Search Results

Showing results for "dWA 0859 3970 0884 Anggaran Dana Pemasangan Plafon PVC Ruang Tamu Mewah Gladagsari Boyolali"

No results were found that matched the keywords: dWA 0859 3970 0884 Anggaran Dana Pemasangan Plafon PVC Ruang Tamu Mewah Gladagsari Boyolali.
Search Results

2011 Earnings for Website 100K Employees.pdf

19,839.21$ 112,406.79$ KRISTOFF, DANA

Last Modified: 12/22/2020

2010 Earnings for Website 100K Employees.pdf

21,759.11$ 121,579.73$ KRISTOFF, DANA

Last Modified: 12/22/2020

Attachment 6 -2010 Census Urbanized Area Reference Map_Survey of Project Site.pdf

Mission Viejo San Juan Capistrano Rancho Santa Margarita Norco Agoura Hills Dana

Last Modified: 03/20/2023

Attachment A -2010 Census Urbanized Area Reference Map_Survey of Project Site.pdf (1)

Mission Viejo San Juan Capistrano Rancho Santa Margarita Norco Agoura Hills Dana

Last Modified: 06/23/2023

2016 Earnings for Website 100k Employees (Updated 03.05.20).pdf

22,023.17$ -$ 117,980.73$ KRISTOFF, DANA

Last Modified: 03/15/2021

2016 Earnings for Website 100k Employees.pdf

22,023.17$ -$ 117,980.73$ KRISTOFF, DANA

Last Modified: 03/13/2025

Organics Recycling

Last Modified: 04/21/2026

Decision Letter - 2710 Winona Ave - AUP - 2.28.26 (all attachments)

(TYP TC-ER) REGULATORY COMPLIANCE/CERTIFICATIONS ISO 9001:2015 CROSS-SECTION PVC...THWN-2 COPPER CONDUCTOR (QTY=3) 8 AWG 19 STRAND TINNED COPPER CONDUCTOR BLACK...

Last Modified: 03/02/2026

3252 N Frederic St 1-29-22.pdf

METAL CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 02/08/2022

2025-08-08_Full Set (Arch+Civil+Land) - Copy

RAIN SENSORRSD C IRRIGATION PIPING 1 14" IRRIGATION PRESSURE MAINLINE SCH. 40 PVC...- BURY MIN. 18" BELOW GRADE WITH SCH. 80 FITTINGS NON-PRESSURE LATERAL SCH. 40...

Last Modified: 12/02/2025

2017 Earnings for Website 100k Employees (Updated 03.05.2020).pdf

$ -$ 107,687.94$ KRISTOFF, DANA

Last Modified: 03/15/2021

2018 Earnings for Website 100k Employees (Updated 03.05.20).pdf

$ -$ 103,618.09$ KRISTOFF, DANA

Last Modified: 03/15/2021

2017 Earnings for Website 100k Employees.pdf

$ -$ 107,687.94$ KRISTOFF, DANA

Last Modified: 03/15/2021

2018 Earnings for Website 100k Employees.pdf

$ -$ 103,618.09$ KRISTOFF, DANA

Last Modified: 03/15/2021

2018 Earnings for Website 100k Employees.pdf

$ -$ 103,618.09$ KRISTOFF, DANA

Last Modified: 03/15/2021

2017 Earnings for Website 100k Employees.pdf

$ -$ 107,687.94$ KRISTOFF, DANA

Last Modified: 03/15/2021

3209 Castleman Ln Approved Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 12/14/2022

Afterschool Daze (ASD)

Afterschool Daze (ASD) provides a safe environment for children with activities that enhance the children's physical, social, and cognitive development. Experienced staff lead participants in activities such as games, sports, nature, cooking, crafts, science, fitness, and special events.

Last Modified: 02/09/2026

2025 AUG ISSUED

INSTALL NEW SARNAFIL PVC SINGLE PLY ROOF 1000 SF Commercial Roofing Systems, Inc...DANA BARNES 5082599477 91505CABURBANK Owner 330 N MAPLE ST,...

Last Modified: 09/02/2025

20210101_1258_E_Elmwood_ProjectPlans.pdf

PER SQUARE INCH PSL PARALLEL STRAND LUMBER PT POINT P-T POST TENSION PTD PAINTED PVC

Last Modified: 04/13/2021

2022 BPAP Plan Check Correction List

conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 11/15/2024

05.15.24_636 MARIPOSA_ISSUE FOR PLAN CHECK

PVC. P.L. P.S.I. PAIR PLGL. PLAS. LAM. PLAS. PLWD. PLMB. PL. PT. P....TO PROPOSED RAIN WATER HARVESTING TANKS 1 CLASS "A" COMPOSITION HIGH-QUALITY,...

Last Modified: 05/30/2024

ApxE_Updated Geotechnical Investigation.pdf

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or other...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET...

Last Modified: 07/09/2021

3201 Olive - Full Application Cover Letter - 6-27-23 with attachments.pdf

Mission Viejo San Juan Capistrano Rancho Santa Margarita Norco Agoura Hills Dana...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 07/25/2023

Recreation Classes

The City of Burbank Recreation Guide is published quarterly and features activities and classes for all ages. To register for classes, please visit: burbankparks.com.

Last Modified: 04/14/2026

2025 SEPT ISSUED

INSTALL PVC ROOF. TOTAL OF 5000 SF....Maintenance $307,000.00Valuation: GO OVER (E) 1-LAYER ROOF WITH ANOTHER LAYER SARNAFIL PVC

Last Modified: 10/06/2025

Combined Attachments A-N.pdf

Mission Viejo San Juan Capistrano Rancho Santa Margarita Norco Agoura Hills Dana...######## 4825 SAN L OAKLAND 94601 95-100% ALAMEDA 201426 37.7665 -122.214...

Last Modified: 05/24/2023

Signed NOP final

" 2" 10" 2" 8" VCP 8" V C P 8" V C P 24" HDPE 18 " H D PE 6" PVC

Last Modified: 03/06/2025

Signed NOP final

" 2" 10" 2" 8" VCP 8" V C P 8" V C P 24" HDPE 18 " H D PE 6" PVC

Last Modified: 03/07/2025

2025 Residential Correction List (1)

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 03/26/2026

2025 BPAP Plan Check Correction List

metal conduit, intermediate metal conduit, electrical metallic tubing, schedule 80 PVC

Last Modified: 03/26/2026

20220316-Rancho-Providencia-Neighborhood-Protection-Plan-1998-002.pdf

SHANNON HANAWAY, CAC member, supported the plan and read a letter from LINDA and DANA

Last Modified: 04/23/2026

2025 MAR ISSUED

INSTALL NEW 80 MIL PVC SARNAIL SINGLE PLY ROOFING SYSTEM, FULLY ADHERED....INSTALL NEW 80 MIL PVC SARNAFIL SINGLE-PLY ROOFING SYSTEM, FULLY ADHERED.

Last Modified: 04/04/2025

250220_City of Burbank - Home Again Los Angeles

USE PVC FOR BELOW GRADE....USE PVC FOR BELOW GRADE..../S DR 11 C PVC COPPER D WV ABS O R PVC...

Last Modified: 02/25/2025

624 S Victory Blvd - (2-29-24) Phase 3 - WIne Tasting

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 04/12/2024

DEIR Appendix G-4A (LaTerra).pdf

VOLUME FLUID USED 10/10/2017 81' bgs 3/4" PVC 0.020" Horizontal 2" N/A N/A...VOLUME FLUID USED 10/10/2017 53' bgs 3/4" PVC 0.020"...

Last Modified: 05/04/2021

Attachment J - Preliminary Low Impact Development Plan (LID).pdf 1

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 06/26/2023

Updated_Preliminary_Low_Impact_Development_Report.pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 10/29/2024

Preliminary_Low_Impact_Development_Report

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 05/14/2024

Attachment J - Preliminary Low Impact Development Plan (LID).pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 05/11/2023

Preliminary_LID_Report.pdf

Overflow Pipe - Sch. 40 PVC mated to drainage pipe at base seal. 11....Due to the corrosive potential of the soils, it is recommended that PVC,...

Last Modified: 01/11/2024

Appendix F_HazMat Studies_Part 2.pdf

One- inch diameter polyvinyl chloride (PVC) casing was used as a guide for the tubing...approximately one- foot long sand pack around the polypropylene filter, at which...

Last Modified: 12/13/2024

Project Plans - 2925 N Lamer St

PVC SCH 40.

Last Modified: 02/07/2025

2925 N Lamer St_Plans_c4_1.27.25

PVC SCH 40.

Last Modified: 03/04/2025

Appendix B - Phase I ESA.pdf

SANBURG Cole Information 1995 SANBURG, DANA E Cole Information 1992 SANBURG, DANA...E Haines Company, Inc. 2001 SANBURG...

Last Modified: 01/07/2025

4. Board of Library Trustees_Redacted

Dana Cobern-Kullman.pdf City of Burbank Boards, Commissions & Committees Application

Last Modified: 06/13/2024

FINAL-Burbank.CA.2801 Thornton Ave. Phase I

SANBURG Cole Information 1995 SANBURG, DANA E Cole Information 1992 SANBURG, DANA...E Haines Company, Inc. 2001 SANBURG...

Last Modified: 04/03/2025

Soils Report.pdf

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET ...

Last Modified: 02/08/2023

Soils Report.pdf (1)

Due to the corrosive potential of the soils, it is recommended that PVC, ABS or...SCHEDULE 40 PERFORATED PVC PIPE EXTENDED TO APPROVED OUTLET ...

Last Modified: 06/23/2023

2021_Planning_630_S_Parish_Pl_Approved Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 06/28/2021

Plans formal submittal #2_Part3

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

Plans formal submittal #2_Part3 (1).pdf

UNDERGROUND CONDUITS IF ANY SHALL BE PVC SCHEDULE 40. 3.

Last Modified: 11/14/2024

20210507_630_Parish Pl_Plans.pdf

Preservative Treated / Point PTD Paper Towel Dispenser PTN Partition PVC

Last Modified: 05/07/2021

20210519_504_Hampton_Road.pdf

BY RIGID CONDUIT, INTERMEDIATE CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 05/18/2021

1. Police Commission_Redacted.pdf

TCP/IP, IPX, AppleTalk, Ethernet, FE, GE, IEEE 802.1Q, VRRP/HSRP, SIP, POS, ATM PVC

Last Modified: 06/15/2023

UpperLARiver_Draft_Appendix4a.pdf

o PVC liners used for the lining of bioretention should meet the requirements of...The PVC liner should resist ultraviolet and shall be...

Last Modified: 03/25/2021

UpperLARiver_Draft_Appendix7.pdf

maintenance (MH), including Shoring, per Plan $ 36,800.00 1 17 Install 12" ø PVC...than 0.5 in/hr and should meet the following criteria:  Minimum 4-inch slotted,...

Last Modified: 03/25/2021

UpperLARiver_Draft_Appendix5.pdf

Inlet Pipe Diameter/Type (i.e. 8” / PVC): ___________________________________...Inlet Pipe Invert Elevation if applicable: 13a Inlet Pipe DiameterType ie 8 ...

Last Modified: 03/25/2021

3411 Viewcrest Dr - Final Plans.pdf

CONDUIT, INTERMEDIATE METAL CONDUIT, ELECTRICAL METALLIC TUBING, SCHEDULE 80 PVC

Last Modified: 06/15/2023

2026 FEB ISSUED

$50,000.00Valuation: RE-ROOF GARAGE STRUCTURE (5000 SF): REMOVE (E) ROOF, INSTALL NEW 60 MIL PVC

Last Modified: 03/03/2026

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet