Search Results

Showing results for "dWA 0852 2611 9277 [[GLORION]] Pemborong Plafon PVC Hitam Polos Murah Tanah Abang Jakarta Pusat"

No results were found that matched the keywords: dWA 0852 2611 9277 [[GLORION]] Pemborong Plafon PVC Hitam Polos Murah Tanah Abang Jakarta Pusat.
Search Results

03. BCEA MOU 2026 - 2027 - FOR WEBSITE - FINAL_V2.0 (3).pdf

COMMUNICATION OPERATORS The City shall provide department issued polo shirts and...Replacement polo shirts, jackets and sweaters shall be...

Last Modified: 08/04/2026

2023.10.19 - BCEA MOU 2022 - 2024 - FINAL.pdf

COMMUNICATION OPERATORS The City shall provide department issued polo shirts and...Replacement polo shirts, jackets and sweaters shall be...

Last Modified: 10/19/2023

Burbank Officials

Last Modified: 06/08/2026

Appendix H - Hydrology Study.pdf

The casing consisted of a slotted PVC pipe within the lower 30 feet of the borehole..., and solid PVC pipe to the top of the borehole.

Last Modified: 01/07/2025

840 E Verdugo - Plans

CONNECTED TO GUTTER AND 3"Ø PVC PIPE INSTALLED INSIDE THE WALLS. (OPTION) 3....@ SLOPE IN 18" OF COARSE PROVIDE BELOW GRADE WATER BARRIER ALONG WITH MINI. 4"...

Last Modified: 08/18/2022

Sample Project 2016.pdf

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 03/25/2021

Soft-Story Affected Buildings List

BLK1021 W CLARK AVE 91506-2006 5 OR MORE UNITS/4 STRY OR LESS 1961 2479-004-013 2611...W CLARK AVE LOT 34 2611 W CLARK AVE 91505-3263 5 OR MORE...

Last Modified: 04/02/2024

2026 JUN ISSUED

ROOFING AT FLAT PART ONLY & INSTALL NEW 1/4 INCH THICK DENS DECK & NEW 72 MIL THICK PVC...RE-ROOF (14,900 SF): REMOVE (E) ROOFING, INSTALL NEW 1/4" DENS DECK AND NEW 72 ...

Last Modified: 07/01/2026

420 S Sunset Canyon Rd - Approved Plans

PVC SCH 40.

Last Modified: 08/03/2026

DEIR Appendix K (LaTerra).pdf

I 2611 ~ i 27 : I 281, II I. II accumulate by In Lieu Storage....I " ': 22 ii 23 L 24 II il 251 2611 :, 27 " 2sl!

Last Modified: 05/04/2021

4100 Riverside Dr - Project Plans.pdf

BELOW POOL DECK AT 3RD FLOOR LANDSCAPED OPEN SPACE AT 2ND FLOOR SINGLE PLY PVC...SINGLE PLY PVC MEMBRANE ROOF, TYP. SINGLE PLY...

Last Modified: 10/13/2022

Aquatics

Burbank Aquatics includes lap swim, recreational swim, swim teams, learn-to-swim classes, aquatic fitness classes and pool rentals.

Last Modified: 09/16/2026

Appendix G - Geotechnical Report.pdf

The casing consisted of a slotted PVC pipe within the lower 30 feet of the borehole..., and solid PVC pipe to the top of the borehole.

Last Modified: 01/07/2025

UpperLARiver_Draft_Appendix4b.pdf

o PVC liners used for the lining of bioretention should meet the requirements of...The PVC liner should resist ultraviolet and shall be...

Last Modified: 03/25/2021

2021_Planning_1200 Hollywood Way Project Plans.pdf

AutoCAD SHX Text 1 AutoCAD SHX Text INSTALL SDR-26 PVC SANITARY SEWER SERVICE PER

Last Modified: 07/28/2021

5. Community Development Goals Committee_Redacted

• TPO - Training • GAF - Training • TPO - Training • DuroLast - Training • PVC

Last Modified: 06/13/2024

20210101_3209_N_Castleman_Lane_ProjectPlans.pdf

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 04/13/2021

2026.07.27 Pet. Metro's Shahamiri Declaration ISO Motion for Reconsideration

Gymnastics DTLAArena Triathlon Venice Beach Volleyball Honda Center ðater Polo...Theater Sailing (Dinghy, Skiff & Multihull) Artistic Swimming Climbing Water...

Last Modified: 08/06/2026

Decision Letter - 2710 Winona Ave - AUP - 2.28.26 (all attachments)

(TYP TC-ER) REGULATORY COMPLIANCE/CERTIFICATIONS ISO 9001:2015 CROSS-SECTION PVC...THWN-2 COPPER CONDUCTOR (QTY=3) 8 AWG 19 STRAND TINNED COPPER CONDUCTOR BLACK...

Last Modified: 03/02/2026

2025-08-08_Full Set (Arch+Civil+Land) - Copy

RAIN SENSORRSD C IRRIGATION PIPING 1 14" IRRIGATION PRESSURE MAINLINE SCH. 40 PVC...- BURY MIN. 18" BELOW GRADE WITH SCH. 80 FITTINGS NON-PRESSURE LATERAL SCH. 40...

Last Modified: 12/02/2025

3252 N Frederic St 1-29-22.pdf

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 02/08/2022

UpperLARiver_Draft_Appendix4a.pdf

34.0096485 ‐118.3283460 Los Angeles 5014024900 3.69 16.86 L A UNIFIED SCHOOL DIST 2611...33.9959257 ‐118.3219655 Los Angeles 5014024901 0.28 16.86 L A UNIFIED SCHOOL DIST...

Last Modified: 03/25/2021

3209 Castleman Ln Approved Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 12/14/2022

1821 N Bel Aire Dr_Planning Approved Plans

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/02/2026

1821 N Bel Aire Dr_Plans

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 05/06/2026

2022 BPAP Plan Check Correction List

conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 11/15/2024

20210101_1258_E_Elmwood_ProjectPlans.pdf

PER SQUARE INCH PSL PARALLEL STRAND LUMBER PT POINT P-T POST TENSION PTD PAINTED PVC

Last Modified: 04/13/2021

ApxE_Updated Geotechnical Investigation.pdf

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or other...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET...

Last Modified: 07/09/2021

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

PVC. P.L. P.S.I. PAIR PLGL. PLAS. LAM. PLAS. PLWD. PLMB. PL. PT. P....TO PROPOSED RAIN WATER HARVESTING TANKS 1 CLASS "A" COMPOSITION HIGH-QUALITY,...

Last Modified: 05/30/2024

2026.07.27 Pet. Metro's Middleton Declaration ISO RJN

Marathon Swimming 2 2 1 910 910 910 910 120 120 120 120 Long Beach Waterfront Water Polo...Long Beach Arena Long Beach Waterfront Long Beach - BMX Long Beach - Water...

Last Modified: 08/06/2026

2025 SEPT ISSUED

INSTALL PVC ROOF. TOTAL OF 5000 SF....Maintenance $307,000.00Valuation: GO OVER (E) 1-LAYER ROOF WITH ANOTHER LAYER SARNAFIL PVC

Last Modified: 10/06/2025

Signed NOP final

" 2" 10" 2" 8" VCP 8" V C P 8" V C P 24" HDPE 18 " H D PE 6" PVC

Last Modified: 03/06/2025

Signed NOP final

" 2" 10" 2" 8" VCP 8" V C P 8" V C P 24" HDPE 18 " H D PE 6" PVC

Last Modified: 03/07/2025

2025 BPAP Plan Check Correction List

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 03/26/2026

2025 MAR ISSUED

INSTALL NEW 80 MIL PVC SARNAIL SINGLE PLY ROOFING SYSTEM, FULLY ADHERED....INSTALL NEW 80 MIL PVC SARNAFIL SINGLE-PLY ROOFING SYSTEM, FULLY ADHERED.

Last Modified: 04/04/2025

2026.06.18 Pet. Metro's McKenna Declaration ISO PI Motion.pdf

INSTALL NEW PVC CONDUIT(S) AT CURRENT BWP STANDARD, 24"BELOW GRADE....INSTALL NEW PVC CONDUIT AT CURRENT BWP STANDARD, 24"BELOW GRADE.

Last Modified: 06/22/2026

250220_City of Burbank - Home Again Los Angeles

USE PVC FOR BELOW GRADE....USE PVC FOR BELOW GRADE..../S DR 11 C PVC COPPER D WV ABS O R PVC...

Last Modified: 02/25/2025

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 04/12/2024

2025 Residential Correction List (1)

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 09/08/2026

DEIR Appendix G-4A (LaTerra).pdf

VOLUME FLUID USED 10/10/2017 81' bgs 3/4" PVC 0.020" Horizontal 2" N/A N/A...VOLUME FLUID USED 10/10/2017 53' bgs 3/4" PVC 0.020"...

Last Modified: 05/04/2021

Updated_Preliminary_Low_Impact_Development_Report.pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 10/29/2024

Preliminary_Low_Impact_Development_Report

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 05/14/2024

Attachment J - Preliminary Low Impact Development Plan (LID).pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 05/11/2023

Attachment J - Preliminary Low Impact Development Plan (LID).pdf 1

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 06/26/2023

Preliminary_LID_Report.pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 01/11/2024

Appendix F_HazMat Studies_Part 2.pdf

One- inch diameter polyvinyl chloride (PVC) casing was used as a guide for the tubing...approximately one- foot long sand pack around the polypropylene filter, at which...

Last Modified: 12/13/2024

Project Plans - 2925 N Lamer St

PVC SCH 40.

Last Modified: 02/07/2025

2925 N Lamer St_Plans_c4_1.27.25

PVC SCH 40.

Last Modified: 03/04/2025

2026 JAN ISSUED

2026 Repair & Maintenance Issued Date:Permit Number:Permit Type: BS2600102 2611

Last Modified: 02/06/2026

Soils Report.pdf (1)

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET ...

Last Modified: 06/23/2023

Soils Report.pdf

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET ...

Last Modified: 02/08/2023

2026.08.11 City's of Dec. of C. Parker iso Opp to Motion for Reconsideration

Theater Sailing (Dinghy, Skiff & Multihull) Artistic Swimming Climbing Water Polo

Last Modified: 08/12/2026

20210507_630_Parish Pl_Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 05/07/2021

20210519_504_Hampton_Road.pdf

BY RIGID CONDUIT, INTERMEDIATE CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 05/18/2021

2021_Planning_630_S_Parish_Pl_Approved Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 06/28/2021

Plans formal submittal #2_Part3

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

Plans formal submittal #2_Part3 (1).pdf

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

1. Police Commission_Redacted.pdf

TCP/IP, IPX, AppleTalk, Ethernet, FE, GE, IEEE 802.1Q, VRRP/HSRP, SIP, POS, ATM PVC

Last Modified: 06/15/2023

UpperLARiver_Draft_Appendix7.pdf

maintenance (MH), including Shoring, per Plan $ 36,800.00 1 17 Install 12" ø PVC...than 0.5 in/hr and should meet the following criteria:  Minimum 4-inch slotted,...

Last Modified: 03/25/2021

UpperLARiver_Draft_Appendix5.pdf

Inlet Pipe Diameter/Type (i.e. 8” / PVC): ___________________________________...Inlet Pipe Invert Elevation if applicable: 13a Inlet Pipe DiameterType ie 8 ...

Last Modified: 03/25/2021

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet