Showing results for "dWA 0852 2611 9277 [[GLORION]] Total Biaya Pemasangan Plafon Gypsum Elephant Gambir Jakarta Pusat"
Final Date:Permit Status: ADD 621 SF TO (E) 374 SF REC ROOM AND CONVERT TO ADU, TOTAL...Final Date:Permit Status: CONVERT (E) 360 GARAGE AND (E) 360 SF STORAGE SPACE...
Last Modified: 03/10/2025
The total project would be reduced by 2-3 stories of height and would be precluded...from providing 40 total units, including six affordable units.
Last Modified: 10/29/2024
City and state resources for landlords and tenants
Last Modified: 08/20/2026
required street-facing setback, which is determined by taking a percentage of the total...required street-facing setback, which is determined by taking a percentage of...
Last Modified: 05/02/2023
Zoning Review $ CA State Disabled Accessibility Fee $ Administrative Fee $ Total...floor plan of the business with each room labeled and dimensioned, along with the...
Last Modified: 03/19/2024
Last Modified: 06/26/2023
Last Modified: 06/29/2023
Showing 1,913 to 1,920 of 2,433 entries.