Showing results for "dWA 0821 1305 0400 [[Adefa]] Agen Geocomposite Slope Proyek Bima Nusa Tenggara Barat"
one unit vertical in 10 units horizontal (10 percent slope)....Slope. The top surface of footings shall be level....in 10 units horizontal ...
Last Modified: 11/24/2025
, TYP MIN 2% SLOPE, TYP MIN 2% SLOPE, T YP EQUIPMENT PAD 2 A303 1 A303 1 A301...ROOM DN PARKING RAMP 20 % SLOPE...
Last Modified: 07/25/2023
AutoCAD SHX Text SLOPE DN. 4% AutoCAD SHX Text SLOPE UP. 1.8% AutoCAD SHX Text...UP. 2.5% AutoCAD SHX Text SLOPE DN....
Last Modified: 11/05/2026
Fairview Subarea ID Existing Area (ac) 0.62 Flow Path Length (ft) 240.0 Flow Path Slope...Fairview Subarea ID Proposed Area (ac) 0.62 Flow Path Length (ft) 240.0 Flow Path...
Last Modified: 01/07/2025
Last Modified: 11/03/2026
SHALL SLOPE AWAY FROM THE FOUNDATION GRADE AROUND THE STRUCTURE SHALL SLOPE AWAY...THE STRUCTURE SHALL SLOPE AWAY FROM THE...
Last Modified: 11/27/2023
the existing deck), the proposed deck addition would rise 10’-0” from the natural slope
Last Modified: 01/13/2022
pool, will be built on a steep hillside area, with an approximately 30-degree slope...with California Building Code Section 1808.7, for foundations on or adjacent to...
Last Modified: 02/25/2022
Showing 233 to 240 of 606 entries.