Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta"
Last Modified: 09/15/2026
Lane Configurations Traffic Volume (veh/h) 196 548 27 129 508 50 66 841 95 176 1305...119 Future Volume (veh/h) 196 548 27 129 508 50 66 841 95 176...
Last Modified: 11/05/2026
engineering, and Burbank may need to ramp up workforce development efforts to fill..., particularly among those with a high school diploma or associate’s degrees,...
Last Modified: 05/09/2025
The area will provide more space at 355,000 square feet, filled with new and modern...In order to continue fill sequencing and uninterrupted...
Last Modified: 09/10/2026
but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling...but not limited to, marsh, vernal pool, coastal, etc.) through direct removal,...
Last Modified: 03/09/2022
19-29,088) The mechanical permit fee shall consist of the plan check fee, the filling...administration fee, plus the permit fee based on the total cubic yards of both cut...
Last Modified: 06/20/2022
calendar year The mechanical permit fee shall consist of the plan check fee, the filling...administration fee, plus the permit fee based on the total cubic yards of both...
0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 413 1103 492 561 1305...0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 400 1054 470 609...
Last Modified: 09/10/2021
Showing 1,073 to 1,080 of 1,210 entries.