Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Jual Waterproofing Geoteknik Berkualitas Kubu Raya Kalimantan Barat"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Jual Waterproofing Geoteknik Berkualitas Kubu Raya Kalimantan Barat.
Search Results

2025 JUL ISSUED

REMOVE AND REPLACE DAMAGED SHEATHING AND INSTALL NEW WATERPROOFING SYSTEM AND FLASHING...DESERT CRETE DECKING SYSTEM IAPMO UES 586 CAPITAL DECK & STAIR...

Last Modified: 08/11/2025

Soils Report.pdf

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 02/08/2023

Soils Report.pdf (1)

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 06/23/2023

3700 RD_Proposed Architectural Plans.pdf

WATERPROOF WALLS AND BOTTOM (HOT APPLIED ASPHALT MEMBRANE, PROTECTION COURSE AND...IRRIGATION SERVICE NOTE: WATERPROOFING SYSTEM - CONTRACTOR...

Last Modified: 03/04/2022

CIP Projects In Planning/Design

Last Modified: 04/21/2026

Project Plans FINAL

WALL 2CUT AREA NATURAL GRADE WATERPROOFING 4" PERFORATED PIPE WRAP W/GEO FABRIC...WALL 2 STEPPED WITH GRADE BEAM FILL AREA WATERPROOFING 4"...

Last Modified: 06/02/2026

2026 APR ISSUED

ORCHARD DR Single-Family Repair / Maintenance $7,500.00Valuation: CODE ENFORCEMENT: WATERPROOFING...8182444000 91352CASun Valley Contractor 8309 Tujunga Avenue, Suite...

Last Modified: 05/28/2026

20220901-FY-2022-23-Adopted-CIP

This project will include design and construction to restore the waterproofing system...A third-party waterproofing systems engineer has performed...

Last Modified: 09/01/2022

2025 JUN FINALED

Permit Status: 3rd Floor Walkway - repair water damaged area, replace plywood, new waterproofing

Last Modified: 07/01/2025

4100 Riverside Dr - Project Plans.pdf

S U T VERTICAL VERIFY IN FIELD VOLUME WEST WITH WITHOUT WOOD WATER HEATER WATERPROOFING...WATERPROOFING MEMBRANE WEIGHT V W 1 7 A E J ...

Last Modified: 10/13/2022

7-13-21 BCC - 7. Planning Board_Redacted.pdf

construction industry as a construction consultant specializing in roofing and waterproofing...civil engineers to work for me on any number of construction projects roofing...

Last Modified: 06/17/2021

2025 NOV ISSUED

FRAMING OF STAIRWAY AND GUARDRAIL REPLACEMENT AT 2ND FLOOR CAPITAL DECK & STAIR WATERPROOFING...2025 FREDERIC ST Pool/Spa $20,000.00Valuation: NEW POOL & SPA (360 SF) ...

Last Modified: 12/01/2025

Appendix H - Hydrology Study.pdf

........................................................................... 20 Waterproofing...It is recommended that the design team, including the structural engineer,...

Last Modified: 01/07/2025

2021_Planning_Plans_4336 CLYBOURN AVE_may submittal.pdf

Water Closet WD Wood WP Waterproof WPM Waterproof Membrane WSCT Wainscot W.S.P.

Last Modified: 07/22/2021

FY 2024-25 Adopted CIP_Final

The current waterproofing systems are failing and require complete restoration.  ...A third-party waterproofing systems engineer has performed a...

Last Modified: 09/05/2024

Safe Routes to School

Last Modified: 04/21/2026

7-13-21 BCC - 1. Infrastructure Oversight Board_Redacted.pdf

construction industry as a construction consultant specializing in roofing and waterproofing...civil engineers to work for me on any number of construction projects roofing...

Last Modified: 06/17/2021

Preparedness for Older Adults

Simple steps to stay safe during emergencies—what to pack, how to plan, and how to protect yourself, your loved ones, and your pets from disasters.

Last Modified: 10/21/2025

20230911-FY-2023-24-v.2-Adopted-CIP-Complete.pdf

Additional design services were needed to address the unique waterproofing system...The current waterproofing systems are failing and require ...

Last Modified: 09/11/2023

Updated Project Plans

Text PROJECT TITLE: AutoCAD SHX Text THIRD FLOOR ROOF PLAN BUILT-UP ROOF WITH WATERPROOF...CLASS "A" ROOF COVERING SYSTEM "TUFFLEX SYSTEM PED ON PLYWOOD" BUILT-UP...

Last Modified: 09/25/2025

Attachment J - Preliminary Low Impact Development Plan (LID).pdf 1

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 06/26/2023

Updated_Preliminary_Low_Impact_Development_Report.pdf

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 10/29/2024

Preliminary_Low_Impact_Development_Report

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 05/14/2024

Attachment J - Preliminary Low Impact Development Plan (LID).pdf

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 05/11/2023

Preliminary_LID_Report.pdf

The design and inspection of the waterproofing is not the responsibility of the...A waterproofing consultant should be retained in order to...

Last Modified: 01/11/2024

Sandbags

Learn how to properly fill and stack sandbags, what they’re best used for, and where to get free sandbags in Burbank before the next storm hits.

Last Modified: 06/10/2026

Consistency Matrix - SB35 NOI - 910 S Mariposa

Requirement Map, which AIRPORT requires FAA Notice for all structures with height at 10-1-1305

Last Modified: 03/19/2024

2nd Submittal SB35 - 910 S Mariposa - Consistency matrix.pdf

requires FAA Notice for all structures with height at limits allowed by code. 10-1-1305

Last Modified: 07/06/2023

Planning Comments - Final Objective Standard Review

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The

Last Modified: 05/06/2024

Updated_Objective_Standards_Consistency_Matrix.pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Updated_Objective_Standards_Consistency_Matrix (1).pdf

Yes HOPE AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

AIRPORT The proposed building heights does not exceed 200 feet. 10-1-1305

Last Modified: 05/14/2024

719 Wilson Ct_HDP_Revised Plans 121423

Window/Door Framing Integral Jamb Flashing by Window Manufacturer or Bituthene Waterproofing...GWB Door/Window Header Integral Flashing by Window Manufacturer or...

Last Modified: 01/31/2024

250220_City of Burbank - Home Again Los Angeles

WATER RESISTANT WEIGHT WATERPROOF ABBREVIATIONS SYMBOL LEGEND DRAWING INDEX PROJECT...(B) PRE-CUT EITHER WATERBLOCK NAIL ON FLASHING (NOF) OR...

Last Modified: 02/25/2025

Burbank 25-26 CIP PDF Final

A third-party waterproofing systems engineer has performed a leak investigation and...The restoration of the building's waterproofing system is...

Last Modified: 09/11/2025

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 07/25/2023

DEIR Appendix E (LaTerra).pdf

containers were made for cooking and storage and an increased use of asphalt for waterproofing

Last Modified: 05/04/2021

840 E Verdugo - Plans

PROVIDE FIBER GLASS WATER HEIGHT WATERPROOFING COMPOUND AT 2....PROVIDE 2-LAYER OF #15 FIBER GLASS WATERPROOFING MEMBRANE JUNCTIONS, CORNERS...

Last Modified: 08/18/2022

20240502-FY-2024-25-Proposed-Budget-COMPLETE

systems for the facility including, subterranean waterproofing, architectural planters...The current waterproofing systems are failing and require...

Last Modified: 05/02/2024

Attachment C - Objective Standards Consistency Matrix.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 06/26/2023

Attachment C - Objective Standards Consistency Matrix.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project site

Last Modified: 05/08/2023

2613 W Magnolia Blvd - Project Plans - 1-15-24

EXTERIOR FINISH GAUGE 28 BONDED METAL FLASHING SHIP-LAP WATERPROOFED PAPER BACKED

Last Modified: 01/31/2024

2607 W Magnolia Blvd - Approved Project Plans - STAMPED

EXTERIOR FINISH GAUGE 28 BONDED METAL FLASHING SHIP-LAP WATERPROOFED PAPER BACKED

Last Modified: 02/15/2024

Combined Attachments A-N.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 05/24/2023

Attachment 3 - SB 35 Application inclusive of the SB 35 NOI App reduced.pdf

 West: 1300 Morningside & 1305 W.... West: 1300 Morningside & 1305 W.

Last Modified: 12/26/2023

2025-08-08_Full Set (Arch+Civil+Land) - Copy

WATERPROOFING PER ARCH. PLAN 1. HARDSCAPE, BASE PREPARATION PER SOILS REPORT....WATERPROOFING PER ARCH. PLAN 1. HARDSCAPE, BASE PREPARATION PER...

Last Modified: 12/02/2025

PLANS RIVR_DensityBonusApp_231121_R2.pdf

VERTICAL VERIFY IN FIELD VOLUME WEST WITH WITHOUT WOOD WATER HEATER WATERPROOFING...WATERPROOFING MEMBRANE WEIGHT # & < @ AB ACT ...

Last Modified: 12/21/2023

2026 FEB ISSUED

SCREENLAND DR Multi-Family Repair and Maintenance $3,000.00Valuation: REPLACE (E) WATERPROOFING...VISTA ST Multi-Family Repair and Maintenance $3,000.00Valuation: ...

Last Modified: 03/03/2026

20230504-FY-2023-24-Proposed-Budget-Final.pdf

Parking Area  Waterproofing  and Restoration   Police‐Fire  Headquarters  Flooring...systems for the facility including, subterranean...

Last Modified: 05/04/2023

20220421-FY-2022-23-Proposed-Annual-Budget-Final.pdf

Roof and  Envelope  Waterproofing   Police‐Fire  Headquarters  Flooring  24375...A third-party waterproofing systems engineer has performed a...

Last Modified: 04/21/2022

20201210.AdoptedCIP19_20.pdf

A consultant has started the design of a new waterproofing system for the outside...After design is complete, the construction of the waterproofing...

Last Modified: 12/10/2020

20201216.AdoptedCIP17_18.pdf

A consultant has started the design of a new waterproofing system for the outside...After design is complete, the construction of the waterproofing...

Last Modified: 12/16/2020

20210101_1258_E_Elmwood_ProjectPlans.pdf

FLANGE (STEEL) WG WIRED GLASS WI WROUGHT IRON WIN WINDOW WM WIRE MESH W/O WITHOUT WP WATERPROOF

Last Modified: 04/13/2021

920 E Grinnell Dr - Project Plans - 12-16-22.pdf

OUTLET # # SEE PLAN NOTES ON THIS SHEET # WATERPROOF SYSTEM ESR-2785N PROPOSED...OUTLET # # SEE PLAN NOTES ON THIS SHEET # WATERPROOF...

Last Modified: 02/09/2023

2025 AUG ISSUED

HELMS POOL AND SPA 9499230050 93428CACAMBRIA Contractor 337 WARWICK ST LEONEL RAYAS

Last Modified: 09/02/2025

Attachment E - City Department Comments.pdf

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 01/17/2023

Attachment E - City Department Comments.pdf 1

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1-1309 The Project

Last Modified: 06/26/2023

2019 W Magnolia - Decision Letter - 260408

Heights Surrounding Bob Hope Airport 10-1-1305: FEDERAL AVIATION ADMINISTRATION

Last Modified: 04/08/2026

Consistency Matrix - SB 35 NOI

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Project Applicant's Submitted Consistency Matrix

HEIGHTS SURROUNDING BOB HOPE AIRPORT 10-1-1305 through 10-1- 1309 The Project

Last Modified: 09/25/2025

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet