Search Results

Showing results for "dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar"

No results were found that matched the keywords: dWA 0859 3970 0884 [[HATIGA]] Kontraktor Solar Water Heater Karanganyar Karanganyar.
Search Results

WMR 9.25.26.pdf

Riverside Drive but let them know the heaters on the roof were still installed...Rendon updated the Commission that the unpermitted canopy, ceramic planters, and...

Last Modified: 09/25/2026

Press Release: Burbank Water and Power Electrical Substation Fire Quickly Extinguished

BWP.png BURBANK, CA (June 30, 2023) — Fire crews responded to the scene of a Burbank Water...Burbank Water and Power Media Contact  Jeannine...

Last Modified: 07/27/2023

2026_Burbank_PASS_ Eligibility List.pdf

$23 78% $5 Adopted Fees Subsidy Amount Fee with PASS Water...Heater Permit & Permit Issuance Fee PLUMBING PERMITS - (818) 238-5220 $165.92 70%

Last Modified: 08/17/2026

Public Hearing Memo - Urban Water Management Plant

The following public hearing report is being distributed to City Council in advance. This item is scheduled for June 16, 2026 Please retain this copy as it will not be distributed...

Last Modified: 06/04/2026

Public Hearing Memo - Sustainable Water Use Ordinance

The following public hearing report is being distributed to City Council in advance. This item is scheduled for June 30, 2026 Please retain this copy, as it will not be distributed...

Last Modified: 06/18/2026

ADVISORY: Simulated Police & Fire Training at Burbank Water and Power April 10th

Emergency Management will be conducting a scheduled live training at the Burbank Water...Emergency Management will be conducting a scheduled live training at the Burbank...

Last Modified: 04/10/2024

PASSEligibilityList.pdf

Adopted Fees Subsidy Amount Fee with PASS PLUMBING PERMITS - (818) 238-5220 Water...Heater Permit and Permit Issuance Fee $92.85 70% $27.86 ...

Last Modified: 12/04/2024

PASSEligibilityList (1).pdf

Adopted Fees Subsidy Amount Fee with PASS PLUMBING PERMITS - (818) 238-5220 Water...Heater Permit and Permit Issuance Fee $92.85 70% $27.86 ...

Last Modified: 02/12/2026

1719 San Fernando Rd - Plans

WATER HEATER WATER HEATER, GAS AMERICAN APPLIANCE MODEL #GFK454T CAPACITY: 50.00...PER ...

Last Modified: 09/09/2022

Attachment 8 - Budget Public Hearing 6.13.23.pdf

292,901 23727 Capon Cap Bank Control Upgrade PS 100,000 100,000 23803 Citywide Solar...22956 ESSN Ntwk Infstr Rplcmt PS 1,504,347 2,300,000 3,804,347 24410 EcoCampus...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (1).pdf

292,901 23727 Capon Cap Bank Control Upgrade PS 100,000 100,000 23803 Citywide Solar...22956 ESSN Ntwk Infstr Rplcmt PS 1,504,347 2,300,000 3,804,347 24410 EcoCampus...

Last Modified: 06/02/2023

Attachment 8 - Budget Public Hearing 6.13.23 (2).pdf

292,901 23727 Capon Cap Bank Control Upgrade PS 100,000 100,000 23803 Citywide Solar...22956 ESSN Ntwk Infstr Rplcmt PS 1,504,347 2,300,000 3,804,347 24410 EcoCampus...

Last Modified: 06/02/2023

Project Plans 1

WATER HEATER WATER HEATER, GAS AMERICAN APPLIANCE MODEL #GFK454T CAPACITY: 50.00...PER FLUSH) ...

Last Modified: 09/28/2026

Combined Final Submission.pdf

WATER SHALL BE PROVIDED ON THE SITE AND USED TO CONTROL DUST. 6....PROVIDE ULTRA-FLUSH WATER CLOSETS FOR ALL NEW...

Last Modified: 11/08/2022

Project Plans

UP 6" HIGH SMOOTH WASHABLE S.GLOSS ENAMEL LIGHT IN COLOR COLD WATER HOT WATER...AutoCAD SHX Text WATER...

Last Modified: 06/17/2024

20210519_3329_Durham_Plans.pdf

IN SUCH POOL OR OTHER BODY OF WATER OF WATER CLEAN AND OF REASONABLE CLARITY....PETAIR WHISPERFLO (BUSTER PUMP) AutoCAD SHX Text...

Last Modified: 05/19/2021

Planning_2021_Burbank2035 DEIR.pdf

campaign to advertise available solar water heater (SWH) rebates and incentives...• Action E-2.1B: Adopt an ordinance...

Last Modified: 12/02/2021

2021_Planning_ Burbank2035 Draft Environmental Impact Report.pdf

campaign to advertise available solar water heater (SWH) rebates and incentives...• Action E-2.1B: Adopt an ordinance...

Last Modified: 07/29/2021

Project Plans- 2118 Hilton

CRRC PRODUCT ID # 1214-0011 , SOLAR REFLECTANCE 0.23 , THERMAL EMITTANCE 0.91 , SRI...HEAT PUMP SPACE HEATER READY (150.0(T)): IF NATURAL OR...

Last Modified: 06/10/2026

2026 FEB FINALED

HEATER, 30 RECEPTACLES, 25 LIGHTS, (1) SUBPANEL....HEATER, 20 RECEPTACLES, 10 LIGHTS, (1) SUBPANEL....REPLACE 200 SF OF DRYWALL IN FAMILY ROOM DUE...

Last Modified: 03/03/2026

California Arts League - Water

California Art League Show - Water June 6 - 26, 2024</strong

Last Modified: 08/01/2024

202101_Plans_1023 North Cordova St. Plans - 02 23 2021.pdf

FT. 19' - 3" (E)TANKLESS WATER HEATER PROPOSED SECOND FLOOR OPEN BALCONY...INSULATION BLANKETS WITH A MINIMUM RATING OF R-12 INSTALLED ON ...

Last Modified: 06/15/2021

Att2 - Draft Ordinance

The Project shall install solar panels on-site capable of generating 11% of the...Emergency backup power may be provided through solar and battery...

Last Modified: 11/05/2026

2026 JAN FINALED

RELOCATE POWDER ROOM, NEW BATHROOM, REMODEL (1) BATHROOM & KITCHEN, REPLACE WATER...HEATER, (E) HVAC TO REMAIN $65,000.00Valuation: Issued...

Last Modified: 02/06/2026

3001 SB35 - Plans.pdf

required Solar required 15% of roof area SOLAR PANEL 1110 S.FSOLAR PANEL 1110 S.F...Electric Water...

Last Modified: 06/26/2023

2025 JUN SPV

Issued Final Solar Panels - Install 9 panel/3.65 kW roof mounted solar panels 06...solar panels 06/10/2025 107 ...

Last Modified: 07/01/2025

840 E Verdugo - Plans

HOT WATER HEATER TO BE STRAPPED TIGHT AT TOP AND BOTTOM FOR THE EARTHQUAKE SAFETY...Water heater...

Last Modified: 08/18/2022

25-4,034 Adopting by Reference 2025 CA Building Standards Code

Any solar collector or other solar energy device whose primary purpose is to provide...Solar Reflective Index Alternative...

Last Modified: 11/24/2025

2025 JUL SPV

Burbank, Calif. 91502 SOLAR PHOTOVOLTAIC SYSTEMS Page 1 of 5 Condominium Applied...Issued Final BLDG 10 UNIT 39: INSTALL 9 PANELS- 3.65 KW ROOFMOUNT...

Last Modified: 08/11/2025

2025 MAY SPV

Burbank, Calif. 91502 SOLAR PHOTOVOLTAIC SYSTEMS Page 1 of 6 Condominium Applied...151 Bridle Dr - Pickwick Townhome Unit 29: Install 9 modules, 3.645 kW Roof mount...

Last Modified: 06/05/2025

20130213_Chapter 6 - Open Space and Conservation.pdf

Policy 10.7  Encourage the use of solar energy systems in homes and commercial businesses...  potable water, ...

Last Modified: 11/17/2021

Craft Faire at Burbank Water and Power

CAMPUS MINI TOURS See our campus conservation projects, including solar

Last Modified: 09/29/2026

_Burbank_2500 N Hollywood Way EIR_Public Review Draft.pdf

TO R S AREA FOR SOLAR COLLECTORS AREA FOR SOLAR COLLECTORS AREA FOR SOLAR COLLECTORSAREA...• Rule 1146.2 – Emissions of...

Last Modified: 12/13/2024

Att13 - Draft Environmental Impact Report

TO R S AREA FOR SOLAR COLLECTORS AREA FOR SOLAR COLLECTORS AREA FOR SOLAR COLLECTORSAREA...• Rule 1146.2 – Emissions of...

Last Modified: 11/05/2026

2814 Empire Plans.pdf

Electric Water heater....Electric Water heater....Electric Water...

Last Modified: 10/13/2022

Attachment 4 (3).pdf

Electric Water heater....Electric Water heater....Electric Water...

Last Modified: 10/20/2022

Attachment 4 (4).pdf

Electric Water heater....Electric Water heater....Electric Water...

Last Modified: 10/20/2022

Attachment 4..pdf

Electric Water heater....Electric Water heater....Electric Water...

Last Modified: 10/27/2022

2025 OCT SPV

Burbank, Calif. 91502 SOLAR PHOTOVOLTAIC SYSTEMS Page 1 of 9 Condominium Applied...Issued Final INSTALL 9 PANELS, 3.65 KW ROOF MOUNT SOLAR (unit...

Last Modified: 11/03/2025

325 N First St - Final Plans

HEATER PROPOSED PONY WALL WALL LEGEND PROPOSED WALL TUB TUB TUB MEP NOTES...2" PIPE COLD WATER 2" PIPE HOT WATER...

Last Modified: 03/19/2024

2019 WFPP (LARUCP).pdf

Method WSP 4 5 7.5 10 12.5 GARAGE FLOORIN G AR AG E WATER HEATERS (CPC...SPECS 4" 24 " M AX NOTE: NO GAS-FIRED...

Last Modified: 03/25/2021

ATTACHMENT 11.pdf

Achievement of the RPS includes expansion of local solar power generation, energy... Solar Over-Generation....Work to mitigate the impact of...

Last Modified: 09/16/2022

20130213_Chapter 2 - Air Quality and Climate Change.pdf

Solar  radiation  enters  the  earth’s  atmosphere,  where  a  portion  is  absorbed...Most  incoming  solar ...

Last Modified: 11/17/2021

Attachment 8 - CIP Projects by Category

184,501,606 25315 CSB Fountain Repair PW 100,000 500,000 600,000 25332 Beam Solar...PW 15,650,000 800,000 500,000 500,000 500,000 500,000 500,000 18,950,000 19261...

Last Modified: 05/21/2026

ADU Handbook Update.pdf

L) Solar System Requirements • Are solar systems required for newly constructed...the local water or sewer service...

Last Modified: 07/30/2024

3915 Heffron Drive - DR Decision Letter - 11.09.2026

The parapet will conceal proposed solar equipment....Entries and Porches: • All unit and project entries must have solar equipment...and...

Last Modified: 11/16/2026

536 Plan Set.pdf

DIVERSION OF CONSTRUCTION & DEMOLITION DEBRIS STORM WATER MANAGMENT: STORM WATER...WATER SHALL BE PROVIDED ON THE SITE...

Last Modified: 11/08/2022

5-3 - PH Attachment 6

City buildings and properties: ○ Must have all available roof space covered in solar...be retrofitted to use zero methane / natural gas for heating, cooking, heating...

Last Modified: 04/21/2022

Attachment 6 - Sustainable Commissions Letter to City Council.pdf

City buildings and properties: ○ Must have all available roof space covered in solar...be retrofitted to use zero methane / natural gas for heating, cooking, heating...

Last Modified: 04/21/2022

2500 NHW_Proposed Plans.pdf

AREA FOR SOLAR COLLECTORS AREA FOR SOLAR COLLECTORS A R E A F O R S O...L A R C O L L E C T O R S AREA FOR...

Last Modified: 01/09/2025

Attachment 4.pdf

AREA FOR SOLAR COLLECTORSAREA FOR SOLAR COLLECTORS AR EA F O R S O LA R C...O LL EC TO R S AREA FOR SOLAR...

Last Modified: 09/22/2026

Attachment 4.pdf

AREA FOR SOLAR COLLECTORSAREA FOR SOLAR COLLECTORS AR EA F O R S O LA R C...O LL EC TO R S AREA FOR SOLAR...

Last Modified: 09/22/2026

Att5 - Project Plans

AREA FOR SOLAR COLLECTORSAREA FOR SOLAR COLLECTORS AR EA F O R S O LA R C...O LL EC TO R S AREA FOR SOLAR...

Last Modified: 11/05/2026

Burbank Water & Power

Last Modified: 10/26/2021

2025 MAR SPV

Burbank, Calif. 91502 SOLAR PHOTOVOLTAIC SYSTEMS Page 1 of 3 Condominium Applied...Issued Final 121 Bridle Ln Pickwick Townhome Units 14: Install 3.65 kW Roof mount...

Last Modified: 04/04/2025

FY 2026-27 Adopted CIP Book FINAL

The project will place two solar-powered vehicle chargers at a City facility for...This will be an ongoing project to develop more City solar...

Last Modified: 09/10/2026

ApxF_PaleontologicalResourcesAssessmentReport.pdf

Relevant Experience ReneSola Gentry Solar Project, Paleontological Resource Assessment...Mojave Solar Project Cultural Services; San Bernardino...

Last Modified: 07/09/2021

20220901-FY-2022-23-Adopted-CIP

This will be an ongoing project to develop more City solar resources....to meter the output of the solar generation....Ward System Hardware...

Last Modified: 09/01/2022

2025 SEPT FINALED

ft wall-mounted louvered pergola (Pergolux Sund ream) with included lights and heater...REPLACE 1 SUBPANEL, DISHWASHER, TANKLESS WATER...

Last Modified: 10/06/2025

Att9 - Los Angeles County Airport Land Use Plan Consistency Determination

AREA FOR SOLAR COLLECTORSAREA FOR SOLAR COLLECTORS AR EA F O R S O LA R C...O LL EC TO R S AREA FOR SOLAR...

Last Modified: 11/05/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet