Search Results

Showing results for "dWA 0821 1305 0400 Harga Jasa Hidroseeding Green Project Gunungkidul DI Yogyakarta"

No results were found that matched the keywords: dWA 0821 1305 0400 Harga Jasa Hidroseeding Green Project Gunungkidul DI Yogyakarta.
Search Results

Exhibit B - Appeal Submittal_Redacted

community at large are appealing the granting of the AUP permit as the proposed project...The first public notice did not hold transparency as the description of such...

Last Modified: 07/24/2024

24-4,010 SB 9

is not a “project” subject to the requirements of CEQA....Project Application....Project Application.

Last Modified: 03/07/2024

Planning_2021_Burbank2035 DEIR.pdf

► Mitigation Measure 4.4-1c: Upgrade the BMC to incorporate California Green...The purpose of the California Green Building Standards Code is to...

Last Modified: 12/02/2021

2021_Planning_ Burbank2035 Draft Environmental Impact Report.pdf

Mitigation Measure 4.4-1c: Upgrade the BMC to incorporate California Green Building...The purpose of the California Green Building Standards Code...

Last Modified: 07/29/2021

FY 2025-26 Proposed Budget

and programs of the Burbank2035 General Plan, 2021-2029 Housing Element, 2022 Green...of recycled materials otires, asphalt and concrete materials, scrap metal, and...

Last Modified: 05/01/2025

TitleVI

Last Modified: 07/28/2025

25-4,034 Adopting by Reference 2025 CA Building Standards Code

Inspections shall be made to determine compliance with green building standards...CALIFORNIA GREEN BUILDING STANDARDS CODE DIVISION...

Last Modified: 11/24/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet