Showing results for "dWA 0821 1305 0400 [[Tigapillar]] Vendor Pengadaan Geobag Erosi Heavy Duty Batang Jawa Tengah"
, we noted the City did not have adequate internal controls designed to ensure vendors
Last Modified: 08/09/2022
The storage period cannot be expanded as the vendor's (Pelco) storage is proprietary
Last Modified: 04/22/2026
• Heavy timber....protected as required for exterior 1-hour fire-resistance-rated construction or heavy...to buildings with habitable spaces and...
Last Modified: 03/26/2026
SURFACE OF THE ALUMINUM SHALL BE COATED W/ (1) COAT OF ZINC CHROMATE PRIMER AND OR HEAVY...IT SHALL BE THE DUTY OF THE PERMITTEE TO NOTIFY THE...
Last Modified: 02/07/2025
Last Modified: 03/04/2025
and telephone number of the business, the time when the owner is no longer on duty
Last Modified: 04/13/2021
Date: Date: Note: Pursuant to Burbank Municipal Code (BMC) 10-1-19401 this duty
Last Modified: 11/12/2024
Last Modified: 12/19/2024
Showing 793 to 800 of 1,334 entries.