Search Results

Showing results for "dWA 0821 1305 0400 Penyedia Perbaikan Handheld XRF Analyzers X Met8000 Wilayah Yalimo Papua"

No results were found that matched the keywords: dWA 0821 1305 0400 Penyedia Perbaikan Handheld XRF Analyzers X Met8000 Wilayah Yalimo Papua.
Search Results

Burbank PMP Final Report 2025.pdf

SY) Note: Version 2, as the latest revision of the Decision Tree, was used to analyze...SY) Note: Version 2, as the latest revision of the Decision Tree, was used to...

Last Modified: 09/02/2025

ApxG1_Phase I ESA - Part 1.pdf

X X X X 3830R Y (WT) 3830S X/A (WT) ● X...

Last Modified: 07/09/2021

20210301_AppendixGHazardsandHazardous2_Avionre.pdf

X X X - 1981 Pacific Telephone - X X - 1980 Pacific Telephone -...

Last Modified: 03/31/2021

CIMP.pdf

X X X X X X X...

Last Modified: 03/25/2021

20260422-HSRCommentLetter-001.pdf

S-729 4’ x 6’ x 6’ Traffic Rated Pullbox Details L....Pad-mount switches shall rest on a 10’-6” x 7’...

Last Modified: 04/22/2026

Senator Portantino Secures $2,000,000 for Affordable Housing in Burbank

Portantino (818) 409-0400

Last Modified: 08/23/2023

Updated_Preliminary_Hydrology_Report.pdf

L 0.483]/[(Cd x It)0.519 x S0.135] Where......I x A Where......Proposed Analysis To...

Last Modified: 10/29/2024

Updated_Preliminary_Hydrology_Report (1).pdf

L 0.483]/[(Cd x It)0.519 x S0.135] Where......I x A Where......Proposed Analysis To...

Last Modified: 10/29/2024

Preliminary_Hydrology_Report_second page

L 0.483]/[(Cd x It)0.519 x S0.135] Where......I x A Where......Proposed Analysis To...

Last Modified: 05/14/2024

Preliminary_Hydrology_Report.pdf

L 0.483]/[(Cd x It)0.519 x S0.135] Where......I x A Where......Proposed Analysis To...

Last Modified: 01/11/2024

2024 Annual Military Equipment Report

This does not include a handheld, one-person ram • Firearms and ammunition of...Special events X....(Quantity: 9 / Cost: $40.00 each) ...

Last Modified: 08/12/2025

SR - Public Housing Agency Annual Plan

Each year, staff must analyze the HUD-published SAFMRs along with expected funding...Staff will analyze payment standards again in October 2026. ...

Last Modified: 03/26/2026

UpperLARiver_Draft_Appendix1.pdf

meeting the imposed quality assurance and quality control (QA/QC) criteria were analyzed...receiving water limits but not already accounted for in a TMDL or the 303(d)...

Last Modified: 03/25/2021

20220622-BurbankTransportationStudyGuidelines-001.pdf

Transportation Demand Management X....These locations should be analyzed as if they were intersections. B....X.

Last Modified: 06/22/2022

2026.06.22 Def-Resp. City of Burbank's Notice of Demurrer to Writ and Complaint.pdf

., (2009) 171 Cal.App.4th 1305 ....................................................requested that “Metro conduct subsequent environmental review under [CEQA] to...

Last Modified: 06/25/2026

Appendix F_HazMat Studies_Part 2.pdf

lt ol ue ne H ex an e Be nz en e To lu en e Et hy lb en ze ne m ,p -X...J8WsQCeBJK 23:78J8D_8I tuvwxyxz{x| ���������� �� �� ...

Last Modified: 12/13/2024

20210101_HDP_SUPPLEMENTAL_APP_12.18.18.pdf

Site – Provide one (1) set of color photos of the project in hardcopy (either 8.5” x...house or addition with photographs taken from neighboring properties to properly...

Last Modified: 05/18/2021

202101_Planning_ - HDP SUPPLEMENTAL APP 12.18.18.pdf

Site – Provide one (1) set of color photos of the project in hardcopy (either 8.5” x...house or addition with photographs taken from neighboring properties to properly...

Last Modified: 06/14/2021

20240709-TransportationStudyGuidelinesUpdate-001.pdf

Transportation Demand Management X....These locations should be analyzed as if they were intersections. B....X.

Last Modified: 07/09/2024

3425 Brace Canyon - Decision Letter.pdf

Any fire hydrants for this block shall be upgraded with a 4” X 2-2 ½” outlets....X 3 ft. in size in location(s) satisfactory to the City Planner...

Last Modified: 04/22/2022

1115 East Elmwood Avenue - Decision Letter.pdf

The view impacts of the proposed project have been analyzed by staff using story...The view impacts of the proposed project have been analyzed by...

Last Modified: 11/04/2022

1115 East Elmwood Avenue - Decision Letter (1).pdf

The view impacts of the proposed project have been analyzed by staff using story...The view impacts of the proposed project have been analyzed by...

Last Modified: 11/04/2022

20240624-BurbankTransportationStudyGuidelines-001.pdf

Transportation Demand Management X....These locations should be analyzed as if they were intersections. B....X.

Last Modified: 06/24/2024

ripa board report 2025

Stop Data Analysis This chapter of the report analyzes the 2023 RIPA data California...The report analyzes trends in the data for the 823,773...

Last Modified: 08/19/2025

HDP SUPPLEMENTAL APP 04.12.2022 FINAL.pdf

Site – Provide one (1) set of color photos of the project in hardcopy (either 8.5” x...house or addition with photographs taken from neighboring properties to properly...

Last Modified: 04/13/2022

Summer Calendar 8.5 x 11 US Letter (3).pdf

SUMMER HIGHLIGHTSSUMMER HIGHLIGHTSSUMMER HIGHLIGHTS SUMMER HIGHLIGHTSSUMMER HIGHLIGHTSSUMMER HIGHLIGHTS May 7 - 26 Pasadena Society of Artists Opening Reception May 7th | 2:00 PM - 4:00 PM...

Last Modified: 07/01/2022

3036 Scott Rd_Decision Letter_Final_Signed

A View Study was prepared by City staff to analyze the Project....The view impacts of the proposed Project have been analyzed by City staff...

Last Modified: 03/04/2025

6-22-21 PH - ATTACHMENT 1

The assumptions in their UWMP fall within the plausible future scenarios analyzed...Water Shortage Contingency Planning Section 7.11 x Section...

Last Modified: 06/10/2021

ApxH_HydrologyandWaterQualityTechnicalReport.pdf

Appendix C shows all the input parameters used to analyze the existing Site....To provide a more conservative analysis, this report analyzes the...

Last Modified: 07/09/2021

2021_Planning_Burbank2035 EIR Appendix F, Part 1.pdf

A total of 35 signalized intersections transportation staff) were analyzed, and...Analyzed Intersections Primary Transit Stations Metrolink # ¯...

Last Modified: 07/29/2021

2022_Planning_3252 N Frederic St - HDP & MSE Decision Letter w Attachments.pdf

A view study, included as Exhibit B in this letter, analyzes the view impacts of...X 3 ft. in size in location(s) satisfactory to the City...

Last Modified: 03/02/2022

UST with HM Removal Application

Samples shall be analyzed using appropriate EPA methods....The minimum-sized hole will be 24” x 24”....Samples shall be...

Last Modified: 10/06/2025

Don't Drive Distracted

Distracted driving is dangerous and continues to take lives. Learn what's considered distracted driving in California.

Last Modified: 10/13/2025

Attachment 1.pdf

The SCA shall analyze how the proposed project will impact wastewater flows and...Any fire hydrants for this block shall be upgraded with a 4” X...

Last Modified: 10/27/2022

20210101_3209_N_Castleman_Lane_Decision.pdf

The view impacts of the proposed project have been analyzed by staff using information...X 3 ft. in size in location(s) satisfactory to the City...

Last Modified: 04/13/2021

Burbank2035 EIR Appendix F, Part 2.pdf

CITYWIDE VEHICLE TRIPS Alternative Citywide VT [a] VT (I-I) VT (IX-XI) VT (X-X...[b] Through trips...

Last Modified: 07/29/2021

Project_Introduction_Letter_and_Eligibility_Checklist

(APN 2443‐026‐001) & 1305 W. Valleyheart Dr (APN 2443‐026‐026)....D U G O V I E J O Trader Joe's 9 Project Site LEGEND - CHOOSE MORE SITES X

Last Modified: 05/14/2024

Intro_Letter_with_Supporting_Attachments_for_NOI_Application.pdf

(APN 2443‐026‐001) & 1305 W. Valleyheart Dr (APN 2443‐026‐026)....D U G O V I E J O Trader Joe's 9 Project Site LEGEND - CHOOSE MORE SITES X

Last Modified: 01/11/2024

SR 2814 Empire Avenue staff report-FINAL (2).pdf

Under the oversight of the Community Development Director, City planning staff has analyzed...Additionally, a traffic signal warrant study was conducted as a part of the...

Last Modified: 10/27/2022

SR 2814 Empire Avenue staff report-FINAL.pdf

Under the oversight of the Community Development Director, City planning staff has analyzed...Additionally, a traffic signal warrant study was conducted as a part of the...

Last Modified: 10/20/2022

SR 2814 Empire Avenue staff report-FINAL (1).pdf

Under the oversight of the Community Development Director, City planning staff has analyzed...Additionally, a traffic signal warrant study was conducted as a part of the...

Last Modified: 10/20/2022

Appendix D - Historic Resource Assessment.pdf

X X - 1990 Pacific Bell - X X - 1986 Pacific Bell - X...

Last Modified: 01/07/2025

FEMA P-807 (2012)

Once the structure is modeled, it is not analyzed directly....Buildings with varied weak-story vulnerabilities were analyzed....For each weak- ...

Last Modified: 04/09/2024

Revised 3000 Empire Drainage and Hydrology Study.pdf

The dry well was sized by analyzing the proposed 85th percentile storm event volume...x ft x ft 2...

Last Modified: 07/11/2023

1018 N Sunset Canyon Dr_Decision Letter_View Study_Final

X X Signature of Applicant/Permittee Signature of Property Owner...a view study is required as part of the Hillside Development Permit...

Last Modified: 03/27/2025

Attachment K - Preliminary Hydrology Study.pdf 1

L 0.483]/[(Cd x It)0.519 x S0.135] Where......I x A Where......Proposed Analysis To analyze...

Last Modified: 06/26/2023

Attachment K - Preliminary Hydrology Study.pdf

L 0.483]/[(Cd x It)0.519 x S0.135] Where......I x A Where......Proposed Analysis To analyze...

Last Modified: 05/11/2023

Updated_Project_Introduction_Letter.pdf

(APN 2443‐026‐001) & 1305 W. Valleyheart Dr (APN 2443‐026‐026)....D U G O V I E J O Trader Joe's 9 Project Site LEGEND - CHOOSE MORE SITES X

Last Modified: 10/29/2024

526 S. Sunset Canyon Drive - SFSDP & HDP Decision Letter with Attachments.pdf

Staff analyzed the view impacts using the story poles, photographs, site plan,...shall be paid prior to the issuance of building permits: $150.00 per bedroom. 1...

Last Modified: 02/25/2022

Military Equipment Inventory - 2025 Annual Report_compressed (1)

This does not include a handheld, one-person ram • Firearms and ammunition of...Special events X....(Quantity: 12 / Cost: $40.00 each) ...

Last Modified: 01/29/2026

20210301_AppendixGHazardsandHazardous3_Avion.pdf

Additional Site Investigation Report Page 5-3 chromium-iron hydroxide [CrxFe1-x(...OH)3], where x can have values between 0 and 1....The ...

Last Modified: 03/31/2021

3333 Brace Canyon Road - HDP - Approval Letter

The view impacts of the proposed project have been analyzed by staff using story...The view impacts of the proposed project have been analyzed by...

Last Modified: 08/07/2024

3700 Riverside Final EIR.pdf

Therefore, the City does not have to analyze the impact of COVID-19, an existing...As analyzed in Draft EIR Section 7.3.6, “Westerly Shifted Site...

Last Modified: 03/18/2022

3700 RIverside - Final EIR Attachment 13.pdf

Therefore, the City does not have to analyze the impact of COVID-19, an existing...ATTACHMENT 13 - 602 O3-12 The commenter claims the Draft EIR fails to...

Last Modified: 03/24/2022

AB1826 Permitted Hauler List February 2026

366-3500 [email protected] PINNACLE DISPOSAL Temporary, C&D N/A (626) 480-1305

Last Modified: 04/14/2026

11/16/21 - PH - Attachment 5

• A SCEA is not required to discuss or analyze growth-inducing impacts, or project...effects required to be identified in the initial study have been identified and...

Last Modified: 11/04/2021

20210301_AppendixEGeotechInvestigat_Avion.pdf

• Planting schemes for landscaping around structures and pavement should be analyzed...LaboratoryDepth Lith- (feet) ology Material Description GJ a>i fO 3 CQ O c > o g...

Last Modified: 03/31/2021

Attachment 4..pdf

651 .50 FS 650 .50 FS 654 .50 FS 60+530+204 = 794s.f Landscaping 313.5 x..." 18 '-0 " OFFICE 006 009 313'-6" 60+530+204 = 794s.f Landscaping 313.5...

Last Modified: 10/27/2022

Attachment 4 (3).pdf

2,3,4,5,6, & 7TH FLOOR AREA = 18,526 S.F PER FLOOR TOTAL FLOOR AREA = 18526 X...651 .50 FS 650 .50 FS 654 .50 FS 60+530+204 = 794s.f Landscaping 313.5...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

2,3,4,5,6, & 7TH FLOOR AREA = 18,526 S.F PER FLOOR TOTAL FLOOR AREA = 18526 X...651 .50 FS 650 .50 FS 654 .50 FS 60+530+204 = 794s.f Landscaping 313.5...

Last Modified: 10/20/2022

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet