Search Results

Showing results for "dWA 0821 1305 0400 Jasa Servis Handheld XRF Analyzer Resmi Tangerang Selatan Banten"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Servis Handheld XRF Analyzer Resmi Tangerang Selatan Banten.
Search Results

2025_TitleVI_Program_Update

In the FTA complaint investigation process, we analyze the complainant's allegations

Last Modified: 07/28/2025

Attachment 1, Exhibit B - Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305 through

Last Modified: 11/19/2024

2026 JUN ISSUED

Service $800.00Valuation: REMOVE 200 AMP SERVICE PANEL AND INSTALL NEW 200 AMP SERVIE

Last Modified: 07/01/2026

FY 2021-22 Proposed Budget.pdf

Existing analyzers are not as accurate or reliable due to age and continuous use...This project will investigate and analyze the current...

Last Modified: 04/22/2021

FY 2021-22 Proposed Budget.pdf

Existing analyzers are not as accurate or reliable due to age and continuous use...This project will investigate and analyze the current...

Last Modified: 04/22/2021

FY 2024-25 Adopted Budget_Final

Staff analyzed the availability of one-time funding within each of the City’s funds...Continue phasing in handheld electric equipment where...

Last Modified: 09/05/2024

20210101_2020-2025 Consolidated Plan.pdf

• MA 15- Housing Costs: Analyze the cost of housing putting into consideration...This section will analyze whether housing is affordable for...

Last Modified: 05/20/2021

202107_2311_N_Hollywood_Way_ApxC1_HistoricResourcesAssessment_reduced.pdf

In addition, this Report analyzes potential impacts of the proposed Project to identified...• Reviewed and analyzed ordinances, statutes,...

Last Modified: 07/09/2021

Project No.24-4476 - 3000 Haven Way - HDP - Decision Letter 3.10.26

view study is required as a part of the Hillside Development Permit process to analyze...view study, a site visit was conducted on the property on December 18, 2025, to...

Last Modified: 03/11/2026

2/8/22 - PH - Attachment 4

standards will not land uses that are no more intense than the buildout scenario analyzed...standards will not land uses that are no more intense than the buildout...

Last Modified: 01/27/2022

Attachment 4 - Dec 13 2021 Plannin gboard Hearing Report and Exhibits.pdf

standards will not land uses that are no more intense than the buildout scenario analyzed...standards will not land uses that are no more intense than the buildout...

Last Modified: 01/27/2022

20210401_3700RD_Appendix_B.pdf

The winners were chosen from over 300 buildings analyzed by the judges....The winners were chosen from over 300 buildings analyzed by the judges.

Last Modified: 04/12/2021

Base Range - As of 12.27.20.pdf

.00 .00 .00 .00 .00 .00 .00 Lifeguard 0821...8 9 10 11 12 13 14 Tree Trimmer ...

Last Modified: 01/19/2021

UpperLARiver_Draft_Appendix6.pdf

the International BMP Database  (www.bmpdatabase.org)  6.D.9 Description of Analyzed...µg/l)  BMP Category  Number of BMP  Sampling  Locations  Number of  Samples ...

Last Modified: 03/25/2021

20201208-Burbank-Channel-Bikeway-RFP-001.pdf

The Consultant shall analyze existing and proposed drainage systems (catch basins

Last Modified: 12/08/2020

20210113-la-river-bridge-rfp-001.pdf

The Consultant shall analyze existing and proposed drainage systems (catch basins

Last Modified: 01/13/2021

Ordinance_No._25-4024_.pdf

information and documentation deemed necessary by the Director for the purpose of analyzing

Last Modified: 05/21/2025

Ordinance_No._25-4024_ (1).pdf

information and documentation deemed necessary by the Director for the purpose of analyzing

Last Modified: 05/21/2025

20220901-FY-2022-23-ADOPTED-BUDGET-COMPLETE

Fleet Optimization and Diversification Study - Hired a consultant to analyze the...Citywide Facilities Condition Assessment - Analyze 1.3 million...

Last Modified: 09/01/2022

FY 2025-26 Adopted Budget_Complete

However, CalPERS also embarked upon a new experience study that will analyze current...maintenance of public properties at multiple non-park sites. - Continue phasing-in...

Last Modified: 09/11/2025

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600046 1305

Last Modified: 02/06/2026

UpperLARiver_DraftEWMP_Jun.pdf

This EWMP addresses and provides compliance coverage for all pollutants analyzed...In turn, the ULAR RAA analyzes the volume of runoff during...

Last Modified: 03/25/2021

20210101_Five Year (2020-2025) Analysis of Impediments to Fair Housing Choice.pdf

This report also analyzes the conditions in the private market and the public sector...76 ANALYSIS OF IMPEDIMENTS TO FAIR HOUSING CHOICE practices in Burbank...

Last Modified: 05/20/2021

Appendix 11.1B_Cultural Report.pdf

The winners were chosen from over 300 buildings analyzed by the judges....The winners were chosen from over 300 buildings analyzed by the judges.

Last Modified: 11/29/2021

CE Report - Project No 19-0005588_529-537 E Palm Ave.pdf

CONCLUSION As analyzed, the project would be consistent with applicable Burbank2035...According to the SCAQMD’s CEQA Air Quality Handbook, projects must be...

Last Modified: 12/07/2023

COB Grade Step Salary Listing, 8-17-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 4-27-25

6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 70 of 74 Tree Trimmer...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

40.06 60.09 Senior Lifeguard B.0900 BCEA 0821...6807.97 3142.14 39.28 58.92 Tree Trimmer...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-22-25

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 6-22-25.docx - Updated

41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 9-30-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 9-14-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 11-25-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 12-21-25

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 3-10-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 2-1-26

3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...STEPS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 83 of 88 Tree Trimmer...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 3-15-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 6-2-26

40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA 0821...6907.59 3188.12 39.85 59.78 7080.30 3267.83 40.85 61.28 Tree Trimmer...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 6-21-26

62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA 0821...3251.89 40.65 60.98 7221.91 3333.19 41.66 62.49 Tree Trimmer...

Last Modified: 07/01/2026

Attachment 1 - 2024 GGRP Status Report and Addendum.pdf

https://burbankwaterandpower.com/electric-vehicles/public-charging#/analyze?

Last Modified: 11/12/2024

Attachment 1 - Proposed Ordinance CCO edits

information and documentation deemed necessary by the Director for the purpose of analyzing

Last Modified: 02/13/2025

11/16/21 - PH - Attachment 9

Capacity Analysis Water Supply The following section identifies key topic areas analyzed

Last Modified: 11/04/2021

Burbank_FTO_Manual_-_Website_Version

Superior: Requires no assistance and quickly analyzes situations and makes proper

Last Modified: 10/20/2025

Appendix F_HazMat Studies_Part 1.pdf

Soil gas samples will also be collected from 5 feet bgs and analyzed for VOCs in...advanced to 20 ft bgs with soil samples collected at 5, 10, and 15 ft bgs and...

Last Modified: 12/13/2024

Pop-up Community Event with Metro

style="font-family: Calibri , sans-serif;">What this means is that Metro is analyzing

Last Modified: 10/29/2024

20201210.AdoptedCIP20_21.pdf

A DMS system provides the necessary advanced applications that continuously analyze...The Revenue Protection module analyzes the existing meter...

Last Modified: 12/10/2020

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

project will enhance the efficiency of citation issuance by the implementation of handheld...N/A PROJECT DESCRIPTION AND JUSTIFICATION This project will collect data and...

Last Modified: 09/11/2023

20230504-FY-2023-24-Proposed-Budget-Final.pdf

print photos and graphics for Detectives conducting investigations, to review and analyze...It manages transportation projects such as street improvements and bikeways,...

Last Modified: 05/04/2023

DEIR Appendix I (LaTerra).pdf

this study is to expand upon previous findings made by SSA Acoustics and further analyze...Nonetheless, each source of on-site operational noise is...

Last Modified: 05/04/2021

ApxA1_AQandGHGTechnicalReport.pdf

promulgated by the SCAQMD Governing Board as a tool to assist lead agencies to analyzed...Therefore, analyzing a project against these thresholds...

Last Modified: 07/09/2021

Tree Master Plan BURBANK 1.pdf

The relative performance index (RPI) is one way to further analyze the condition...In order to analyze the economic benefits of Burbank’s public...

Last Modified: 04/18/2024

Tree Master Plan BURBANK 1

The relative performance index (RPI) is one way to further analyze the condition...In order to analyze the economic benefits of Burbank’s public...

Last Modified: 04/18/2024

Appendix G - Geotechnical Report.pdf

regarding the foundation loading of this neighboring structure will be necessary to analyze

Last Modified: 01/07/2025

Decision Letter - Combined

view study is required as a part of the Hillside Development Permit process to analyze

Last Modified: 12/30/2025

2024-09 Treasurer's Report

away, Treasury volatility is almost at a 12-month high as the market continues to analyze

Last Modified: 05/20/2026

20211026-FY-2021-22-ADOPTED-BUDGET

ional Services 2,850$ 2,850$ 2,850$ 62165.0000 Special Recreation Contract Servi...It manages transportation projects such as street improvements and bikeways,...

Last Modified: 10/26/2021

20220504-Alameda North NPP Final Traffic Study-001.pdf

ROADWAY CAPACITY The residential street segments analyzed in this report were...Chapter 4 analyzes the traffic data collected before and after...

Last Modified: 05/04/2022

20201216.AdoptedBudget17_18.pdf

Analyze and expand microfilm applications, and transfer record to electronic images...The Standards of Cover is a document that analyzes response...

Last Modified: 12/16/2020

20201216.AdoptedCIP17_18.pdf

A DMS system provides the necessary advanced applications that continuously analyze...The Revenue Protection module analyzes our existing meter...

Last Modified: 12/16/2020

Appendix A - Air Quality Technical Report.pdf

This Technical Report also includes a section to analyze the Project’s potential...promulgated by the SCAQMD Governing Board as a tool to assist lead agencies to...

Last Modified: 01/07/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet