cans NO plastic bags, toys,...

Last Modified: 04/14/2026

Water Permit Approval Requirements for new ADU Ron T. Comments 7_15_20.pdf

(JADU) added to a residential property may require water-usage devices such as kitchen...Hose Bibb, each additional 4 1 1 Lawn Sprinkler each head 2 1 1 Sinks ...

Last Modified: 03/25/2021

Water Permit Approval Requirements for new ADU.pdf

(JADU) added to a residential property may require water-usage devices such as kitchen...Hose Bibb, each additional 4 1 1 Lawn Sprinkler each head 2 1 1 Sinks ...

Last Modified: 09/15/2021

20210101_Planning_Accessory_Structure_Covenant.pdf

One set of project plans (11” x 17” or comparable size) including site plan, floor...accessory structure cannot be used for cooking or sleeping purposes and that...

Last Modified: 03/29/2021

Appendix H - Hydrology Study.pdf

673.59 SET SCRX 963 672.99 SET SCRX 957 673.56 SET SCRX 964 672.58 SET SCRX...The casing...

Last Modified: 01/07/2025

BCC Handbook - April 2026 _FINAL - website version

238-5026 Marisa Garcia, Parks and Recreation Director ............ (818) 238-5310...Board member duties and responsibilities include setting...

Last Modified: 07/15/2026

BCC Handbook - July 2026

238-5026 Marisa Garcia, Parks and Recreation Director ............ (818) 238-5310...Board member duties and responsibilities include setting...

Last Modified: 08/10/2026

City of Burbank GANN Appropriations Limit FY 2024-2025

$81,166,358 CITY OF BURBANK GANN APPROPRIATIONS LIMIT FY 2024-25 Appropriations Setting

Last Modified: 05/16/2024

EDGAR MARKOSYAN - 436 TUFTS AVE PLANS

PVC PIPING SHALL NOT BE EXPOSED TO DIRECT SUNLIGHT UNLESS PROTECTED BY WATER BASED...KITCHEN AND BATHROOM REMODEL Tract: 13266 Lot: 18 Block:...

Last Modified: 06/30/2025

- SETTING FINANCIAL GOALS

 

Last Modified: 04/28/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet