Search Results

Showing results for "dWA 0821 1305 0400 Maintenance Rutin XRF Handheld Ogan Komering Ilir Sumatera Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 Maintenance Rutin XRF Handheld Ogan Komering Ilir Sumatera Selatan.
Search Results

Composting

Last Modified: 09/03/2026

Waste Haulers

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 4-27-25

6841.97 3157.83 39.47 59.21 Facilities Maintenance...6 7 8 9 10 11 12 13 14 Page 61 of 74 Senior Lifeguard B.0900 BCEA ...

Last Modified: 05/07/2025

COB Grade Step Salary Listing, 5-25-25

6841.97 3157.83 39.47 59.21 Facilities Maintenance...40.06 60.09 Senior Lifeguard B.0900 BCEA ...

Last Modified: 06/03/2025

COB Grade Step Salary Listing, 6-21-26

WC Code 1 2 3 4 5 6 7 SALARY STEPS 8 9 10 11 12 13 14 Construction and Maintenance...62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA ...

Last Modified: 07/01/2026

COB Grade Step Salary Listing, 6-22-25.docx - Updated

7868.25 3631.50 45.39 68.09 Facilities Maintenance...41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 07/11/2025

COB Grade Step Salary Listing, 8-17-25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 87 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 08/18/2025

COB Grade Step Salary Listing, 6-22-25

7868.25 3631.50 45.39 68.09 Facilities Maintenance...41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 06/30/2025

COB Grade Step Salary Listing, 9-30-25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 88 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 10/07/2025

COB Grade Step Salary Listing, 3-15-26

WC Code 1 2 3 4 5 6 7 SALARY STEPS 8 9 10 11 12 13 14 Construction and Maintenance...40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 03/26/2026

COB Grade Step Salary Listing, 9-14-25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 87 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 09/22/2025

COB Grade Step Salary Listing, 12-21-25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 88 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 12/23/2025

COB Grade Step Salary Listing, 2-1-26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 88 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 02/11/2026

COB Grade Step Salary Listing, 11-25-25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 88 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 11/26/2025

COB Grade Step Salary Listing, 3-10-26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Page 19 of 88 Construction and Maintenance...3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 03/11/2026

COB Grade Step Salary Listing, 6-2-26

53.34 6317.74 2915.88 36.45 54.68 6475.67 2988.77 37.36 56.04 Fleet Maintenance...40.65 60.98 7221.46 3332.98 41.66 62.49 Senior Lifeguard B.0900 BCEA ...

Last Modified: 06/05/2026

COB Grade Step Salary Listing, 8-11-26.pdf

0.00 0.00 0.00 0.00 12086.32 5578.30 69.73 104.60 Construction and Maintenance...41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA ...

Last Modified: 08/13/2026

COB Grade Step Salary Listing, 8-11-26.pdf

0.00 0.00 0.00 0.00 12086.32 5578.30 69.73 104.60 Construction and Maintenance...41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA ...

Last Modified: 08/13/2026

COB Grade Step Salary Listing 8-11-26

0.00 0.00 0.00 0.00 12086.32 5578.30 69.73 104.60 Construction and Maintenance...41.46 62.19 7365.89 3399.64 42.50 63.75 Senior Lifeguard B.0900 BCEA ...

Last Modified: 08/13/2026

January Training Summary.pdf

Drills (Unconventional positions with unknown distances) 1400-1500: Range/Gear Maintenence

Last Modified: 02/05/2026

20260421-OliveAvenueCompleteStreetsReconfiguration-001.pdf

Complete Streets Project • Project part of the larger local residential routine maintenance

Last Modified: 04/21/2026

20260421-OliveAvenueCompleteStreetsReconfiguration-001 (1).pdf

Complete Streets Project • Project part of the larger local residential routine maintenance

Last Modified: 04/22/2026

20260421-OliveAvenueCompleteStreetsReconfiguration-002.pdf

Complete Streets Project • Project part of the larger local residential routine maintenance

Last Modified: 04/22/2026

20260421-OliveAvenueCompleteStreetsReconfiguration-003.pdf

Complete Streets Project • Project part of the larger local residential routine maintenance

Last Modified: 04/22/2026

20210312 Commercial Rental Application.pdf

__________________________________ Phone: ________________________ BUILDING MAINTENANCE

Last Modified: 03/12/2021

20210312 Apartment Rental Application.pdf

__________________________________ Phone: ________________________ BUILDING MAINTENANCE

Last Modified: 03/12/2021

20130213_Chapter 6 - Open Space and Conservation.pdf

Ongoing maintenance of parks, open  space, and  recreation  facilities and  the ...GOAL 3 PARKS AND RECREATION FACILITIES MAINTENANCE  Parks  and ...

Last Modified: 11/17/2021

5. Transportation Commission_Redacted

1999 Staff Engineer Various Engineering positions in Design, Traffic Design, Maintenance...Developed and conducted SMS training programs for the...

Last Modified: 06/12/2025

Traffic Advisory: Temporary Closure of the 134 West Freeway and 5 North Freeway Interchange

excavation and construction of sewer access pits, replacement/rehabilitation of existing maintenance

Last Modified: 03/27/2026

Traffic Advisory: Temporary Closure at I-5 North & 134 West Interchange

excavation and construction of sewer access pits, replacement/rehabilitation of existing maintenance

Last Modified: 04/02/2026

Updated Traffic Advisory: Temporary Full Closure at 1-5 North & 134 West Interchange

excavation and construction of sewer access pits, replacement/rehabilitation of existing maintenance

Last Modified: 04/03/2026

VAF - 2023 - (5).pdf

CLOSED: 11/10/23 Veterans Day, 11/23 - 11/24/23 Thanksgiving Day, 12/7 - 12/15/23 Maintenance

Last Modified: 10/26/2023

VAF - 2023 - (6).pdf

CLOSED: 11/10/23 Veterans Day, 11/23 - 11/24/23 Thanksgiving Day, 12/7 - 12/15/23 Maintenance

Last Modified: 10/26/2023

VAF - 2023 - (7).pdf

CLOSED: 11/10/23 Veterans Day, 11/23 - 11/24/23 Thanksgiving Day, 12/7 - 12/15/23 Maintenance

Last Modified: 11/06/2023

Table test

a) mailing fee for $376.66; b) noticing fee for $376.66; or c) general plain maintenance

Last Modified: 06/17/2025

Burbank Adds Re-roofing Permits to Online Services and Introduces Pre-Approved ADU Program

permits such as plumbing, electrical, mechanical, building upgrades, repairs, and maintenance

Last Modified: 01/31/2023

MCP - 2022 - Summer.pdf

CLOSURE: VAF Annual Maintenance Aug 14— Aug 28, 2022.

Last Modified: 08/15/2022

MCP - 2022 - Summer (1).pdf

CLOSURE: VAF Annual Maintenance Aug 14— Aug 28, 2022.

Last Modified: 08/15/2022

Parks and Recreation Department Seeks Qualified Applicants to Manage and Operate the Burbank Center Stage

The Operator will be responsible for all day-to-day operations and maintenance of

Last Modified: 01/26/2023

Public Works

Last Modified: 07/17/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet