Showing results for "dWA 0812 2782 5310 Biaya Konstruksi Interior Ruang Cuci Dan Setrika Murah Laweyan Solo"
Each (13) Manufactured House $155.05 Each Unit (14) Partition (a) Commercial, Interior...to 30 lf (ii) Additional partition, up to 30 lf $15.65 Each (b) Residential,...
Last Modified: 06/20/2022
Each (13) Manufactured House $162.25 Each Unit (14) Partition (a) Commercial, Interior...of Occupancy/Condo Conversion $80.80 Each Unit (5) Close Existing Openings (a)...
Last Modified: 03/09/2023
AREA: COVERED AREA: LOT COVERAGE: FLOOR AREA RATIO (FAR): SETBACKS: FRONT REAR INTERIOR
Last Modified: 07/14/2023
improvements, Olive Recreation Center, Burbank Little Theater renovations, and minor interior
Last Modified: 12/02/2024
INTERIOR SIDE YARD SETBACK: 5' MIN. 5' MIN.
Last Modified: 11/23/2021
Last Modified: 05/15/2026
HDWD HDWR HORIZ HR HT HVAC HW INSIDE DIAMETER INCLUDE, INCLUDING INSULTATION INTERIOR...LINES LINE TYPESCEILING/EQUIPMENT HEIGHTS DIMENSION STRINGSINTERIOR...
Last Modified: 10/13/2022
more than two stories in height; • Non-structural or non-seismic storefronts, interior...required front or street side yard, but may be permitted within the required...
Last Modified: 01/17/2023
Showing 969 to 976 of 1,216 entries.