Search Results

Showing results for "dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta"

No results were found that matched the keywords: dWA 0812 2782 5310 [[PANDAWA]] Biaya Pasang Paving Beton K175 Pasar Kliwon Surakarta.
Search Results

East Olive Avenue Paving Restriping Project Information

News- Community Dev.png As part of the City of Burbank’s Street Paving Program, the

Last Modified: 12/04/2023

Notice of Paving on Glenoaks Blvd from Reese Pl to Harvard Rd

During paving operations, there will be temporary lane closures and intermittent...ILB will be paving sections of Glenoaks Blvd, from...

Last Modified: 09/17/2024

DEIR Appendix G-4A (LaTerra).pdf

-10-0812-3 10/10/17 15:40 4 Solid NP-4-10 17-10-0812-4 10/11/17 09:05 4 Solid NP...-4-18 17-10-0812-5 10/11/17 09:35 4...

Last Modified: 05/04/2021

SAS_Bill_of_Rights_Spanish

Pedirle al agente del orden público el número de caso y cómo averiguar lo que va a pasar...Pedirle al agente del orden público el número de caso y cómo averiguar lo que va...

Last Modified: 08/19/2025

SAS_Bill_of_Rights_Spanish_compressed.pdf

Pedirle al agente del orden público el número de caso y cómo averiguar lo que va a pasar...Pedirle al agente del orden público el número de caso y cómo averiguar lo que va...

Last Modified: 09/04/2025

Virtual Community Meeting: East Olive Avenue Paving Restriping

As part of the City of Burbank’s Street Paving

Last Modified: 11/20/2023

In-person Community Meeting: East Olive Avenue Paving Restriping

  As part of the City of Burbank’s Street Paving

Last Modified: 11/20/2023

[UPDATE] Street Re-paving and Partial Street Closures in the Media District June

Street re-paving and partial street closures in the Media District have...Road Construction.png *UPDATE 6/12/24: Please be advised the street...

Last Modified: 06/18/2024

[UPDATE] Street Re-paving and Partial Street Closures in the Media District June

NOTICE: Be advised of street re-paving in the Media District from June...Road Construction.png *UPDATE 6/12/24: Please be advised the street...

Last Modified: 06/18/2024

C1 Produce- Spanish.pdf

Evite pasar largos períodos sin comer, ya que esto puede resultar en nivel bajo

Last Modified: 10/31/2023

Notice of Paving on Glenoaks Blvd from Harvard Rd to Verdugo Ave, and First St and

Road Construction.png Update 11/6/24: Due to the high wind advisory, paving work...ILB will be paving sections of Glenoaks Blvd from Harvard Rd to...

Last Modified: 11/11/2024

Three Local Ballot Measures_Spanish

Elecciones del Concejo por Distrito pregunta a los votantes si Burbank debería pasar

Last Modified: 09/15/2026

UPDATED Notice of Paving on Glenoaks Blvd from Harvard Rd to Verdugo Ave, and First

Road Construction.png Update 11/6/24: Due to the high wind advisory, paving work...ILB will be paving sections of Glenoaks Blvd from Harvard Rd to...

Last Modified: 11/11/2024

Business License

Last Modified: 06/25/2026

Citywide Annual Local and Residential Street Rehabilitation Program Update

Project Update (January 2026) New asphalt paving operations are tentatively...News- Public Works.png Project Update (January 2026): New asphalt...

Last Modified: 12/17/2025

20210301_AppendixDEnergyCalculation_Avion.pdf

1 Pavers 2 10 130 0.42 245 267,540 Paving-Phase 1 Paving Equipment 5 10...2 Pavers 1 10 130 0.42 49 26,754 ...

Last Modified: 03/31/2021

Appendix C_AQ_Energy_GHG Data.pdf

Paving (2026) - Unmitigated 3.10. Paving (2026) - Mitigated 3.11....Construction Paving ...

Last Modified: 12/13/2024

20210301_AppendixBAQTechReport_Avion.pdf

Paving-Phase 2 Paving Equipment 1 10.00 132 0.36 Paving-Phase 2 Pavers 1 10.00...

Last Modified: 03/31/2021

Street Closure from Orange Grove to Olive

Grove to Olive Burbank, CA (September 27, 2023) – Please note that Paveco (BWP paving...subcontractor) will re-pave the new recycled water line...

Last Modified: 09/27/2023

LADWP River Supply Conduit Project Update

We will be paving portions of Riverside Drive....As a requirement from the City of Burbank, we will be paving Riverside Drive from

Last Modified: 08/23/2023

3425 Brace Canyon View Study Final.pdf

trellis patio cover in the rear of the residence will be built over an existing paved...flat portion of the backyard and will be used to provide shade over an existing...

Last Modified: 01/13/2022

526 S Sunset Cyn Approved Plans.pdf

PAVING WALKWAY (E) LANDSCAPE AREA (E) CONC. PAVING WALKWAY (E) CONC....CONCRETE PAVING DRIVEWAY CONC....

Last Modified: 04/05/2022

Attachment 2 - 526 S. SUNSET CYN DR - Approved Plans - STAMPED

CONCRETE PAVING DRIVEWAY CONC. PAVING WALKWAY (E) CONC....PAVING WALKWAY (E) CONC. PAVING...

Last Modified: 02/16/2024

526 Sunset Cyn Plans.pdf

PAVING WALKWAY (E) LANDSCAPE AREA (E) CONC. PAVING WALKWAY (E) CONC....CONCRETE PAVING DRIVEWAY CONC....

Last Modified: 01/31/2022

Standard Plan Details And General Requirments_08-17-26

 Total square footage of impervious paved area (existing and proposed) on the...� Outline of all parking facilities including paved...

Last Modified: 08/17/2026

STANDARD PLAN FORMATTING 2022 (2).pdf

▪ Number of parking and loading spaces ▪ Paved area percentages ▪ Existing zoning... Outline of all parking facilities including paved...

Last Modified: 05/18/2022

ApxE_Updated Geotechnical Investigation.pdf

The site is currently occupied by Fry’s Electronics with associated paved parking...Paving recommendations are provided in Preliminary...

Last Modified: 07/09/2021

Attachment 1 - Ordinance CM draftt.pdf

For public trees, ground surfaces covered by existing public paving, such as streets...Only those ground surfaces not covered by existing paving...

Last Modified: 02/02/2023

STANDARD PLAN FORMATTING 2022.pdf

▪ Number of parking and loading spaces ▪ Paved area percentages ▪ Existing zoning... Outline of all parking facilities including paved...

Last Modified: 05/18/2022

ApxA1_AQandGHGTechnicalReport.pdf

Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers...Pavers 2 8.00 130 0.42 ...

Last Modified: 07/09/2021

UpperLARiver_Draft_Appendix4b.pdf

Downey CA Paving Stone of San Diego, Inc....Downey CA Paving Stone of San Diego, Inc....Downey CA Paving Stone of San...

Last Modified: 03/25/2021

526 S. SUNSET CYN DR - Project Plans - 09-29-23

CONCRETE PAVING DRIVEWAY CONC. PAVING WALKWAY (E) CONC....PAVING WALKWAY (E) CONC. PAVING...

Last Modified: 01/23/2024

20210622_NOI_2814_Empire_Ave_Final.pdf

AREA: 1,516 SF NON-PERMEABLE PAVING AREA: 300 SF PERMEABLE LAND AREA: OPEN...SPACE AREA: 23,937 SF LANDSCAPE AREA: 7,434 SF PERMEABLE PAVING...

Last Modified: 08/27/2021

DEIR Appendix D (LaTerra).pdf

Pave or apply water every three hours during daily construction activities or apply...Paving 6/30/2025 9/26/2025 5 65 5 Architectural Coating...

Last Modified: 05/04/2021

840 E Verdugo - Plans

AREA TO REMAIN (EXIST'G) PAVED AREA NO WORK paved area no work PAVED AREA...pad area (EXIST'G)...

Last Modified: 08/18/2022

Attachment 4 - Redline of Title 7, Chapter 4 of the BMC .pdf

For public trees, ground surfaces covered by existing public paving, such as streets...Only those ground surfaces not covered by existing paving...

Last Modified: 02/02/2023

Att2 - Summary of Proposed Changes

overspray and avoid run-off into streets, sidewalks, parking lots, alleys or other paved...(4) Do not hose or wash driveways, patios, sidewalks, or other hard or...

Last Modified: 06/18/2026

East Olive Reconfiguration Restriping Project Scheduled for March 17–20, 2025

Olive Avenue was installed in February 2024 as part of the Citywide Residential Paving

Last Modified: 03/11/2025

Re-Scheduled Due to Weather: East Olive Reconfiguration Restriping Project Set for March 24–27, 2025

Olive Avenue was installed in February 2024 as part of the Citywide Residential Paving

Last Modified: 03/14/2025

20210301_AvionPlansPart3_Avion.pdf

" HIGH BOARD FORM CONCRETE PERIMETER WALL · METAL AND WOOD TRELLIS · ENHANCED PAVING...ACCENT STRING LIGHTING RETAIL PLAZA · TABLES, CHAIRS AND UMBRELLAS · ENHANCED...

Last Modified: 03/31/2021

Reminder: East Olive Reconfiguration Restriping Project Set for March 24–27, 2025

Olive Avenue was installed in February 2024 as part of the Citywide Residential Paving

Last Modified: 03/20/2025

Planning_3001 W Empire Architectural Set.pdf

(32%): 1,787 SF NON-PERMEABLE PAVING (26%): 1,466 SF LEVEL 2 TERRACE: OPEN SPACE...STREET TREE (TO REMAIN) PERMEABLE PAVING TYP....STREET TREE...

Last Modified: 01/07/2022

20210101_Planning_Standard_Plan_Details.pdf

Outline of all parking facilities including paved areas/driveways leading to parking...drawings of all landscape architectural features such as walls, fences, lighting,...

Last Modified: 03/29/2021

20210101_Planning_Conditional_Use_Permit_Standard_Plan_Detail.pdf

Outline of all parking facilities including paved areas/driveways leading to parking...drawings of all landscape architectural features such as walls, fences, lighting,...

Last Modified: 03/29/2021

Planning_2021_STANDARD PLAN FORMATTING 2022 final.pdf

Outline of all parking facilities including paved areas/driveways leading to parking...drawings of all landscape architectural features such as walls, fences, lighting,...

Last Modified: 01/26/2022

BCC Handbook - April 2026 _FINAL - website version

238-5026 Marisa Garcia, Parks and Recreation Director ............ (818) 238-5310...Director (818) 238-5026 Marisa Garcia, Parks and Recreation Director (818)...

Last Modified: 07/15/2026

BCC Handbook - July 2026

238-5026 Marisa Garcia, Parks and Recreation Director ............ (818) 238-5310...Director (818) 238-5026 Marisa Garcia, Parks and Recreation Director (818)...

Last Modified: 08/10/2026

20200324-citywide-historic-context-report-001.pdf

The SCC planned on widening and paving Second Street, which by the early 1920s had...By December of 1925, nearly all of the streets within Benmar Hills had been ...

Last Modified: 03/24/2021

20210208-Complete-Streets-Preliminary-Recommendations-001.pdf

REDUCE HEAT ON THE STREET increase tree canopy and light colored paving materials...Increasing shade over paved surfaces, using light colored...

Last Modified: 02/08/2021

910 S Mariposa St - Landscape Plan Sets.pdf

Enhanced paving at main project entry.

Last Modified: 06/23/2023

910 S Mariposa St - LS Plan Sets.pdf

Enhanced paving at main project entry.

Last Modified: 11/16/2022

9-14-21 - PH - Attachment 2.pdf

overspray and avoid run-off into streets, sidewalks, parking lots, alleys or other paved...(4) Do not hose or wash driveways, patios, sidewalks, or other hard or...

Last Modified: 09/02/2021

STANDARD PLAN FORMATTING 2016 final.pdf

Outline of all parking facilities including paved areas/driveways leading to parking...drawings of all landscape architectural features such as walls, fences, lighting,...

Last Modified: 04/13/2022

511 E Elmwood Ave. 9.26.26

THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES OF SUFFICIENT SIZE UNDER ALL PAVED...SHOWN WITHIN PAVED AREAS FOR THE LOCATION AND THE...

Last Modified: 10/01/2026

Burbank-Glendale-Pasadena Regional Housing Trust Funds Burbank's Homeless Solutions Center

construction grant was approved by the Board of Directors at their May meeting, paving

Last Modified: 06/18/2024

Recirculated DEIR Appendices (LaTerra).pdf

Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers...Pavers 2 8.00 130 0.42 ...

Last Modified: 05/04/2021

Recirculated DEIR (LaTerra).pdf

Pavers 2 8.00 130 0.42 Paving Paving Equipment 2 8.00 132 0.36 Paving Rollers...Pavers 2 8.00 130 0.42 ...

Last Modified: 05/04/2021

SR - Sustainable Water Use Ordinance

/ Runoff Prohibition Irrigation runoff onto sidewalks, streets, alleys, and paved...Hardscape Washing Restrictions Washing sidewalks, driveways, patios, and...

Last Modified: 06/18/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet