Search Results

Showing results for "dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara"

No results were found that matched the keywords: dWA 0821 1305 0400 Jasa Kontraktor Hydroseeding Green Project Buton Tengah Sulawesi Tenggara.
Search Results

Revised Appeal Form_2026 (Fillable)

Project Address: Project Number: Type of Application: Appealing Action.../Burbank10/Burbank100119.html mailto:[email protected] ...

Last Modified: 02/05/2026

Burbank - 2024-25 CAPER FINAL Website.pdf

(Various Infrastructure Projects) 2 Projects (YMCA Elevator Lift Replacement...projects funded in FY 2024/25) ...

Last Modified: 10/28/2025

Burbank - 2024-25 CAPER FINAL Website (1).pdf

(Various Infrastructure Projects) 2 Projects (YMCA Elevator Lift Replacement...projects funded in FY 2024/25) ...

Last Modified: 04/15/2026

Draft Development Standards.pdf

This Section shall apply to all projects proposing a new, or improvements to an...Project Application. A project...

Last Modified: 01/19/2024

North Varney Street Evening Closures June 24-August 30, 2024

from June 24th through August 30th for Burbank Water and Power’s Campus Stormwater Project...from June 24th through August 30th for Burbank Water and Power’s Campus...

Last Modified: 06/18/2024

California High Speed Rail

Last Modified: 05/20/2026

Exhibit B - Appeal Submittal_Redacted

community at large are appealing the granting of the AUP permit as the proposed project...The first public notice did not hold transparency as the description of such...

Last Modified: 07/24/2024

20210301 - FY 14-15 Annual Report

for which transferred funds have been or will be expended if that project has not...Construction of project has been completed....in real property...

Last Modified: 04/30/2021

5-3 - PH Attachment 5

Project No.20- 0002167 | Housing Element, Safety Element and Environmental Justice...PROJECT DESCRIPTION: Receive public comment for the Draft...

Last Modified: 04/21/2022

Attachment 5 - Planning Board Minutes 3.14 FINAL.pdf

Project No.20- 0002167 | Housing Element, Safety Element and Environmental Justice...PROJECT DESCRIPTION: Receive public comment for the Draft...

Last Modified: 04/21/2022

FY 24-25 Annual Action Plan (1).pdf

to the City Council for consideration on a project-by-project basis....AP-35 Projects – 91.220(d) Introduction ...

Last Modified: 04/15/2026

Call for Artists – Johnny Carson Park Shade Structure Public Artwork

Detailed information and instructions on submitting a proposal for this project are...This project is part of the City’s Art in Public Places...

Last Modified: 04/01/2024

Updated Construction Notice for East Providencia and South Sixth Street

Please be advised of a construction project taking place on the South...Please be advised of a construction project taking place on the...

Last Modified: 08/21/2025

8.5x14_6.24 Notice NoHo BRT Potholing- Burbank Glenoaks Providencia.pdf

metro.net Metro.net/nohopasbrt North Hollywood to Pasadena Bus Rapid Transit Project...September 2025 Summary: The North Hollywood to Pasadena Bus Rapid Transit...

Last Modified: 09/18/2025

3252 N Frederic St - Approved Plans.pdf

FAR REVISE DATES: SCALE: CHECKED BY: DRAWN BY: JOB NUMBER: PROJECT INFO DATE...OTHER THAN THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN...

Last Modified: 04/05/2022

650 S. Sixth Street

Last Modified: 09/17/2025

3201 W Olive Avenue

Last Modified: 09/17/2025

20211209-GAS-Letter-FY-June-30-2021.pdf

Cause: While having been put into use, project managers had a minor amount of work...they desired to complete on the projects prior to closing...

Last Modified: 12/09/2021

3-1-22 - ED - Attachment 1_Redacted

As a project manager for several engineering projects at the Inland Empire Utility...project setup, invoice...

Last Modified: 02/04/2022

8.5x14_8.29 Notice NoHo BRT Potholing- Burbank Olive Lake 9.2.25.pdf

metro.net Metro.net/nohopasbrt North Hollywood to Pasadena Bus Rapid Transit Project...September 2025 Summary: The North Hollywood to Pasadena Bus Rapid Transit...

Last Modified: 09/09/2025

8.5x14_8.29 Notice NoHo BRT Potholing- Burbank Olive Lake 9.2.25 (1).pdf

metro.net Metro.net/nohopasbrt North Hollywood to Pasadena Bus Rapid Transit Project...September 2025 Summary: The North Hollywood to Pasadena Bus Rapid Transit...

Last Modified: 09/09/2025

8.5x14_6.24 Notice NoHo BRT Potholing- Burbank Olive San Fernando 9.2.25.pdf

metro.net Metro.net/nohopasbrt North Hollywood to Pasadena Bus Rapid Transit Project...September 2025 Summary: The North Hollywood to Pasadena Bus Rapid Transit...

Last Modified: 09/09/2025

3252 N Frederic St 1-29-22.pdf

FAR REVISE DATES: SCALE: CHECKED BY: DRAWN BY: JOB NUMBER: PROJECT INFO DATE...OTHER THAN THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN...

Last Modified: 02/08/2022

Notice of Traffic Signal Shut-Down At Glenoaks Blvd & Magnolia Blvd

International Line Builders (ILB) for the Glenoaks Blvd and First St Signal Improvement Project...International Line Builders (ILB) for the Glenoaks Blvd and First St...

Last Modified: 08/12/2024

Intermittent Lane Closures at Glenoaks Boulevard

International Line Builders (ILB) for the Glenoaks Blvd and First St Signal Improvement Project...As part of this project, ILB will be restoring...

Last Modified: 07/25/2024

Closure Notice: George Izay Park and Surrounding Facilities May 6, 2026

false As part of the George Izay Park Irrigation Replacement and Modernization Project...As part of the George Izay Park Irrigation Replacement and Modernization...

Last Modified: 04/30/2026

SB1383 Business Requirements

Last Modified: 05/22/2026

Attachment 6 - Planning Board Minutes 5-9-2022_DRAFT.pdf

Project No. 22-0002020 | Community Facility Fees Zone Text Amendment | Resolution...and long-term resident home improvement projects....Elric...

Last Modified: 05/26/2022

20260422-DIFA6-002.pdf

HEARINGS PROJECT DESCRIPTION: 1. Project No....Development Impact Fees are fees Zone Text charged to new development...

Last Modified: 04/23/2026

Attachment 2 – Proposed Redline Changes to BMC.pdf

The art project shall be located on-site as follows: at least 50 percent of the...Allocation shall be invested in works of art on the exterior of the Development ...

Last Modified: 01/11/2024

UPDATE: Burbank Must Temporarily Stop Outdoor Irrigation for Two Weeks, Starting September 6, 2022

Burbank elected to limit the water we take from the State Water Project to ensure...Due to the additional water needed from the State Water Project...

Last Modified: 10/05/2022

BVP April2024NEWSLETTER_Derrick Baker.pdf

The Burbank Volunteer Pro- gram has grown so much with countless volunteer projects...PROJECT H.O.P.E....Project H.O.P.E....

Last Modified: 04/17/2024

BVP April2024NEWSLETTER_Derrick Baker (1).pdf

The Burbank Volunteer Pro- gram has grown so much with countless volunteer projects...PROJECT H.O.P.E....Project H.O.P.E....

Last Modified: 04/17/2024

BWP 5.20.25 -SR - Proposed Adjustments in Water Electric Wastewater and Solid Waste Rates - CCO edits + CM EDITS

Raftelis conducted a comprehensive review of prior and projected utility costs,...The Project Share Program is funded by generous donors who...

Last Modified: 05/08/2025

Media District Specific Plan Update - EIR Scoping Meeting November 16, 2023

to the environmental review process for the Media District Specific Plan Update project...to the environmental review process for the Media District Specific Plan Update...

Last Modified: 12/04/2023

Notice of Traffic Signal Shut-Downs

International Line Builders (ILB) for the Glenoaks Blvd and First St Signal Improvement Project...International Line Builders (ILB) for the Glenoaks Blvd and First St...

Last Modified: 12/02/2024

Notice of Traffic Signal Shut-Downs at Glenoaks and Magnolia November 13, 2024

International Line Builders (ILB) for the Glenoaks Blvd and First St Signal Improvement Project...International Line Builders (ILB) for the Glenoaks Blvd and First St...

Last Modified: 11/12/2024

CHANGE OF RESPONSIBLE PARTY

Existing Project Address (including building or suite No.): Project Number:...Authorized Signature Print Name: Date: Signature: ...

Last Modified: 02/09/2026

Attachment 6 - Appeal Submittal (Appeal of the Director's Decision)

community at large are appealing the granting of the AUP permit as the proposed project...The first public notice did not hold transparency as the description of such...

Last Modified: 10/18/2024

Attachment 6 - Budget Matrix 24-25.Public Hearing.pdf

----------------------------------------------------------------- General Fund Projected...Spendable Fund Balance for June 30, 2025 NON-RECURRING ...

Last Modified: 05/24/2024

Sort Filter Search Results

Sort & Filter Search Results

Sort

Sort
Filter by:

Type Facet

Type
Type Facet
Department:

Site Facet

Site
Site Facet