Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Pemborong Geofoam Lightweight Fill ASTM Jakarta Pusat DKI Jakarta.
Search Results

CM-500_center_line_monuments.pdf

widening the opening to 3/4" diameter and 1/8" deep by chiseling or other means, and filling

Last Modified: 04/15/2021

102826 Olive-Verdugo Notice_Phase C Stage 1_NoHo BRT BURBANK.pdf

Water-filled barriers and pedestrian fencing will be placed for safety.

Last Modified: 10/29/2026

Appendix E_Preliminary Geotech.pdf

of excavations between 5 to 20 feet for construction of a certified recompacted fill...Fill material was observed between depths of 2 to 5 feet...

Last Modified: 12/13/2024

ApxF_PaleontologicalResourcesAssessmentReport.pdf

; alluvial fan deposits were encountered beneath the fill between 3 and 30.5 feet...The San Fernando Valley is an alluvium-filled basin with...

Last Modified: 07/09/2021

GreenWasteHomeLandscape.pdf

HANDLING GASOLINE  Fill cautiously.

Last Modified: 03/25/2021

Housing Enforcement Unit

Last Modified: 11/04/2026

DEIR Appendix K (LaTerra).pdf

the largest of the four basins, and comprises 91.2 percent of the total valley fill...total of 329,000 acres, consisting of approximately 123,000 2 acres of valley...

Last Modified: 05/04/2021

Att1-Resolution Certifying the Final Environmental Impact Report for the Media (1)

project applicant shall retain a qualified environmental professional, as defined by ASTM...13,500 square feet of building area, greater than 5,000 cubic yards of soil...

Last Modified: 10/29/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet