Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Jasa Pemasangan Geotextile Tube Terdekat Berau Kalimantan Timur"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Jasa Pemasangan Geotextile Tube Terdekat Berau Kalimantan Timur.
Search Results

Plans formal submittal #2_Part4

HYDRAULIC MULCH EC4 - HYDROSEEDING EC5 - SOIL BINDERS EC6 - STRAW MULCH EC7 - GEOTEXTILES

Last Modified: 11/14/2024

Plans formal submittal #2_Part4 (1).pdf

HYDRAULIC MULCH EC4 - HYDROSEEDING EC5 - SOIL BINDERS EC6 - STRAW MULCH EC7 - GEOTEXTILES

Last Modified: 11/14/2024

2022 Comm-Mixed Correction List

Steel, ferrous or copper pipes, tubes or conduits, the annular space between the...Glazing in walls, enclosures or fences containing or facing hot...

Last Modified: 02/09/2026

920 E Grinnell Dr - Project Plans - 12-16-22.pdf

PROVIDE DOUBLE SINKS WITH GARBAGE DISPOSAL, AT REFRIGERATOR SPACE - PROVIDE COPPER TUBE...PROVIDE DOUBLE SINKS WITH GARBAGE DISPOSAL, AT REFRIGERATOR SPACE - PROVIDE ...

Last Modified: 02/09/2023

Recirculated DEIR (LaTerra).pdf

The tremie tube shall be kept full of concrete....concrete slab underlain by a minimum 30-mil vapor barrier, followed by a cushion...

Last Modified: 05/04/2021

Recirculated DEIR Appendices (LaTerra).pdf

The tremie tube shall be kept full of concrete....concrete slab underlain by a minimum 30-mil vapor barrier, followed by a cushion...

Last Modified: 05/04/2021

2021 N Parish Place - Final Plans

PROVIDE DOUBLE SINKS WITH GARBAGE DISPOSAL, AT REFRIGERATOR SPACE - PROVIDE COPPER TUBE

Last Modified: 08/22/2025

2025 BPAP Plan Check Correction List

Protected by rigid metal conduit, intermediate metal conduit, electrical metallic tubing

Last Modified: 03/26/2026

2025 APR ISSUED

2025 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2503953 1305...COOL ROOF COMP SHINGLES EDWIN & CYNTHIA RAMOS 8186359998 91506CABURBANK Owner...

Last Modified: 05/01/2025

420 S. Sunset Cny - Project Plans - 4-19-23.pdf

OR GREATER TO HAVE 2 LAYERS OF GEOTEXTILE FABRIC INSTALLED 3" BELOW GROWTH.

Last Modified: 10/23/2023

2019 W Magnolia - Decision Letter - 260408

Heights Surrounding Bob Hope Airport 10-1-1305: FEDERAL AVIATION ADMINISTRATION

Last Modified: 04/08/2026

Water & Fire June 2023

Last Modified: 07/28/2025

Attachment E - City Department Comments.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 06/26/2023

Attachment E - City Department Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 01/17/2023

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

PROTECTED BY RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING

Last Modified: 04/12/2024

Pickwick Amended Tentative Map and Plans.pdf

"Saltillo" Tile Veneer Decorative Shaped Stucco Hood/Awning Decorative Metal Tube

Last Modified: 10/14/2022

2025 Residential Correction List (1)

Protected by rigid metal conduit, intermediate metal conduit, electrical metallic tubing

Last Modified: 09/08/2026

PP 08-2022.pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

PP 08-2022 (1).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

PP 08-2022 (2).pdf

Los Angeles - (323) 298-0400 Broadway Villas Apartments 9501 S....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 08/04/2022

LA County Affordable Housing Resources.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 03/11/2025

09-2025 PROJECT PLACE.pdf

Los Angeles (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 10/06/2025

09-2024 PROJECT PLACE.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 09/13/2024

07-2024 PROJECT PLACE.pdf

Los Angeles - (323} 298-0400 Broadway Villas Apartments 9501 5....Winnetka Village - Senior Apartments 20750 Sherman Way Winnetka 91306 818-710-1305

Last Modified: 07/24/2024

Project Applicant's Submitted Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Consistency Matrix - SB 35 NOI

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Attachment 1, Exhibit B - Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

EDGAR MARKOSYAN - 436 TUFTS AVE PLANS

Protected by rigid metal conduit, intermediate metal conduit, electrical metallic tubing

Last Modified: 06/30/2025

DEIR Appendix G-1 (LaTerra).pdf

The rods are then re- trieved leaving the tubing in the hole....The tubing was then labeled with the probe designation and total depth....Shelby...

Last Modified: 05/04/2021

Project Plans Bel Aire

STEEL PIPE RAIL……………………………..............................ASTM A53, GRADE B STEEL TUBING

Last Modified: 10/27/2026

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

2026 AUG ISSUED

components is UNIVERSAL NAVA ELECTRIC 8185909667 91205CAGLENDALE Contractor 1305

Last Modified: 09/01/2026

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-21-26

62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 07/01/2026

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 8-11-26.pdf

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

COB Grade Step Salary Listing, 8-11-26.pdf

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

COB Grade Step Salary Listing 8-11-26

41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...7045.76 3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 08/13/2026

777 N. Front St. - Final EIR.pdf

concrete slab underlain by a minimum 30-mil vapor barrier, followed by a cushion geotextile...Cushion geotextiles and/or 2-inches of sand will be...

Last Modified: 03/31/2021

20210301_AppendixINoiseTechReport_Avion.pdf

35 35 35 1262 13 13 66.7 67.7 N San Fernando Blvd & Cohasset St Hard 40 35 35 35 1305

Last Modified: 03/31/2021

3411 Viewcrest Dr - Final Plans.pdf

PROTECTED BY RIGID METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING

Last Modified: 06/15/2023

2023-04-06- 801 S 6TH ST -SUBMITTAL #1.pdf

HYDRAULIC MULCH EC4 - HYDROSEEDING EC5 - SOIL BINDERS EC6 - STRAW MULCH EC7 - GEOTEXTILES

Last Modified: 05/03/2023

2023-04-06- 801 S 6TH ST -SUBMITTAL #1.pdf

HYDRAULIC MULCH EC4 - HYDROSEEDING EC5 - SOIL BINDERS EC6 - STRAW MULCH EC7 - GEOTEXTILES

Last Modified: 05/03/2023

The Greenhouse Arts & Media - Proposal for Sublease of Burbank Center Stage (2).pdf

complete janitorial services and the furnishing of janitorial supplies, lamps and tubes

Last Modified: 09/20/2023

Attachment 6 - City Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/21/2024

Attachment 6 - City Comments

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

2026 OCT ISSUED

1713 Standard Ave UNIVERSAL NAVA ELECTRIC 8185909667 91205CAGLENDALE Contractor 1305

Last Modified: 11/02/2026

Soils Report.pdf (1)

aggregate base over Tensar InterAx NX850 geogrid or equivalent extruded (nonwoven) geotextile

Last Modified: 06/23/2023

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet