Search Results

Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara.
Search Results

Updated_Objective_Standards_Consistency_Matrix (1).pdf

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 10/29/2024

Objective_Standards_Consistency_Matrix

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 05/14/2024

CIP Updates Completed Projects

Date Construction Completion Date   Project Project Number Project Manager Scope...Project...

Last Modified: 03/03/2025

Planning Comments - Final Objective Standard Review

One of the eligibility requirements for a SB 35 project is that the project must...Project site is zoned M-1....

Last Modified: 05/06/2024

CIP Updates New Projects

Project Number Project Manager Scope Phase Project Start Date Start End Estimated...Project...

Last Modified: 03/03/2025

ApxE_Updated Geotechnical Investigation.pdf

If the California Green Building Code requirements apply to this project, the vapor...As an alternative to the clean aggregate suggested in the...

Last Modified: 07/09/2021

CIP Updates Continued Projects

Project Number Project Manager Scope Phase Project Start Date Start End Estimated...Project...

Last Modified: 03/03/2025

ATTACHMENT 14_reduced size.pdf

All construction projects must comply with requirements in CAL Green and the California...Sustainability and Green...

Last Modified: 09/16/2022

2022_PLanning _ 830 E SanJose PLans Recommended Project Plans.pdf

20089A0.1 Cover sheet A0 plans 20089A0.2 Cover sheet A0 20089A2.1 Floor Plan A2 20089A2.2 Floor Plan A2 20089A2.3 Floor Plan A2 20089A3.1 Elevations A3 20089A3.2 Elevations A3 plans ...

Last Modified: 02/17/2022

20210101_Fiscal Year 2018-2019 Consolidated Plan Annual Performance Evaluation Report.pdf

residential services on energy and water efficiency  Implement California Green...Business Improvement Districts (Property and Tourism)  Expand the growth of...

Last Modified: 05/20/2021

2025-2029 CON PLAN DRAFT.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 07/21/2025

Attachment 2 – 2025-2029 Consolidated Plan

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 05/29/2025

Attachment 2 – Annual Action Plan

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 05/29/2025

Attachment 2 – 2025-2029 Consolidated Plan.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 06/02/2025

CON PLAN FINAL.pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 06/18/2025

CON PLAN FINAL (1).pdf

Sustainability and Green Building Standards Burbank encourages environmentally...Parks and Green Spaces Access to...

Last Modified: 07/17/2025

Economic Development Dept_2022-23_Annual_Report_FINAL.pdf

buzz such as the Batman statue, the recently added Wonder Woman, and upcoming Green...RIVERSIDE DRIVE MIXED USE PROJECT 4100 W....OPENING DATE...

Last Modified: 10/16/2023

econdev_2022-23_annual_rpt_FINAL.pdf

buzz such as the Batman statue, the recently added Wonder Woman, and upcoming Green...RIVERSIDE DRIVE MIXED USE PROJECT 4100 W....OPENING DATE...

Last Modified: 01/25/2024

526 S Sunset Cyn Dr - Decision Letter

TITLE: Project No. 23-0005188 – Hillside Development Permit PROJECT ADDRESS:...The project had been previously...

Last Modified: 02/16/2024

840 E Verdugo - Plans

HEIGHT, WITH GREEN BOARD OR TWO LAYERS OF 15 LBS MOISTURE BARRIER W/ MTL....USE 5/8" GYPSUM GREEN BOARD IN @ WET (TUB/SHOWER, 3....USE 5/8" GYPSUM...

Last Modified: 08/18/2022

202101_Planning_HistoryofBurbankColoringBo.pdf

BO BS MAIL BURBANK CALIFORNIA CITY HALL DOWNTOWN ENVIRONMENT GREEN HISTORICAL

Last Modified: 06/02/2021

3333 Brace Canyon Road - HDP - Approval Letter

91504 VIA EMAIL: [email protected] RE: Notice of Decision – Approval Project...Electrical Code, California Mechanical Code, California Plumbing Code, ...

Last Modified: 08/07/2024

Virtual Community Meeting: East Olive Avenue Paving Restriping

img alt="" src="/documents/20124/0/20231120-East+Olive+Avenue+Paving+Restriping+ Project ...The purpose of this restriping project is to enhance roadway safety for all...

Last Modified: 11/20/2023

In-person Community Meeting: East Olive Avenue Paving Restriping

img alt="" src="/documents/20124/0/20231120-East+Olive+Avenue+Paving+Restriping+ Project ...The purpose of this restriping project is to enhance roadway safety for all...

Last Modified: 11/20/2023

202107_2311_N_Hollywood_Way_ApxC1_HistoricResourcesAssessment_reduced.pdf

Green Building Council and the Business Council on Climate Change (BC3)....The Van Nuys News and Valley Green Sheet, August 30, 1962 Prosser,...

Last Modified: 07/09/2021

20220915-Parking FAQ's (22-23) - final-001.pdf

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 09/15/2022

20220811-Parking-FAQ's-(22-23)-final-001.pdf

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 08/11/2022

20220815-Parking FAQ's (22-23) - final-001.pdf

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 08/14/2022

20220915-Parking FAQs (22-23) - final-rev

may be displayed on any of the Time Limited streets in Zone A (streets shown in green...TIME LIMIT” PERMITS (1-Hour, or 2-hour parking restrictions, Except by Permit;...

Last Modified: 07/01/2024

719 Wilson Ct - Approval Letter - FINAL

TITLE: Project No. 23-0004879 – Hillside Development Permit PROJECT ADDRESS:...Electrical Code, California Mechanical Code, California Plumbing...

Last Modified: 02/15/2024

Con Plan -IDIS FINAL.pdf

The city enforces Low Impact Development and Green-streets policies....Investments in green infrastructure like rain gardens and permeable...

Last Modified: 09/15/2025

Con Plan -IDIS FINAL (1).pdf

The city enforces Low Impact Development and Green-streets policies....Investments in green infrastructure like rain gardens and permeable...

Last Modified: 04/15/2026

Leland Way Streetscape Project

Last Modified: 05/20/2026

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

GREEN NOTES A....SEE GREEN NOTES THIS SHEET TYPE TYPE E EGRESS WINDOW EVSE T TEMPERED WINDOW...GREEN NOTES A.

Last Modified: 05/30/2024

ATTACHMENT 3 (2).pdf

Green Building Council website is also provided....All construction projects must comply with requirements in CAL Green...

Last Modified: 09/16/2022

Adopted Burbank Housing Element_clean-for printing.pdf

Green Building Council website is also provided....All construction projects must comply with requirements in CAL...

Last Modified: 06/29/2023

Adopted Burbank Housing Element.pdf

Green Building Council website is also provided....All construction projects must comply with requirements in CAL...

Last Modified: 06/29/2023

2022_Adopted_Burbank Housing_Element_clean.pdf

Green Building Council website is also provided....All construction projects must comply with requirements in CAL Green...

Last Modified: 10/21/2022

CIP Projects in Construction

Last Modified: 03/25/2026

1036 Sherlock Dr _Decision Letter_Final

TITLE: Project No. 24-0000845 – Hillside Development Permit PROJECT ADDRESS:...Electrical Code, California Mechanical Code, California Plumbing...

Last Modified: 07/12/2024

Historic Preservation Program

Last Modified: 09/17/2025

Attachment 3 - Planning Commission Resolution No. 3472 dated July 22, 2024

Main Street, Burbank, CA 91506 (Project Site)...., and to consider and act on the underlying Project application....Electrical Code, California...

Last Modified: 10/18/2024

Burbank Private Hauler Contract Application

 Three-container waste collection: source-separated recycling, organics (green

Last Modified: 05/22/2026

Attachment 2 - Public Notice

from the City of Los Angeles for sewage treatment services, capital improvement projects...providing comprehensive refuse services that include household trash disposal,...

Last Modified: 05/08/2025

Attachment 1 - Resolution - ALL EXHIBITS

(BMC Section 9-3-414 and the California Green Building Code.)...HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305...

Last Modified: 11/19/2024

Attachment 1 - Resolution - ALL EXHIBITS compressed

(BMC Section 9-3-414 and the California Green Building Code.)...HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305...

Last Modified: 11/19/2024

Attachment 1 - Resolution - ALL EXHIBITS compressed.pdf

(BMC Section 9-3-414 and the California Green Building Code.)...HEIGHTS SURROUNDING BOB HOPE AIRPORT Not Applicable 10-1-1305...

Last Modified: 11/21/2024

2025 BPAP Plan Check Correction List

California Wildland-Urban Interface • 2025 California Fire Code • 2025 California Green...humidity control in accordance with the California Mechanical Code and the...

Last Modified: 03/26/2026

Caltrans Project Update

Caltrans project update Road Construction.png Burbank, CA (January 26,

Last Modified: 03/11/2021

Attachment C - Objective Standards Consistency Matrix.pdf 1

YES, SUBJECT TO CONDITIONS OF PROJECT APPROVAL The project proposes 23 units...YES, SUBJECT TO CONDITIONS OF ...

Last Modified: 06/26/2023

Attachment C - Objective Standards Consistency Matrix.pdf

YES, SUBJECT TO CONDITIONS OF PROJECT APPROVAL The project proposes 23 units...YES, SUBJECT TO CONDITIONS OF ...

Last Modified: 05/08/2023

Completed CIP Projects

Last Modified: 07/28/2025

Updating GGRP Project

Last Modified: 09/17/2025

2. Police Commission_Redacted

Project budget, planning and oversight....Management AT&T Certification 2018: IP Networking AT&T Certification 2011: Six Sigma Green...I am also an...

Last Modified: 06/12/2025

UpperLARiver_Draft_Appendix6.pdf

Screened potential green street opportunities Jurisdiction  ...

Last Modified: 03/25/2021

1521 E Alameda - Decision Letter - 251016.pdf

Via email: [email protected] RE: Determination of Application: Approved Project...TITLE: Project No. 25-0001158 - Minor Fence Exception ...

Last Modified: 10/16/2025

719 Wilson Ct_HDP_Revised Plans 121423

Information N/S PROJECT INFO ARCHITECTURAL DATE OF ISSUE A1.0 Cover, Project...Information,Site Plan A1.1 Green...

Last Modified: 01/31/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet