Search Results

Showing results for "dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 [[ADEFA]] Vendor Jual Paving Ramah Lingkungan Wilayah Takalar Sulawesi Selatan.
Search Results

20210519_3329_Durham_Plans.pdf

ALL LANDSCAPED AND PAVED AREAS SHALL BE MAINTAINED IN A NEAT AND ORDERLY CONDITION

Last Modified: 05/19/2021

National Night Out

Over 30 vendors will be at the event with fun games, prizes, and giveaways for

Last Modified: 07/05/2023

National Night Out

Over 30 vendors will be at the event with fun games, prizes, and giveaways for

Last Modified: 07/09/2024

Civitan Jamboree Day

opportunity to learn more about sports recreation activities by visiting the vendor

Last Modified: 06/14/2024

20230911-FY-2023-24-Adopted-Budget-Complete.pdf

Ongoing Total number of vendors accepting electronic payments....construction management of the City of Burbank Standard Plan (BS) 1500 - street...

Last Modified: 09/11/2023

8. Heritage Commission_Redacted

Promoting Synergies Customer Service & Retention Event Promotion & Management Vendor

Last Modified: 06/13/2024

11/16/21 - PH - Attachment 21

summarizes the benefits of local workforces, including a reduction in the length of vendor

Last Modified: 11/04/2021

Resolution_No._23-29467 [Z].pdf

AD&D) insurance policy of $52,000 will be provided through the City's insurance vendor

Last Modified: 09/28/2023

Resolution_No._25-29623.pdf

AD&D) insurance policy of $52,000 will be provided through the City's insurance vendor

Last Modified: 08/13/2025

CDBG RFP FY 2026-27 FINAL Website.pdf

Note: If you are a domestic vendor and need assistance with acquiring a federal contract

Last Modified: 12/30/2025

Enterprise System Catalog

Last Modified: 03/13/2026

2026.04.01 Z-Group 2025 Compensation Plan - Reso No 26-29,684.pdf

AD&D) insurance policy of $52,000 will be provided through the City's insurance vendor

Last Modified: 04/01/2026

2026.07.02 Def COB's Compendium of Exhibits ISO of Opposition to Petitioner's Motion for Prelim. Injunction

City requires list of identified vendors..... 4 HTong Response code 6: Sales are available online and at certain select vendors...Metro will...

Last Modified: 07/17/2026

7-13-21 BCC - 3. Police Commission_Redacted.pdf

. • Mail, fax, or arrange for delivery of correspondence to clients/vendors....Negotiated with vendors to achieve lower costs of services...., and...

Last Modified: 06/17/2021

2nd Submittal SB35 - 910 S Mariposa - Project Plans.pdf

Enhanced stamped paving at main project entry....19. 12 4 10 1 6 62 19 3 20. 7 2020206 21. 21 21 21 21 21 5 Stamped Paving

Last Modified: 07/06/2023

20210101_1258_E_Elmwood_ProjectPlans.pdf

LEVELED AREAS, INCLUDING ASPHALT PAVING, SHALL HAVE MINIMUM GRADES FOR DRAINAGE...DRIVEWAY GRADES EXCEEDING 10% SHALL BE PAVED. 21.

Last Modified: 04/13/2021

2022 BPAP Plan Check Correction List

flange at stucco siding placed a minimum of 4 inches above earth or 2 inches above paved...implemented to manage storm water drainage during construction. 4.106.3...

Last Modified: 11/15/2024

3001 Empire Ave - SB 35 NOI - 2nd Incomplete Letter with attachment (6.6.2022).pdf

Bicycle parking facilities shall be located on a hard paved surface and shall be...construct, alter, repair, raise, build or move any permanent building, structure,...

Last Modified: 05/24/2023

202101_Planning_ 3201 Scott Rd_Decision Letter_final.pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 06/22/2021

3036 SCOTT RD - Approved Plans

TOP OF PAVING T.S. TOP OF SLAB T.W. TOP OF WALL TYP. TYPICAL U.N.O.

Last Modified: 03/03/2025

Attachment 8 - Budget Public Hearing 6.4.24.pdf

Blvd Reconfig (Phase 1) CD 1,187,000 358,000 1,545,000 24184 FY 21-22 Annual Res Paving

Last Modified: 05/24/2024

Appeal - WTF AUP - Exhibit A - Resolution (FINAL)

applicant will have to restore the street fronting property per City of Burbank paving

Last Modified: 07/22/2024

Project Plans - 3036 SCOTT RD.

TOP OF PAVING T.S. TOP OF SLAB T.W. TOP OF WALL TYP. TYPICAL U.N.O.

Last Modified: 02/07/2025

Rancho Providencia NPP

Last Modified: 04/23/2026

Appendix 11.1B_Cultural Report.pdf

The entire project site is paved with ornamental landscaping along the perimeter...The entirety of the project site is paved except for...

Last Modified: 11/29/2021

4100 Riverside Dr - Project Plans.pdf

PAVING AT PLAZA (N) CONC. PAVING AT ALLEY. SLOPE TO DRAIN....PERMEABLE PAVING AT DOG RUN 8'-0" TALL SITE WALL AT ...

Last Modified: 10/13/2022

Adult 55+ California Avocado Festival Day Trip

the heart of downtown Carpinteria, the festival features live music, artisan vendors

Last Modified: 09/23/2025

Consistency Matrix - SB35 NOI - 910 S Mariposa

Requirement Map, which AIRPORT requires FAA Notice for all structures with height at 10-1-1305

Last Modified: 03/19/2024

The Village at Fairview Project_HUD EA_PublicDraft_010725 - SIGNED.pdf

existing on-site single-family and multi- family residential buildings and associated paving...The Project Site is currently covered by paved...

Last Modified: 01/07/2025

20210101_608_N_Bel_Aire_Decision.pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 04/13/2021

Planning_2021 _ 929 E San Jose Decision Letter_final.pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 12/28/2021

Attachment 1 – City Council Resolution

applicant will have to restore the street fronting property per City of Burbank paving

Last Modified: 10/18/2024

Report a Problem

Experiencing a problem? Use one of our City Services to help solve it!

Last Modified: 04/29/2026

2022 Comm-Mixed Correction List

screed shall be place not less than 4 inches above the earth or 2 inches above paved...debris, by material type, to be diverted to recycling, reuse, or salvage; f) The...

Last Modified: 02/09/2026

Adult 55+ California Strawberry Festival Day Trip

With over 40 food vendors , live music, and a plethora of arts and crafts booths

Last Modified: 03/20/2026

2024-01-16_Thornton Planning Package

BACKER ROD DECORATIVE NICKLE-BRONZE NOZZLE: ZURN Z199 SPLASHBLOCK AT ALL A/C PAVING...CONCRETE FOOTING, SEE STRUCTURAL DRAWINGS TOP OF CONCRETE OR ASPHALT CONCRETE ...

Last Modified: 04/18/2024

2024-01-16_Thornton Planning Package23

BACKER ROD DECORATIVE NICKLE-BRONZE NOZZLE: ZURN Z199 SPLASHBLOCK AT ALL A/C PAVING...CONCRETE FOOTING, SEE STRUCTURAL DRAWINGS TOP OF CONCRETE OR ASPHALT CONCRETE ...

Last Modified: 01/13/2025

2nd Submittal SB35 - 910 S Mariposa - Consistency matrix.pdf

requires FAA Notice for all structures with height at limits allowed by code. 10-1-1305

Last Modified: 07/06/2023

Planning Comments - Final Objective Standard Review

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The

Last Modified: 05/06/2024

Updated_Objective_Standards_Consistency_Matrix.pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 05/14/2024

1706 Magnolia Blvd_AUP_ Plans.pdf

., BURBANK, CA 91506 (paved) (E)PUBLIC CONC.

Last Modified: 07/29/2022

910 S Mariposa _Proposed_Drawings.pdf

9 9 9 5 5 10 A B B B C C D BUTTERFLY HABITAT PLANTINGS PERMEABLE PAVING

Last Modified: 05/11/2022

202101_504 Hampton Rd_Decision Letter_Final_.pdf

applicant will have to restore the street fronting the property per City of Burbank paving

Last Modified: 06/02/2021

Avion

2025 APR ISSUED

$5,000.00Valuation: CRACK FILL, SEAL COAT, AND RE-STRIPE 25 SINGLELINE STALL SUPERIOR PAVING...2025 Repair & Maintenance Issued Date:Permit Number:Permit Type:...

Last Modified: 05/01/2025

20211026-FY-2021-22-ADOPTED-BUDGET

Transportation Bridge Repairs 50,000 50,000 Fiscal Year 21-22 Annual Residential Paving...123 - Road Maintenance and Rehabilitation Fiscal Year 21-22 Annual...

Last Modified: 10/26/2021

Winter Wine Walk

strong>FREE Street Fair from 12pm-8pm on San Fernando Blvd. with holiday vendors

Last Modified: 10/08/2024

Earth Day 2025 Event

Greener Burbank Community Share Fair Guest Speakers Vendor

Last Modified: 04/03/2025

Winter Wine Walk

strong>FREE Street Fair from 12pm-8pm on San Fernando Blvd. with holiday vendors

Last Modified: 11/19/2025

FY 2021-22 Proposed Budget.pdf

The paving construction budget has almost tripled from prior years and the size of...the paving contracts have been commensurate with the...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

The paving construction budget has almost tripled from prior years and the size of...the paving contracts have been commensurate with the...

Last Modified: 04/22/2021

The Burbank2035 General Plan

fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and Vendors...Equipment and Business Practices Give preference to qualified contractors and...

Last Modified: 03/24/2021

The Burbank2035 General Plan.pdf

fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and Vendors...Equipment and Business Practices Give preference to qualified contractors and...

Last Modified: 11/17/2021

Burbank2035_Updated (002)

coatings, residential fuel combustion, construction and demolition, dust from paved...fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and...

Last Modified: 03/24/2026

20260421-GeneralPlan-001.pdf

coatings, residential fuel combustion, construction and demolition, dust from paved...fees Time Frame: Ongoing Program AQCC-9: Preference for City Contractors and...

Last Modified: 04/21/2026

HistoricPreservationPlan.pdf

1911 Burbank incorporated Arrival of Pacific Electric Railroad San Fernando Road paved...to National Pictures (purchased by Warner Brothers in 1929) 1927 Five miles of...

Last Modified: 02/02/2021

City of Burbank Economic Recovery Plan.pdf

Work with city contractors and vendors – i.e., StreetPlus c.

Last Modified: 03/29/2021

2020-burbank-economic-recovery-plan-001.pdf

Work with city contractors and vendors – i.e., StreetPlus c.

Last Modified: 03/29/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet