Search Results

Showing results for "dWA 0821 1305 0400 Repair Thermo Scientific Dxl XRF Wilayah Manokwari Selatan Papua Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 Repair Thermo Scientific Dxl XRF Wilayah Manokwari Selatan Papua Barat.
Search Results

2022.0202-FY-21-22-Fee-Schedule-Final-Rev-4.pdf

b) 1.2201 $993 27 Printing, Publishing & Allied Industry 1000 SF 1.2201 $993 75 Repair...Aerosol Products $341.00 Year Aircraft Refueling Vehicles $296.00 Year Aircraft...

Last Modified: 06/20/2022

ATTACHMENT 12-with page numbers - reduced.pdf

Metropolitan shall not be responsible for repair or replacement of improvements,...without notice, as may be required by Metropolitan for ongoing maintenance, access,...

Last Modified: 09/16/2022

Library: LA Fixit Clinic in Burbank

clothes, or other items, bring them to us for assessment, disassembly, and possible repair

Last Modified: 11/06/2025

5-3 - PH Attachment 7

Electrification Plan 14 At existing gas lines, gas companies will be required to repair

Last Modified: 04/21/2022

Attachment 7 - Sustainable Commission Recommendations.pdf

Electrification Plan 14 At existing gas lines, gas companies will be required to repair

Last Modified: 04/21/2022

Attachment 1 - Burbank URGENCY Tenant Protection Ordinance Updated.pdf

that “[c]osmetic improvements alone, including painting, decorating, and minor repairs

Last Modified: 09/13/2023

Burbank_Rec-Center-Newsletter_Summer-2025

as well as wrap around sewage pumping equip- ment, which may result in costly repairs

Last Modified: 06/17/2026

Attachment 9 – December 11, 2023 Planning Board Minutes.pdf

pursuant to Section 15301 Class 1 (Existing Facilities) pertaining the operation, repair

Last Modified: 01/18/2024

2023 - EOY Nominations Packet.pdf

Recently, Tony hiked several miles on the Wildwood Trail to capture photos of trail repair

Last Modified: 10/12/2023

BPL Baseball Rules 2026-27

.: injury, equipment repair, etc.).

Last Modified: 11/05/2026

CIP Projects In Planning/Design

Last Modified: 04/21/2026

3-1-22 - ED - Attachment 1_Redacted

He has set up and initiated emergency projects, such groundwater recharge basin repairs...in Ontario, CA and underground vault repairs at Carbon...

Last Modified: 02/04/2022

2022 BPAP Plan Check Correction List

An approved smoke alarm shall be installed for new construction and alteration, repair...where no construction is taking place or in building undergoing alteration or...

Last Modified: 11/15/2024

Attachment 3 – FY 2025-26 CDBG Applications

o Financial Empowerment Workshops: Educate families on budgeting, credit repair,...If approved, the refrigerator(s) would be replaced and/org...

Last Modified: 05/29/2025

Exhibit A (002)v3 FR comments (IJM edits).pdf

The damaged structure may be repaired or rebuilt to the area, footprint and height...Such repairs must be commenced within one (1) year of the...

Last Modified: 01/27/2022

Soil Vapor Extraction System Upgrade Project Draft Supplemental EIR

Any fossil specimens recovered from the Project would be scientifically significant..., and advice from the Clean Air Scientific Advisory...

Last Modified: 10/14/2026

1. Planning Commission_Redacted

Oral presentation at the 24th annual scientific meeting of the Society for Research

Last Modified: 06/12/2025

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

 West: 1300 Morningside & 1305 W.... West: 1300 Morningside & 1305 W.

Last Modified: 12/26/2023

BPOA.pdf

Equipment Repair/Replacement 41 The City shall provide for the repair...Expenses for the repair or replacement...

Last Modified: 01/20/2021

202101_Plans_1023 North Cordova St. Plans - 02 23 2021.pdf

A PERMIT FOR ALTERATIONS, REPAIRS, OR ADDITIONS, EXCEEDING $1,000, SHALL REQUIRE...FOR ROUTINE INSPECTION AND MAINTENANCE BY THE OWNER / OCCUPANT & FOR SERVICE &...

Last Modified: 06/15/2021

Planning_Attachments A-K_3001 W Empire Ave.pdf

wall surrounding the storage area at least six (6) feet in height and in good repair...No person shall erect, construct, alter, repair, raise,...

Last Modified: 01/07/2022

Att2 – Heritage Commission Report with Attachments Dated September 4, 2025

building appears to be in good condition and has been well maintained, although repairs...based bank84 The bank building, Magnolia Service Station, Magnolia Garage...

Last Modified: 01/29/2026

20230515-FY-2023-24-Proposed-Budget-Study-Session-Discussion-Papers-for-May-16-2023.pdf

placement, housing stability case management, mediation, legal services, and credit repair...placement, housing stability case management, mediation, legal services, and ...

Last Modified: 05/15/2023

NOI Attachments A-K.pdf

wall surrounding the storage area at least six (6) feet in height and in good repair...No person shall erect, construct, alter, repair, raise,...

Last Modified: 05/24/2023

Composting

Last Modified: 11/13/2026

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

POOL) (CLR.) 31 '-5 " OUT-LINE OF (E) PART OF POOL REMOVE & REPAIR (TYP.)...PART OF EXISTING POOL REPAIR.2. EXIST'G. BASEMENT / CRAWL SPACE...

Last Modified: 02/16/2024

20210107-2010B-Series-BWP-Water-Revenue-Bonds.pdf

Business management is the replacement and repair of the meters, and water supply...The purpose of the PHG is to provide scientific guidance to...

Last Modified: 01/07/2021

Attachment 1 - BHA Resolution (1).pdf

The maximum time period to make these repairs will be 30 calendar days....Time Standards for Repairs 1....For non-emergency items,...

Last Modified: 03/28/2024

DRAFT REVISED PHA ADMIN PLAN - HOTMA.pdf

The maximum time period to make these repairs will be 30 calendar days....Time Standards for Repairs 1....For non-emergency items,...

Last Modified: 06/23/2026

DRAFT REVISED PHA ADMIN PLAN - HOTMA.pdf

The maximum time period to make these repairs will be 30 calendar days....Time Standards for Repairs 1....For non-emergency items,...

Last Modified: 06/25/2026

Att2 - Proposed 2026 Amended Administrative Plan (Redline)

The maximum time period to make these repairs will be 30 calendar days....Time Standards for Repairs 1....For non-emergency items,...

Last Modified: 08/13/2026

AMENDED BHA ADMIN PLAN 2026 - HOTMA.pdf

The maximum time period to make these repairs will be 30 calendar days....Time Standards for Repairs 1....For non-emergency items,...

Last Modified: 10/12/2026

Residential Parking Permit Program FAQs (24-25)_updated

liability, end of lease, donation letter, transfer, accident report, auto body repair

Last Modified: 01/06/2025

2025 NOV FINALED

INCLUDE MEPs, DRYWALL REPAIR AS NEEDED. SUBJECT TO FIELD VERIFICATION.

Last Modified: 12/01/2025

2026 FEB FINALED

Date:Permit Status: REMODEL BATHROOMS, KITCHEN, NEW WINDOWS, NEW ROOF, STUCCO REPAIR

Last Modified: 03/03/2026

3313 Wedgewood Ln - Decision Letter - Signed.pdf

The repairs and/or reconstruction will be required whether the damage is pre-existing

Last Modified: 08/24/2023

2021_Planning_802 E. Angeleno - Architectural - 08.05.21.pdf

AN APPROVED SMOKE ALARM SHALL BE INSTALLED FOR NEW CONSTRUCTION AND ALTERATION, REPAIR...APPROVED CARBON MONOXIDE ALARM SHALL BE INSTALLED FOR NEW CONSTRUCTION AND...

Last Modified: 08/26/2021

719 Wilson Ct_HDP_Revised Plans 121423

certified by Department of Consumer Affairs, Bureau of Electronic and Appliance Repair...An approved smoke alarm shall be installed for new construction and alteration,...

Last Modified: 01/31/2024

ATTACHMENT 11.pdf

federal and State acts lend protection to species considered rare enough by the scientific...The Public Works Department conducts repairs and...

Last Modified: 09/16/2022

Planning_2021_ 929 E San Jose Project Plans.pdf

FOR HUMAN OCCUPANCY, UPON THE OWNERS PPLICATION FOR A PERMIT FOR ALTERATIONS, REPAIRS...EXCEEDING ONE THOUSAND DOLLARS ($1,000) g) WHERE A PERMIT IS REQUIRED FOR...

Last Modified: 12/07/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet