Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Biaya Pemasangan Geofoam ASTM Polewali Mandar Sulawesi Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Biaya Pemasangan Geofoam ASTM Polewali Mandar Sulawesi Barat.
Search Results

2022 BPAP Plan Check Correction List

window fall prevention device or window opening control devices that comply with ASTM...of plywood, glued- laminated timber, design strength of concrete, rebar grade,...

Last Modified: 11/15/2024

DEIR Appendix F (LaTerra).pdf

Materials (ACI 302.2R-06) and should be installed in general conformance with ASTM...material should be compacted to 95 percent relative compactions determined by...

Last Modified: 05/04/2021

2931 Olney Pl Approved Plans.pdf

FOR EXISTING POOL ON SITE, PROVIDE ANTI–ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 04/05/2022

2931 Olney Place Plans.pdf

FOR EXISTING POOL ON SITE, PROVIDE ANTI–ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 01/31/2022

Senior Housing in LA County.pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S.

Last Modified: 08/04/2022

Senior Housing in LA County (1).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S.

Last Modified: 08/04/2022

Senior Housing in LA County (2).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S.

Last Modified: 08/04/2022

Burbank Legislative Platform 2022 3.1.22 FOR WEB.pdf

Suite 204 Sacramento, CA 95814 Glendale, CA 91205 Phone 916-651-4025 818-409-0400

Last Modified: 03/01/2022

Burbank Legislative Platform 2022 2.11.22 FINAL for web.pdf

Suite 204 Sacramento, CA 95814 Glendale, CA 91205 Phone 916-651-4025 818-409-0400

Last Modified: 02/11/2022

FINAL-Burbank.CA.2801 Thornton Ave. Phase I

general provisions of the E 1527-21 American Society for Testing and Materials (ASTM......................................................................... 1 1.1 ...

Last Modified: 04/03/2025

20230309-Burbank-Legislative-Platform.pdf

Suite 210 Sacramento, CA 95814 Glendale, CA 91207 Phone 916-651-4025 818-409-0400

Last Modified: 04/20/2023

2021_Plans_322 AVON - March2021 submittal.pdf

BE AN ICC-ES OR UL LISTED CLASS "A" FIRE-RESISTIVE ROOF ASSEMBLY COMPLYING WITH ASTM...SLIP-RESISTANT AND CONFORM AutoCAD SHX Text TO MINIMUM STANDARDS OF APPLICABLE...

Last Modified: 06/07/2021

20240415-burbank-legislative-platform-2024-001.pdf

Suite 210 Sacramento, CA 95814 Glendale, CA 91207 Phone 916-651-4025 818-409-0400

Last Modified: 04/16/2024

2025 MAR ISSUED

15030 VENTURA BLVD #11-578 Issued Date:Permit Number:Permit Type: BS2502700 1305...Mary Bekerian 3108717070 91505CABurbank Owner 1305 N Pass...

Last Modified: 04/04/2025

250220_City of Burbank - Home Again Los Angeles

ADHESIVE ANCHORS: ASTM A36 THREADED RODS WITH ASTM A 563 GRADE A NUTS AND ANSI B18.22.1...ANCHORS DESIGNATED AS ASTM A193...

Last Modified: 02/25/2025

1115 S LAKE ST UPDATED DRAWINGS

FOR EXISTING POOL ON SITE, PROVIDE ANTI–ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 08/20/2025

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

PROVIDE ONE LAYER OF 72 POUNDS MINERAL-SURFACED NON-PERFORATED CAP SHEET MEETING ASTM...LISTED VENT COMPLYING WITH ASTM E2886 OR b....BOX-IN ROOF...

Last Modified: 02/16/2024

Phase I

Assessment (ESA) in general accordance with the scope of work and limitations of ASTM...The ASTM Standard Practice E1527-13 defines a Recognized...

Last Modified: 09/25/2025

1036 Sherlock Dr_HDP Plans_v2

Moment Frames for Seismic Applications; Seismic Design Manual, 3rd Edition, 2018 ASTM...has been designed based on standard HSE and QA/QC procedures (OSHA, 29 CFR 1926,...

Last Modified: 06/12/2024

20260422-HSRCommentLetter-001.pdf

for any other projects, with heavy wall and rated for 90°C, in accordance with ASTM...solvent-cemented joints with polyvinyl chloride (PVC) pipe and fittings as described...

Last Modified: 04/22/2026

Appendix B - Phase I ESA.pdf

These terms as defined by ASTM are discussed below....conditions that pose a material threat of a future release to the environment”...

Last Modified: 01/07/2025

3028 Scott Road - Plans.pdf

ASTM E283, AND SHALL BE SEALED WITH A ACCORDANCE WITH ASTM E283, AND SHALL BE SEALED...WITH A WITH ASTM E283, AND SHALL...

Last Modified: 08/03/2022

3028 Scott Road - Plans.pdf

ASTM E283, AND SHALL BE SEALED WITH A ACCORDANCE WITH ASTM E283, AND SHALL BE SEALED...WITH A WITH ASTM E283, AND SHALL...

Last Modified: 08/03/2022

HE - Mitigation Monitoring Reporting Program.pdf

applicant will retain a qualified environmental professional (EP), as defined by ASTM

Last Modified: 11/28/2022

2025 FEB ISSUED

Contractor 6650 AMIGO AVENUE Issued Date:Permit Number:Permit Type: BS2501768 1305...2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2501892 ...

Last Modified: 03/10/2025

1018 N Sunset Canyon Dr_Project Plans

AND (SRI) OF 29 OR HIGHER WHICH ARE QUALIFIED USBBS LEED UL CERTIFIED TO MEET ASTM...D3462 AND ASTM D3018.

Last Modified: 03/04/2025

EDGAR MARKOSYAN - 436 TUFTS AVE PLANS

LAYER OF MINIMUM 72LB MINERAL SURFACED NONPERFORATED CAP SHEET COMPLYING WITH ASTM...LAYER OF MINIMUM 72LB MINERAL SURFACED NON-PERFORATED CAP SHEET COMPLYING WITH...

Last Modified: 06/30/2025

2613 W Magnolia Blvd - Project Plans - 1-15-24

COMPLYING WITH ASTM D 226 FOR TYPE 1 FELT OR OTHER APPROVED MATERIALS.

Last Modified: 01/31/2024

2607 W Magnolia Blvd - Approved Project Plans - STAMPED

COMPLYING WITH ASTM D 226 FOR TYPE 1 FELT OR OTHER APPROVED MATERIALS.

Last Modified: 02/15/2024

2919 Olney Pl - Project Plans.pdf

Data • Fire Rating: Class A • Uplift Test: UL580 Class 90 • Air Infiltration: ASTM...E1680 • Water Infiltration: ASTM E1646 • Class 4 Impact...

Last Modified: 08/04/2022

526 S. SUNSET CYN DR - Project Plans - 09-29-23

PROVIDE ONE LAYER OF 72 POUNDS MINERAL-SURFACED NON-PERFORATED CAP SHEET MEETING ASTM...LISTED VENT COMPLYING WITH ASTM E2886 OR b....BOX-IN ROOF...

Last Modified: 01/23/2024

3209 Castleman Ln Approved Plans.pdf

FOR EXISTING POOL ON SITE, PROVIDE ANTI– ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 12/14/2022

1821 N Bel Aire Dr_Plans

FOR EXISTING POOL ON SITE, PROVIDE ANTI– ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 05/06/2026

1821 N Bel Aire Dr_Planning Approved Plans

FOR EXISTING POOL ON SITE, PROVIDE ANTI– ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 06/02/2026

ApxG1_Phase I ESA - Part 1.pdf

was performed in conformance with the scope and limitations as detailed in the ASTM...Site Assessment (ESA) in accordance with the scope of work and limitations of...

Last Modified: 07/09/2021

PLANS RIVR_DensityBonusApp_231121_R2.pdf

ASTM C150, Type I or II....Wire for reinforcement shall conform to ASTM A185....Steel for lugs and plates shall conform to...

Last Modified: 12/21/2023

Source Area Removal SVE Design Drawings 1

AMERICAN NATIONAL STANDARDS INSTITUTE ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS ASTM...REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM...

Last Modified: 03/18/2025

Consistency Matrix - SB35 NOI - 910 S Mariposa

Requirement Map, which AIRPORT requires FAA Notice for all structures with height at 10-1-1305

Last Modified: 03/19/2024

3006 Mesa Verde - 2nd submittal- Combined Plan Set.pdf

For existing pool on site, provide anti–entrapment cover meeting the current ASTM

Last Modified: 01/10/2023

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

CEMENT, FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS IN COMPLIANCE WITH ASTM C1178,...CEMENT, FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS IN COMPLIANCE WITH ...

Last Modified: 05/30/2024

2nd Submittal SB35 - 910 S Mariposa - Consistency matrix.pdf

requires FAA Notice for all structures with height at limits allowed by code. 10-1-1305

Last Modified: 07/06/2023

Planning Comments - Final Objective Standard Review

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The

Last Modified: 05/06/2024

Updated_Objective_Standards_Consistency_Matrix.pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 05/14/2024

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 07/25/2023

840 E Verdugo - Plans

For existing pool on site, provide anti–entrapment cover meeting the current ASTM...For existing pool on site, provide anti–entrapment cover meeting the current...

Last Modified: 08/18/2022

Attachment C - Objective Standards Consistency Matrix.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 06/26/2023

Attachment C - Objective Standards Consistency Matrix.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 05/08/2023

Combined Attachments A-N.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 05/24/2023

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

 West: 1300 Morningside & 1305 W.... West: 1300 Morningside & 1305 W.

Last Modified: 12/26/2023

1048 Sherlock Dr - (4-16-25)

FOR EXISTING POOL ON SITE, PROVIDE ANTI– ENTRAPMENT COVER MEETING THE CURRENT ASTM...A MINIMUM 36-INCH-WIDE (914MM) UNDERLAYMENT CONSISTING OF ONE LAYER OF NO. 72...

Last Modified: 06/23/2025

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

FOR EXISTING POOL ON SITE, PROVIDE ANTI– ENTRAPMENT COVER MEETING THE CURRENT ASTM

Last Modified: 04/12/2024

1719 RUDELL RD_HDP_10.7.25 PROJECT PLANS

The alarm must comply with and be independently certified to ASTM Standard F2208

Last Modified: 12/08/2025

2244 N. Buena Vista CEST and Appendices_06.16.2025_KH signed.pdf

Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM...This assessment was prepared in general accordance with ASTM...

Last Modified: 06/17/2025

ATTACHMENT 1- JHM FR-print this.pdf

applicant will retain a qualified environmental professional (EP), as defined by ASTM...applicant will retain a qualified environmental professional (EP), as defined by...

Last Modified: 09/16/2022

Decision Letter - Combined

The alarm must comply with and be independently certified to ASTM Standard F2208

Last Modified: 12/30/2025

2025 APR ISSUED

2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2503953 1305...COOL ROOF COMP SHINGLES EDWIN & CYNTHIA RAMOS 8186359998 91506CABURBANK Owner...

Last Modified: 05/01/2025

Attachment E - City Department Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 01/17/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet