Showing results for "dWA 0859 3970 0884 [[HATIGA]] Order Aspal Industri Berkualitas Bayat Klaten"
OF DESIGN INTENT PRIOR TO SUBMITTING FOR PERMIT, INITIATION OF WORK OR ORDERING...FAILURE TO PROVIDE REQUIRED INSPECTION REPORTS WILL RESULT IN A "STOP WORK...
Last Modified: 03/04/2025
demolition work beyond that shown on the approved plans may result in a Stop Work Order...In order to manage storm water drainage during...
Last Modified: 01/31/2024
ALL COMMERCIAL AND INDUSTRIAL REFUSE BINS SHALL BE EQUIPPED WITH NONMETALLIC LIDS...ALL FIXTURES SHALL BE ORDERED WITH THE APPROPRIATE BALLASTS...
Last Modified: 02/12/2024
Notwithstanding, applicability of AB 2588 is limited to commercial and industrial...Task Order No. 61. 31. United States Environmental...
Last Modified: 05/04/2021
Last Modified: 09/17/2025
understanding of the City’s internal control over compliance relevant to the audit in order
Last Modified: 04/05/2023
has estimated the historically highest groundwater level at the site was on the order
Last Modified: 07/11/2023
In order to determine fire flow requirements for this building, the following information
Last Modified: 07/20/2021
Adoption ofa site-based waiting list would nol violate any cout order or settlement
Last Modified: 06/23/2026
Last Modified: 06/25/2026
Adoption ofa site-based waiting list would not violate any coun order or settlement
Last Modified: 08/31/2026
In order to move forward with enforcement efforts and implementation of new ordinances
Last Modified: 04/15/2021
Last Modified: 09/17/2026
Last Modified: 10/12/2026
ELECTRIC ACCESSORY DWELLING UNITS (DUPLEX), TOTAL 676 SF $150,000.00Valuation: Industrial
Last Modified: 06/05/2025
Use in Drainage Area: Acres Residential Land Use in Drainage Area: Acres Industrial
Last Modified: 05/28/2026
Last Modified: 07/17/2026
Last Modified: 05/22/2026
Showing 2,081 to 2,100 of 2,378 entries.