Search Results

Showing results for "dWA 0821 1305 0400 [[Adefa]] Vendor Pengadaan Grass Block di Lubuklinggau Sumatera Selatan"

No results were found that matched the keywords: dWA 0821 1305 0400 [[Adefa]] Vendor Pengadaan Grass Block di Lubuklinggau Sumatera Selatan.
Search Results

BPOA.pdf

Compensation for Accrued Sick Leave If an employee with unused sick leave credit dies

Last Modified: 01/20/2021

2025 NOV ISSUED

TAVITIAN 818-312--0 91367CAWOODLAND HILLS Contractor 5942 LUBAO AVENUE Fernando Di

Last Modified: 12/01/2025

10032023-Final Draft Initial Study Mitigated Negative Declaration-001.pdf

physical placement would consider the street drainage patterns so as to avoid blocking...permanent closure would not be installed within gutter flow lines, so would not...

Last Modified: 10/04/2023

10032023-Final Draft Initial Study Mitigated Negative Declaration-001 (1).pdf

physical placement would consider the street drainage patterns so as to avoid blocking...permanent closure would not be installed within gutter flow lines, so would not...

Last Modified: 10/04/2023

10032023-Final Draft Initial Study Mitigated Negative Declaration-001.pdf

physical placement would consider the street drainage patterns so as to avoid blocking...permanent closure would not be installed within gutter flow lines, so would not...

Last Modified: 10/04/2023

4. Sustainable Burbank Commission_Redacted.pdf

H&R BLOCK 2004 - 2005 Field Marketing Manager Managed and executed marketing plans...for targeted H&R Block offices in Southern California for...

Last Modified: 06/15/2023

Burbank

Last Modified: 05/07/2026

20210101_Fiscal Year 2018-2019 Consolidated Plan Annual Performance Evaluation Report.pdf

The City receives Community Development Block Grant (CDBG), HOME Investment Partnership

Last Modified: 05/20/2021

20210524_Burbank_Affordable_Housing_Analysis_&_Strategy.pdf

decreased even more with the possible reduction/elimination of Community Development Block

Last Modified: 05/25/2021

Draft Burbank HOME ARP Allocation Plan.pdf

housing and public services with the use of federal funds from Community Development Block

Last Modified: 02/17/2023

ERRCS Regulations

19.Donor Path Rights - Any person or entity constructing a new structure that blocks

Last Modified: 10/14/2025

EMS Billing FAQS for Non-EMS Members

Last Modified: 04/14/2026

Burbank_Affordable_Housing_Analysis_&_Strategy..pdf

decreased even more with the possible reduction/elimination of Community Development Block

Last Modified: 04/10/2026

2026.06.18 Pet. Metro's Motion for Preliminary Injunction.pdf

Yet the City is withholding the Excavation Permit itself, blocking even work that

Last Modified: 06/22/2026

Draft EIR.pdf

spreading lantana, variegated myrtle, dwarf olive, kangaroo paws, cape rush, Mexican grass...The car wash building would also be blocked from...

Last Modified: 03/24/2022

Planning_2021_3700 Riverside Draft EIR.pdf

spreading lantana, variegated myrtle, dwarf olive, kangaroo paws, cape rush, Mexican grass...The car wash building would also be blocked from...

Last Modified: 11/29/2021

3252 N Frederic St 1-29-22.pdf

INFORMATION ADDRESS: 3252 N FREDERIC ST BURBANK CA 91504ZONING DESIGNATION: R-1 BLOCK

Last Modified: 02/08/2022

EMS Membership - FAQs

Read frequently asked questions about the EMS Membership program of the Burbank Fire Department.

Last Modified: 04/30/2026

Fire Stations

Last Modified: 04/30/2026

Treasurer's Reports

Last Modified: 07/01/2026

BPOA MOU (2021-2024) - Final 03.07.22 - Fully Executed.pdf

Compensation for Accrued Sick Leave If an employee with unused sick leave credit dies

Last Modified: 06/02/2022

20210401_3700RD_Appendix_B.pdf

been subdivided over the years and only the house and barn remained when Jeffries died

Last Modified: 04/12/2021

BPOA MOU (2024-2027) - Final, signed.pdf

Compensation for Accrued Sick Leave If an employee with unused sick leave credit dies

Last Modified: 12/02/2024

BPOA MOU (2021-2024).pdf

Compensation for Accrued Sick Leave If an employee with unused sick leave credit dies

Last Modified: 03/08/2022

FEMA P-807 (2012)

While its massing and block location are similar to the top building, it has a...made of a group of entities. 14. : Insert a block. 15. :...

Last Modified: 04/09/2024

ApxG1_Phase I ESA - Part 1.pdf

whatsoever under any course of action against Partner, its officers, employees, vendors..., indemnify and hold Partner, Client and their respective officers, employees,...

Last Modified: 07/09/2021

3000 SB35 - Plans.pdf

1 HR ROOF CONSTRUCTION 1 HR SEPARATE PERMIT APPLICATION FOR: GRADING WORK R&R, BLOCK...transformer vault 2 Electrical switch gear3 Fire department hammer head4 Turf...

Last Modified: 06/29/2023

Exhibit A 3000 Empire Plan 122822.pdf

1 HR ROOF CONSTRUCTION 1 HR SEPARATE PERMIT APPLICATION FOR: GRADING WORK R&R, BLOCK...transformer vault 2 Electrical switch gear3 Fire department hammer head4 Turf...

Last Modified: 05/02/2023

2023 OIR Report

This was approximately one block from the home she had been staying....Officers pulled the subject off of a cinder block wall when he attempted...

Last Modified: 08/19/2025

Updated Project Plans

The contractor shall provide all necessary blocking, backing, framing, hangers or...FACEWF = FRONT OF WALKFW = TOP OF WALLTW WATER METER GAS METER FREE STAND ...

Last Modified: 09/25/2025

20210401_3700RD_Initial_Study_Review_Draft.pdf

spreading lantana, variegated myrtle, dwarf olive, kangaroo paws, cape rush, Mexican grass...challenged the new standard in court and the implementation of the standard...

Last Modified: 04/12/2021

Planning_ 2021_ 3700 Riverside Appendix 11.1_ISNOP.pdf

spreading lantana, variegated myrtle, dwarf olive, kangaroo paws, cape rush, Mexican grass...challenged the new standard in court and the implementation of the standard...

Last Modified: 11/29/2021

20200112-2015-Tax-Allocation-Refunding-Bond.pdf

The Downtown Burbank core spans a four -block area along San Femando Boulevard,...from Magnolia Boulevard to Verdugo Avenue, and the side -blocks...

Last Modified: 01/12/2021

20130213_Chapter 3 - Land Use.pdf

Policy 3.1  Recognize neighborhoods and  districts as the building blocks of  the

Last Modified: 11/17/2021

CPI - April 2025.pdf

for the CPI’s leased cars and trucks index with transaction data purchased from a vendor

Last Modified: 06/11/2025

3700 RD_Proposed Architectural Plans.pdf

CONSTRUCT RAISED "FLOW-THRU" PLANTER FROM REINFORCED CONCRETE OR MASONRY BLOCK (...PRECISION BLOCK).

Last Modified: 03/04/2022

DEIR Appendix F (LaTerra).pdf

Vegetation onsite consists of grass and trees on the east periphery....earthquake event. 7.1.16 Foundations for small outlying structures, such as...

Last Modified: 05/04/2021

Appendix 11.1B_Cultural Report.pdf

been subdivided over the years and only the house and barn remained when Jeffries died

Last Modified: 11/29/2021

COVID-19 Tenant Protections Resolution to Extend.pdf

County funded small business loan programs, including the Community Development Block

Last Modified: 01/28/2022

Burbank GGRP CEQA_3.9.2022_CLEAN.pdf

targeted towards low-income neighborhoods to identify neighborhoods or building blocks...structures) so that at least 20 percent of parking supply (one or two spaces per...

Last Modified: 03/09/2022

Attachment 4..pdf

1 HR ROOF CONSTRUCTION 1 HR SEPARATE PERMIT APPLICATION FOR: GRADING WORK R&R, BLOCK...per electrical drawings11 11 11 11 11 Policy 2.6: SEE SHEET A0.1 & A0.2 Turf...

Last Modified: 10/27/2022

2814 Empire Plans.pdf

1 HR ROOF CONSTRUCTION 1 HR SEPARATE PERMIT APPLICATION FOR: GRADING WORK R&R, BLOCK...per electrical drawings11 11 11 11 11 Policy 2.6: SEE SHEET A0.1 & A0.2 Turf...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

1 HR ROOF CONSTRUCTION 1 HR SEPARATE PERMIT APPLICATION FOR: GRADING WORK R&R, BLOCK...per electrical drawings11 11 11 11 11 Policy 2.6: SEE SHEET A0.1 & A0.2 Turf...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

1 HR ROOF CONSTRUCTION 1 HR SEPARATE PERMIT APPLICATION FOR: GRADING WORK R&R, BLOCK...per electrical drawings11 11 11 11 11 Policy 2.6: SEE SHEET A0.1 & A0.2 Turf...

Last Modified: 10/20/2022

4100 Riverside Dr - Project Plans.pdf

APPROXIMATE ARCHITECTURE ASPHALT BUILT UP ROOFING BOARD BITUMINOUS BUILDING BLOCK...BLOCKING BEAM BOTTOM CATCH BASIN CAST-IN-PLACE CEILING...

Last Modified: 10/13/2022

Att1

: (1) A single person, who may be: (i) An elderly person, displaced person, di...Employmconnection was the Summer Youth Employm funded with Community Development...

Last Modified: 04/02/2026

Att1 - Housing Authority Resolution

: (1) A single person, who may be: (i) An elderly person, displaced person, di...Employmconnection was the Summer Youth Employm funded with Community Development...

Last Modified: 03/26/2026

2024 Summer Camp Schedule

Last Modified: 07/28/2025

November 3, 2020 Election Notices and Press Releases

Last Modified: 07/16/2026

Prevailing Wage Report.pdf

Indirect Costs – Number of Vendors As stated above, the Philips and Littlehate 2015

Last Modified: 05/16/2025

Soils Report.pdf

report (Section 7.17). 7.1.12 Foundations for small outlying structures, such as block...1557 (latest edition). 7.4.12 Foundations for small outlying structures, such...

Last Modified: 02/08/2023

Tree Master Plan BURBANK 1.pdf

Additionally, when a tree dies, most of the CO2 that accumulated as woody biomass

Last Modified: 04/18/2024

Tree Master Plan BURBANK 1

Additionally, when a tree dies, most of the CO2 that accumulated as woody biomass

Last Modified: 04/18/2024

Treasurer's Report June 2019.pdf

2019 245,000.00 1734 245,000.00 1.850 30 54438CRE4 5844 1 GP 15-01 (LA COMM COLL DIS

Last Modified: 03/09/2021

Treasurer's Report September 2018.pdf

2019 245,000.00 1734 245,000.00 1.850 303 54438CRE4 5844 1 GP 15-01 (LA COMM COLL DIS

Last Modified: 03/09/2021

Treasurer's Report October 2018.pdf

2,000,000.00 1794 2,000,000.00 2.280 288 54438CRE4 5844 1 GP 15-01 (LA COMM COLL DIS

Last Modified: 03/09/2021

CIP Photos

Last Modified: 04/22/2026

20210301__FinalAvionFEIR_Avion.pdf

questions on this letter, please contact Michelle Boehm, Southern California Regional Di...Heavy-duty equipment and vendor supply trucks would be...

Last Modified: 03/31/2021

20201208-Burbank-Channel-Bikeway-RFP-001.pdf

The Consultant shall prepare plans on 24” x 36” Mylar sheets with the City title block

Last Modified: 12/08/2020

20210113-la-river-bridge-rfp-001.pdf

The Consultant shall prepare plans on 24” x 36” Mylar sheets with the City title block

Last Modified: 01/13/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet